TRU-IR 80-11.32 Truck Parking
TRU County · est $6.9M
Bid dateThursday, January 15—
Awarded toSHELLY & SANDS INC$4.72M
TRU County · est $6.9M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 451E14010 9" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 20,353 SY | $103 | $2.10M | 44% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 4,152 CY | $60 | $249k | 5% |
| 624E10000 MOBILIZATION Section 9 - INCIDENTALS - Totals Awd $306,500.00 2 $235,225.00 3 $459,000.00 4 $371,000.00 5 $313,000.00 6 $436,750.00 7 $556,965.43 | 1 LS | $235,000 | $235k | 5% |
| 304E20000 AGGREGATE BASE | 3,644 CY | $62 | $226k | 5% |
| 203E10000 EXCAVATION | 9,328 CY | $18 | $168k | 4% |
| 625E13500 LIGHT TOWER, MISC.: BB45 | 7 EACH | $17,500 | $123k | 3% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT22B40 | 18 EACH | $5,300 | $95k | 2% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 360 CY | $250 | $90k | 2% |
| 442E22300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 360 CY | $202 | $73k | 2% |
| 204E13000 EXCAVATION OF SUBGRADE | 2,815 CY | $25 | $70k | 1% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 119 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Tri-mor CORP | R3Karvo Companies INC | R4Great Lakes Construction CO | R5Marucci & Gaffney Excavating CO | R6Ruhlin Company | R7Rudzik Excavating INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 451E14010 9" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 20,353 SY | $103 | $94.00 | $80.00 | $93.00 | $117 | $108 | $94.63 | 54% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 4,152 CY | $60.00 | $60.00 | $60.00 | $65.00 | $39.47 | $70.00 | $85.00 | 6% |
| 624E10000 MOBILIZATION Section 9 - INCIDENTALS - Totals Awd $306,500.00 2 $235,225.00 3 $459,000.00 4 $371,000.00 5 $313,000.00 6 $436,750.00 7 $556,965.43 | 1 LS | $235,000 | $75,000 | $225,000 | $245,000 | $200,000 | $270,250 | $387,535 | 6% |
| 304E20000 AGGREGATE BASE | 3,644 CY | $62.00 | $60.00 | $75.00 | $60.00 | $72.00 | $80.00 | $100 | 6% |
| 203E10000 EXCAVATION | 9,328 CY | $18.00 | $16.50 | $25.00 | $21.00 | $18.10 | $19.00 | $43.40 | 4% |
| 625E13500 LIGHT TOWER, MISC.: BB45 | 7 EACH | $17,500 | $11,000 | $10,236 | $10,236 | $10,236 | $18,450 | $10,236 | 3% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT22B40 | 18 EACH | $5,300 | $5,500 | $5,042 | $5,042 | $5,042 | $4,540 | $5,042 | 2% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 360 CY | $250 | $325 | $300 | $295 | $250 | $295 | $360 | 2% |
| 442E22300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 360 CY | $202 | $325 | $300 | $295 | $202 | $295 | $350 | 2% |
| 204E13000 EXCAVATION OF SUBGRADE | 2,815 CY | $25.00 | $21.00 | $25.00 | $25.00 | $13.17 | $19.00 | $25.00 | 2% |
| 832E30000 EROSION CONTROL | 60,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 5,472 FT | $10.00 | $14.00 | $12.92 | $12.92 | $12.92 | $15.50 | $12.92 | 1% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 4,754 FT | $10.00 | $10.00 | $20.00 | $17.00 | $11.90 | $15.00 | $45.00 | 1% |
| 204E10000 SUBGRADE COMPACTION | 21,513 SY | $2.00 | $1.50 | $3.00 | $1.00 | $1.12 | $1.60 | $3.00 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE [T = 3"] | 8,279 SY | $5.00 | $5.00 | $1.50 | $4.00 | $5.00 | $4.88 | $1.58 | 1% |
| 204E13000 EXCAVATION OF SUBGRADE [SUBGRADE ROCK CUT] | 1,338 CY | $27.00 | $35.00 | $75.00 | $27.00 | $22.00 | $25.00 | $30.00 | 1% |
| 625E29002 TRENCH, 24" DEEP | 5,152 FT | $7.00 | $9.00 | $8.33 | $8.33 | $8.33 | $8.00 | $8.33 | 1% |
| 809E01900 ITS PULL BOX WITH PAD AND STANDARD LID ASSEMBLY, 3 | 9 EACH | $4,000 | $5,320 | $4,950 | $4,950 | $4,950 | $2,600 | $4,950 | 1% |
| 625E15700 LIGHT TOWER FOUNDATION, MISC.: 36" X 8' DEEP, AS P | 7 EACH | $5,000 | $4,500 | $4,144 | $4,144 | $4,144 | $8,750 | $4,144 | 1% |
| 203E20000 EMBANKMENT | 4,189 CY | $8.00 | $6.00 | $10.00 | $7.00 | $13.53 | $38.00 | $54.05 | 1% |
| Item | Quantity | R1Shelly & Sands INC | R2Tri-mor CORP | R3Karvo Companies INC | R4Great Lakes Construction CO | R5Marucci & Gaffney Excavating CO | R6Ruhlin Company | R7Rudzik Excavating INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $12,800 | $15,000 | $30,000 | $65,000 | $200,000 | $43,000 | $93,040 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $540 | $500 | $1,000 | $300 | $500 | $253 | $2,000 |
