Skip to content
Figure 0.1 · BRIEFING
BID #268001 · ODOTRESULT · awarded Mar 12

WYA-US 30 Rest Areas TP

WYA County · est $3.9M

Bid dateThursday, March 12
Awarded toEAGLE BRIDGE CO$3.39M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

81ITEMS
  • Drainage21%
  • Signals & Lighting12%
  • Earthwork11%
  • Curb, Walk & Ramp9%
  • Erosion & Landscaping9%
  • Structures / Bridge5%
  • Other33%

Top items by winning bid

ItemQtyUnit priceExtended%
452E14010 10" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P15,522 SY$87.5$1.36M40%
304E20000 AGGREGATE BASE4,433 CY$65$288k8%
203E10000 EXCAVATION19,196 CY$13$250k7%
202E23000 PAVEMENT REMOVED12,653 SY$13$164k5%
624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $273,500.00 2 $86,100.00 3 $201,400.00 4 $312,800.00 5 $330,500.00 6 $213,199.42 7 $292,000.00 8 $308,480.00 9 $257,500.00 10 $255,200.001 LS$157,500$158k5%
206E10500 CEMENT419 TON$223.5$94k3%
625E15000 LIGHT TOWER FOUNDATION, 36" X 15' DEEP10 EACH$9,200$92k3%
206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP16,203 SY$5.5$89k3%
609E28000 CURB, TYPE 72,651 FT$23$61k2%
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$50,000$50k1%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 61 more items below.

Rank 1Eagle Bridge CO$3.39MRank 2Helms And Sons Excavating$3.44MRank 3Trucco Construction CO INC$3.45MRank 4Great Lakes Construction CO$3.55MRank 5Advanced Excavating & Demolition$3.57MRank 6LLC Mosser Construction INC$3.60MRank 7Kokosing Construction Company INC$3.79MRank 8Shelly & Sands INC$4.03MRank 9Complete General Construction Company$4.19MRank 10Rietschlin Construction INC$4.21M
ItemQuantityR1Eagle Bridge COR2Helms And Sons ExcavatingR3Trucco Construction CO INCR4Great Lakes Construction COR5Advanced Excavating & DemolitionR6LLC Mosser Construction INCR7Kokosing Construction Company INCR8Shelly & Sands INCR9Complete General Construction CompanyR10Rietschlin Construction INC
452E14010 10" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P15,522 SY$87.50$92.00$96.40$90.00$86.00$82.00$87.00$110$94.25$96.00
304E20000 AGGREGATE BASE4,433 CY$65.00$56.00$63.00$60.00$67.00$140$77.00$77.00$80.00$68.00
203E10000 EXCAVATION19,196 CY$13.00$11.00$11.00$10.50$9.75$9.50$18.00$13.00$35.00$27.00
202E23000 PAVEMENT REMOVED12,653 SY$13.00$13.50$13.00$12.00$15.00$15.15$11.00$12.00$15.00$16.00
624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $273,500.00 2 $86,100.00 3 $201,400.00 4 $312,800.00 5 $330,500.00 6 $213,199.42 7 $292,000.00 8 $308,480.00 9 $257,500.00 10 $255,200.001 LS$157,500$20,000$100,000$175,000$150,000$100,000$185,000$192,000$100,000$150,000
206E10500 CEMENT419 TON$224$245$235$200$200$200$200$215$223$273
625E15000 LIGHT TOWER FOUNDATION, 36" X 15' DEEP10 EACH$9,200$7,078$9,300$6,182$6,500$6,182$7,250$9,877$9,200$7,357
206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP16,203 SY$5.50$5.00$3.05$4.40$4.50$4.64$5.25$4.20$6.20$5.00
609E28000 CURB, TYPE 72,651 FT$23.00$25.00$33.00$35.00$20.00$17.00$35.00$35.00$36.38$26.00
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$50,000$20,000$20,800$27,500$70,000$18,699$15,000$22,000$30,000$50,000
625E26262 LUMINAIRE, HIGH MAST, SOLID STATE (LED), HMLED_P3_40 EACH$1,200$1,300$1,220$1,203$1,225$1,203$1,500$1,289$1,200$1,432
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $136,392.50 2 $193,084.05 3 $102,730.40 4 $134,519.87 5 $147,366.80 6 $177,453.87 7 $113,515.85 8 $124,843.55 9 $167,075.08 10 $201,126.7544,000 EACH$1.00$1.00$1.00$1.00$1.00$1.00$1.00$1.00$1.00$1.00
608E10000 4" CONCRETE WALK6,186 SF$7.00$6.25$12.70$8.00$6.75$7.50$9.50$10.00$9.00$7.50
611E04401 12" CONDUIT, TYPE B, AS PER PLAN472 FT$90.00$128$82.00$130$90.00$66.00$210$112$135$153
203E20000 EMBANKMENT3,118 CY$13.00$8.00$2.60$3.50$10.75$4.20$3.00$20.00$7.00$11.00
625E10503 LIGHT POLE (INSTALLATION ONLY), AS PER PLAN (LIGHT10 EACH$3,000$2,290$3,050$2,000$2,000$2,000$7,250$3,221$3,000$2,380
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$30,000$18,500$25,000$56,100$50,000$72,000$40,000$45,800$85,000$25,000
625E23300 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE5,850 FT$5.00$8.50$5.10$7.74$8.00$7.74$5.75$5.40$5.00$9.25
646E20200 PARKING LOT STALL MARKING15,894 FT$1.75$2.00$1.90$1.75$3.50$2.75$1.75$2.00$1.75$2.25
659E00300 TOPSOIL1,800 CY$15.00$45.00$5.00$24.00$35.00$51.00$14.00$20.00$40.00$48.00
Show all 81 line items
ItemQuantityR1Eagle Bridge COR2Helms And Sons ExcavatingR3Trucco Construction CO INCR4Great Lakes Construction COR5Advanced Excavating & DemolitionR6LLC Mosser Construction INCR7Kokosing Construction Company INCR8Shelly & Sands INCR9Complete General Construction CompanyR10Rietschlin Construction INC
201E11000 CLEARING AND GRUBBING1 LS$15,000$35,750$6,700$8,500$65,000$3,600$45,000$45,000$30,000$30,000
202E30000 WALK REMOVED2,459 SF$1.25$1.00$1.90$1.50$4.25$1.50$3.00$0.90$4.50$3.00
202E32000 CURB REMOVED4,628 FT$3.00$2.00$3.20$2.00$7.00$2.50$5.00$3.00$9.00$4.00
202E34900 PIPE REMOVED938 FT$12.00$26.00$31.00$37.00$12.00$15.00$20.00$28.00$20.00$54.00
202E58000 MANHOLE REMOVED1 EACH$325$825$830$1,400$950$800$1,200$1,000$700$3,900
202E58200 INLET REMOVED10 EACH$250$412$1,570$900$725$450$950$718$600$820
204E45000 PROOF ROLLING8 HOUR$150$115$334$200$360$240$220$500$250$500
206E11000 CURING COAT16,203 SY$1.30$1.10$1.00$1.20$1.25$1.20$1.20$1.30$1.29$1.25
607E98000 FENCE, MISC.:DUMPSTER SCREEN WALL104 FT$225$215$225$193$195$195$222$225$200$268
608E10001 4" CONCRETE WALK, AS PER PLAN500 SF$7.00$6.25$14.40$16.00$14.00$7.50$18.50$14.50$12.00$10.50
690E50600 SPECIAL - BOLLARD Section 1 - ROADWAY - Totals Awd $782,738.65 2 $767,074.30 3 $738,213.35 4 $695,542.30 5 $802,560.00 6 $687,189.57 7 $893,017.55 8 $846,996.60 9 $1,302,535.28 10 $1,181,071.7512 EACH$575$1,400$580$920$1,325$920$1,063$1,000$950$685
601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT2 SY$200$250$500$130$275$161$140$253$170$261
601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA18 CY$100$200$134$170$170$168$250$208$160$250
659E00100 SOIL ANALYSIS TEST2 EACH$450$1,350$620$70.00$70.00$397$70.00$150$100$180
659E10000 SEEDING AND MULCHING16,215 SY$1.65$2.00$0.90$0.92$0.95$0.92$0.92$1.00$1.34$1.75
659E14000 REPAIR SEEDING AND MULCHING811 SY$3.00$1.20$1.10$0.92$0.50$0.92$1.00$1.50$1.34$1.00
659E15000 INTER-SEEDING811 SY$3.00$1.20$1.10$0.70$0.50$0.70$0.50$0.50$1.34$1.00
659E20000 COMMERCIAL FERTILIZER2.26 TON$1,250$940$1,020$850$820$850$820$820$500$1,400
659E31000 LIME3.35 ACRE$5.00$55.00$730$35.00$1.00$35.00$1.00$1.00$10.00$150
659E35000 WATER90 MGAL$12.00$1.10$15.00$1.00$0.50$1.00$0.50$0.50$1.00$12.00
832E15000 STORM WATER POLLUTION PREVENTION PLAN1 LS$3,250$3,000$2,800$4,000$1,500$2,800$2,800$3,000$5,000$2,100
832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS1 LS$12,500$9,500$6,400$10,500$6,500$6,420$8,560$6,890$7,500$14,500
832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA1 LS$11,000$12,000$13,400$11,000$10,500$9,934$10,000$10,665$10,000$14,000
611E00400 4" CONDUIT, TYPE E220 FT$25.00$62.00$25.00$15.00$30.00$18.00$18.00$27.00$25.00$22.00
611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS32 FT$23.00$45.00$32.00$23.00$52.00$50.00$30.00$31.00$25.00$37.00
611E05901 15" CONDUIT, TYPE B, AS PER PLAN10 FT$200$250$274$365$75.00$185$425$330$175$620
611E07401 18" CONDUIT, TYPE B, AS PER PLAN10 FT$220$240$262$525$200$200$450$353$190$640
611E07900 18" CONDUIT, TYPE D178 FT$65.00$140$72.00$110$85.00$82.00$155$94.00$140$130
611E98150 CATCH BASIN, NO. 35 EACH$4,500$4,400$5,900$6,000$4,000$5,500$5,000$5,300$4,000$5,500
611E98180 CATCH BASIN, NO. 3A1 EACH$3,900$3,800$4,200$5,500$3,500$4,500$4,250$4,800$4,000$5,700
611E98470 CATCH BASIN, NO. 2-2B1 EACH$2,250$2,400$3,150$3,600$3,000$3,000$2,750$2,800$2,150$2,525
611E98860 INLET, NO. 2-A-102 EACH$7,000$8,500$9,100$6,900$6,000$10,500$8,250$9,000$6,500$10,000
611E99574 MANHOLE, NO. 32 EACH$4,000$4,700$4,240$6,000$3,650$6,950$5,200$6,000$5,000$5,700
611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN1 EACH$1,725$1,500$2,550$3,000$1,500$3,680$2,800$8,000$3,250$3,450
611E99710 PRECAST REINFORCED CONCRETE OUTLET Section 3 - DRAINAGE - Totals Awd $117,186.00 2 $162,066.00 3 $130,484.00 4 $162,231.00 5 $117,424.00 6 $129,188.00 7 $202,455.00 8 $156,058.00 9 $151,290.00 10 $185,155.001 EACH$325$650$1,000$455$1,500$450$375$600$300$600
452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P156 SY$64.50$82.00$130$215$95.00$74.00$90.00$170$98.00$87.00
609E26000 CURB, TYPE 6368 FT$24.00$26.00$34.00$50.00$19.25$16.50$43.00$59.50$48.50$35.25
609E98000 CURB, MISC.:CURB, TYPE 7 TURNOUT Section 4 - PAVEMENT - Totals Awd $1,731,737.00 2 $1,768,907.00 3 $1,913,974.80 4 $1,827,685.00 5 $1,717,827.00 6 $1,961,657.00 7 $1,830,404.00 8 $2,212,062.00 9 $1,959,532.58 10 $1,891,226.0010 FT$555$400$1,810$2,000$1,100$555$1,600$2,210$1,236$420
625E00450 CONNECTION, FUSED PULL APART20 EACH$100$200$102$176$176$176$225$107$100$209
625E00480 CONNECTION, UNFUSED PERMANENT33 EACH$150$194$152$170$170$170$180$161$150$202
625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE4,935 FT$2.75$5.50$2.80$5.04$5.25$5.04$3.00$3.00$2.75$6.00
625E25504 CONDUIT, 3", 725.0513,490 FT$7.25$10.20$7.40$9.31$9.50$9.31$12.50$7.80$7.25$11.25
625E29002 TRENCH, 24" DEEP3,490 FT$5.50$14.00$5.60$12.64$12.75$12.64$12.00$6.00$5.50$15.25
625E30706 PULL BOX, 725.08, 24"11 EACH$1,500$1,600$1,520$1,420$1,425$1,420$2,500$1,610$1,500$1,690
625E31510 PULL BOX REMOVED3 EACH$500$735$510$640$650$640$400$537$500$762
625E32000 GROUND ROD20 EACH$300$355$305$310$310$310$350$322$300$370
625E36010 UNDERGROUND WARNING MARKING TAPE3,490 FT$1.75$2.50$1.80$2.13$2.25$2.13$0.30$2.00$1.75$2.75
625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING1 LS$1,600$45,000$1,630$39,960$40,000$39,960$6,000$1,718$1,600$47,600
625E75350 LIGHT TOWER REMOVED2 EACH$2,000$1,350$2,030$1,160$1,175$1,160$3,500$2,147$2,000$1,381
625E75506 LUMINAIRE REMOVED2 EACH$250$180$254$160$160$160$150$268$250$191
625E75540 LIGHT TOWER FOUNDATION REMOVED2 EACH$600$2,150$610$1,860$1,900$1,860$1,800$644$600$2,215
625E98000 LIGHTING, MISC.:TEST EXISTING CIRCUIT Section 5 - LIGHTING - Totals Awd $305,676.25 2 $411,197.50 3 $310,489.00 4 $368,294.10 5 $376,638.75 6 $368,294.10 7 $408,634.50 8 $329,421.00 9 $305,676.25 10 $440,701.002 EACH$2,000$2,900$2,030$2,500$2,500$2,500$2,800$2,147$2,000$2,975
630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X1250 FT$50.00$90.00$50.00$79.00$80.00$79.00$79.00$53.00$80.95$59.50
630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION2 EACH$650$960$650$840$840$850$840$700$861$774
630E80100 SIGN, FLAT SHEET98 SF$30.00$23.00$30.00$20.00$20.00$22.50$20.00$32.00$20.49$36.00
630E80200 SIGN, GROUND MOUNTED EXTRUSHEET90 SF$30.00$38.00$30.00$32.50$32.50$36.50$32.50$32.00$33.30$36.00
630E82000 SIGN BACKING ASSEMBLY12 EACH$175$190$175$165$165$165$165$190$169$209
630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION2 EACH$2,500$1,700$2,500$1,475$1,500$1,480$1,475$2,700$1,511$2,975
646E20320 WRONG WAY ARROW Section 6 - TRAFFIC CONTROL - Totals Awd $46,304.50 2 $51,812.00 3 $48,178.60 4 $45,209.50 5 $73,274.00 6 $61,738.50 7 $45,209.50 8 $51,634.00 9 $45,590.48 10 $57,831.506 EACH$325$375$240$325$350$325$325$350$325$387
614E11000 MAINTAINING TRAFFIC1 LS$15,000$15,000$23,800$32,000$50,000$7,500$25,000$20,000$27,500$20,000
619E16010 FIELD OFFICE, TYPE B6 MNTH$3,500$2,100$5,300$3,700$1,750$2,500$4,500$4,780$2,500$1,700

Project details

Description
WYA-US 30 Rest Areas TP
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →