ERI-SR 2/SR 4-07.72/08.24
ERI County · est $13M
Bid dateThursday, April 23—
Awarded toERIE BLACKTOP INC$11.8M
ERI County · est $13M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10300 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 22,475 CY | $225 | $5.06M | 43% |
| 255E16000 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 10,529 SY | $162.5 | $1.71M | 15% |
| 251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 3,529 CY | $196 | $692k | 6% |
| 251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 1,513 CY | $425 | $643k | 5% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 2,520 CY | $200 | $504k | 4% |
| 624E10000 MOBILIZATION Section 15 - INCIDENTALS - Totals Awd $725,020.00 2 $1,449,920.00 | 1 LS | $350,000 | $350k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (2.0 INCH) | 406,728 SY | $0.75 | $305k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $255,000 | $255k | 2% |
| 255E16000 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 1,137 SY | $162.5 | $185k | 2% |
| 617E10100 COMPACTED AGGREGATE | 2,605 CY | $62 | $162k | 1% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 97 more items below.
| Item | Quantity | R1Erie Blacktop INC | R2Gerken Paving INC | % of bid |
|---|---|---|---|---|
| 442E10300 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 22,475 CY | $225 | $215 | 47% |
| 255E16000 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 10,529 SY | $163 | $161 | 16% |
| 251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 3,529 CY | $196 | $225 | 6% |
| 251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 1,513 CY | $425 | $560 | 6% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 2,520 CY | $200 | $210 | 5% |
| 624E10000 MOBILIZATION Section 15 - INCIDENTALS - Totals Awd $725,020.00 2 $1,449,920.00 | 1 LS | $350,000 | $495,000 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (2.0 INCH) | 406,728 SY | $0.75 | $1.89 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $255,000 | $800,000 | 2% |
| 255E16000 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 1,137 SY | $163 | $190 | 2% |
| 617E10100 COMPACTED AGGREGATE | 2,605 CY | $62.00 | $80.00 | 1% |
| 807E14010 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, EDG | 34.49 MILE | $3,930 | $3,850 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 1,320 HOUR | $102 | $100 | 1% |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 41,848 FT | $2.65 | $2.50 | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 138 SNMT | $790 | $170 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 18,679 GAL | $5.40 | $5.00 | 1% |
| 407E10000 TACK COAT | 37,370 GAL | $2.55 | $2.50 | 1% |
| 621E00100 RPM | 2,474 EACH | $36.00 | $35.50 | 1% |
| 209E60500 LINEAR GRADING | 39.7 MILE | $2,000 | $1,900 | 1% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1,430 | $1,400 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 60 SNMT | $970 | $1,200 | 1% |
| Item | Quantity | R1Erie Blacktop INC | R2Gerken Paving INC |
|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 437.5 FT | $2.05 | $2.00 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 225 FT | $3.05 | $3.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 1 EACH | $300 | $295 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 6 EACH | $163 | $160 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $86.70 | $85.00 |
| 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B | 3 EACH | $138 | $135 |
| 203E20001 EMBANKMENT, AS PER PLAN | 55 CY | $76.50 | $75.00 |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 11.38 STA | $65.30 | $63.97 |
| 209E80000 GRADING MAILBOX APPROACHES | 11 EACH | $175 | $872 |
| 606E13000 GUARDRAIL, TYPE 5 | 425 FT | $22.00 | $21.60 |
| 606E16500 GUARDRAIL REBUILT, TYPE 5 | 225 FT | $15.10 | $14.80 |
| 606E26000 ANCHOR ASSEMBLY, TYPE B | 4 EACH | $2,680 | $2,625 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E (MASH 2016) | 6 EACH | $2,590 | $2,540 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 1 EACH | $1,415 | $1,385 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 4 EACH | $615 | $1,328 |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P | 2 EACH | $1,235 | $1,874 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND Section 1 - ROADWAY - Totals Awd $145,490.22 2 $146,861.17 | 1 LS | $10,500 | $5,000 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $2,000.00 2 $2,000.00 | 2,000 EACH | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 44 EACH | $1,035 | $1,000 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 6 EACH | $855 | $1,300 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL Section 3 - DRAINAGE - Totals Awd $56,545.00 2 $59,300.00 | 2,500 LB | $2.35 | $3.00 |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN (LONGITUDINAL) | 204 CY | $205 | $255 |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN (TRANSVERSE) | 88 CY | $490 | $615 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50 INCH) | 60,234 SY | $0.75 | $1.62 |
| 254E01600 PATCHING PLANED SURFACE | 2,338 SY | $8.20 | $13.25 |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 17,086 CY | $1.00 | $10.00 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) Section 4 - PAVEMENT - Totals Awd $9,759,351.32 2 $10,615,448.30 | 31.08 MILE | $903 | $885 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE Section 5 - WATER WORK - Totals Awd $1,170.00 2 $2,000.00 | 2 EACH | $585 | $1,000 |
| 620E31200 REMOVAL OF DELINEATOR | 13 EACH | $25.50 | $25.00 |