| 202E23000 PAVEMENT REMOVED [2" ASPHALT ON 10" REINFORCED CON | 3,153 SY | $10.00 | $18.00 | $15.00 | $12.00 | $9.90 | $11.00 | $30.59 |
| 202E23000 PAVEMENT REMOVED [9.5" ASPHALT ON 10" REINFORCED C | 2,462 SY | $11.00 | $25.00 | $35.00 | $16.00 | $13.90 | $11.00 | $35.46 |
| 202E23000 PAVEMENT REMOVED [9.5" ASPHALT] | 4,556 SY | $2.80 | $10.00 | $5.00 | $8.00 | $3.25 | $5.30 | $12.46 |
| 202E30000 WALK REMOVED | 13,713 SF | $0.50 | $2.00 | $2.00 | $1.15 | $0.70 | $2.80 | $3.00 |
| 202E32000 CURB REMOVED | 1,778 FT | $2.00 | $9.00 | $4.00 | $1.50 | $2.00 | $3.00 | $5.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 584 FT | $31.00 | $16.00 | $45.00 | $17.00 | $19.00 | $15.50 | $15.00 |
| 202E58100 CATCH BASIN REMOVED | 5 EACH | $590 | $425 | $575 | $630 | $200 | $400 | $1,250 |
| 202E75000 FENCE REMOVED | 405 FT | $3.00 | $3.25 | $5.00 | $3.00 | $3.00 | $14.00 | $10.00 |
| 202E75251 GATE REMOVED, AS PER PLAN | 2 EACH | $475 | $510 | $500 | $325 | $475 | $500 | $1,000 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 1 EACH | $500 | $160 | $525 | $315 | $500 | $1,400 | $1,250 |
| 202E98100 REMOVAL MISC.: REST AREA APPURTENANCES | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 202E98200 REMOVAL MISC.: CONDUIT | 50 FT | $5.00 | $13.00 | $10.00 | $12.00 | $10.00 | $12.00 | $10.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 100 CY | $14.00 | $15.50 | $50.00 | $15.00 | $13.53 | $63.00 | $71.35 |
| 204E45000 PROOF ROLLING | 14 HOUR | $670 | $200 | $400 | $385 | $150 | $165 | $250 |
| 204E50000 GEOTEXTILE FABRIC, 712.09, TYPE D | 17,618 SY | $0.90 | $1.35 | $1.00 | $2.00 | $1.50 | $0.50 | $2.25 |
| 209E60200 LINEAR GRADING | 26 STA | $180 | $500 | $325 | $240 | $100 | $57.00 | $800 |
| 607E15100 FENCE, TYPE 47RA | 320 FT | $27.00 | $30.00 | $29.50 | $26.50 | $26.50 | $29.50 | $29.16 |
| 607E98000 FENCE, MISC.: DUMPSTER SCREEN WALL | 40 FT | $285 | $310 | $244 | $285 | $285 | $244 | $285 |
| 608E12000 5" CONCRETE WALK | 516 SF | $12.00 | $11.00 | $15.00 | $15.00 | $15.00 | $12.50 | $18.50 |
| 608E52000 CURB RAMP | 248 SF | $24.00 | $20.00 | $15.00 | $22.00 | $30.00 | $29.00 | $22.75 |
| 690E50600 SPECIAL - BOLLARD | 10 EACH | $795 | $1,650 | $275 | $1,060 | $420 | $800 | $1,065 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $3,000 | $2,500 | $2,500 | $4,000 | $1,000 | $3,000 | $10,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION Section 1 - ROADWAY - Totals Awd $811,603.50 2 $914,558.05 3 $1,105,020.00 4 $957,417.95 5 $877,897.12 6 $1,026,250.00 7 $1,720,268.84 | 1 LS | $3,000 | $3,000 | $3,000 | $10,000 | $1,000 | $7,500 | $10,000 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 14 SY | $150 | $75.00 | $250 | $195 | $225 | $165 | $150 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $25.00 | $200 | $25.00 | $25.00 | $10.00 | $25.00 | $100 |
| 659E00300 TOPSOIL | 1,920 CY | $15.00 | $40.00 | $20.00 | $46.00 | $35.00 | $44.00 | $41.00 |
| 659E10000 SEEDING AND MULCHING | 17,294 SY | $0.70 | $2.00 | $1.50 | $0.67 | $0.75 | $0.67 | $3.50 |
| 659E20000 COMMERCIAL FERTILIZER | 2.33 TON | $250 | $3,500 | $250 | $250 | $400 | $250 | $1,000 |
| 659E31000 LIME | 3.57 ACRE | $25.00 | $250 | $25.00 | $25.00 | $20.00 | $25.00 | $5.00 |
| 659E35000 WATER | 93 MGAL | $0.10 | $400 | $0.10 | $1.00 | $0.01 | $0.10 | $0.01 |
| 670E00500 SLOPE EROSION PROTECTION | 1,472 SY | $1.25 | $2.00 | $1.25 | $1.25 | $4.00 | $1.25 | $6.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,800 | $3,000 | $10,000 | $3,000 | $5,000 | $2,800 | $3,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $8,560 | $9,200 | $15,000 | $10,000 | $9,000 | $12,840 | $6,230 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $11,600 | $12,425 | $25,000 | $15,000 | $12,000 | $11,600 | $10,000 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING Section 2 - EROSION CONTROL - Totals Awd $129,243.35 2 $247,910.50 3 $181,118.55 4 $193,998.23 5 $177,645.83 6 $188,894.53 7 $236,384.78 | 157 SY | $4.50 | $8.00 | $4.50 | $4.50 | $9.00 | $4.50 | $25.00 |
| 602E20000 CONCRETE MASONRY | 0.5