| 620E60000 DELINEATOR, POST SURFACE MOUNTED | 13 EACH | $148 | $145 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2,447 EACH | $5.25 | $6.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1 WAY | 22 EACH | $14.70 | $13.50 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 2 EACH | $15.30 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 5.36 MILE | $1,020 | $1,000 |
| 642E00300 CENTER LINE, TYPE 1 | 2.35 MILE | $1,020 | $1,000 |
| 644E00404 CHANNELIZING LINE, 12" | 2,661 FT | $2.05 | $2.00 |
| 644E00500 STOP LINE | 295 FT | $8.15 | $8.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 887 FT | $8.15 | $8.00 |
| 644E00720 CHEVRON MARKING | 907 FT | $8.15 | $8.00 |
| 644E01300 LANE ARROW | 62 EACH | $128 | $125 |
| 644E40000 SPEED MEASUREMENT MARKING | 20 EACH | $255 | $250 |
| 646E10010 EDGE LINE, 6" | 1.18 MILE | $6,120 | $6,000 |
| 646E10110 LANE LINE, 6" | 0.44 MILE | $4,080 | $4,000 |
| 646E10200 CENTER LINE | 0.11 MILE | $8,160 | $8,000 |
| 646E10310 CHANNELIZING LINE, 12" | 48 FT | $5.10 | $5.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 480 FT | $20.40 | $20.00 |
| 646E20504 DOTTED LINE, 6" | 28 FT | $5.10 | $5.00 |
| 807E14110 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, LAN | 15.69 MILE | $1,890 | $1,850 |
| 807E14310 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, CHA | 4,485 FT | $2.05 | $2.00 |
| 807E14410 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, DOT | 4,482 FT | $1.05 | $1.00 |
| 850E10110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1.05 | $1.00 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING Section 6 - TRAFFIC CONTROL - Totals Awd $430,510.25 2 $423,966.50 | — | $1.55 | $1.50 |
| 614E12420 DETOUR SIGNING | 1 LS | $25,500 | $54,500 |
| 614E12460 WORK ZONE MARKING SIGN | 19 EACH | $153 | $120 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $315 | $425 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 31.92 MILE | $510 | $500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 4.7 MILE | $870 | $850 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 1.48 MILE | $15,300 | $15,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 72.25 MILE | $765 | $750 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 9,066 FT | $1.05 | $1.00 |
| 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 7,840 FT | $4.10 | $4.00 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 9,020 FT | $1.05 | $1.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 438 FT | $4.10 | $4.00 |
| 900E00100 RAILROAD FLAGGING SERVICES Section 7 - MAINTENANCE OF TRAFFIC - Totals Awd $557,980.55 2 $519,280.50 | 45,000 EACH | $1.00 | $1.00 |
| 202E98200 REMOVAL MISC.: JOINT SEALER | 88 FT | $6.80 | $6.63 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,065 SY | $9.90 | $9.29 |
| 516E31000 JOINT SEALER | 88 FT | $22.60 | $18.30 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK | 7 SY | $795 | $780 |
| 621E54001 RAISED PAVEMENT MARKER REMOVED, AS PER PLAN Section 8 - STRUCTURE REPAIR (ERI-2-11.71 L) - Totals Awd $18,795.70 2 $17,643.87 | 2 EACH | $50.00 | $49.14 |
| 202E98200 REMOVAL MISC.: JOINT SEALER | 144 FT | $6.80 | $6.63 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,727 SY | $9.90 | $9.29 |
| 516E31000 JOINT SEALER | 144 FT | $22.60 | $18.30 |
| 621E54001 RAISED PAVEMENT MARKER REMOVED, AS PER PLAN Section 9 - STRUCTURE REPAIR (ERI-2-11.93 R) - Totals Awd $21,581.65 2 $19,879.45 | 5 EACH | $50.15 | $49.14 |
| 202E98200 REMOVAL MISC.: JOINT SEALER | 161 FT | $6.80 | $6.63 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,556 SY | $9.90 | $9.29 |
| 516E31000 JOINT SEALER | 161 FT | $22.60 | $18.30 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK | 2 SY | $795 | $780 |
| 621E54001 RAISED PAVEMENT MARKER REMOVED, AS PER PLAN Section 10 - STRUCTURE REPAIR (ERI-2-14.70 L) - Totals Awd $21,877.80 2 $20,175.79 | 3 EACH | $50.00 | $49.14 |
| 202E98200 REMOVAL MISC.: JOINT SEALER | 166 FT | $6.80 | $6.63 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,546 SY | $9.90 | $9.29 |
| 516E31000 JOINT SEALER | 166 FT | $22.60 | $18.30 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK | 5 SY | $795 | $780 |
| 621E54001 RAISED PAVEMENT MARKER REMOVED, AS PER PLAN Section 11 - STRUCTURE REPAIR (ERI-2-14.70 R) - Totals Awd $24,260.80 2 $22,497.50 | 2 EACH | $50.00 | $49.14 |
| 202E98200 REMOVAL MISC.: JOINT SEALER | 126 FT | $6.80 | $6.63 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,031 SY | $9.90 | $9.29 |
| 516E31000 JOINT SEALER Section 12 - STRUCTURE REPAIR (ERI-2-15.11 L) - Totals Awd $13,911.30 2 $12,719.17 | 126 FT | $22.60 | $18.30 |
| 202E98200 REMOVAL MISC.: JOINT SEALER | 96 FT | $6.80 | $6.63 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 797 SY | $9.90 | $9.29 |
| 516E31000 JOINT SEALER | 96 FT | $22.60 | $18.30 |
| 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK Section 13 - STRUCTURE REPAIR (ERI-2-15.11 R) - Totals Awd $11,507.70 2 $10,577.11 | 1 SY | $795 | $780 |
| 900E17000 SPECIAL - RAILROAD COORDINATION Section 14 - ITEMS OF WORK - Totals Awd $2,925.00 2 $7,000.00 | 1 LS | $2,925 | $7,000 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $4,350 | $5,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $46,500 | $65,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $10,710 | $10,000 |
| 619E16020 FIELD OFFICE, TYPE C | 12 MNTH | $2,430 | $3,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $24,000 | $27,420 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $5,300 | $5,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →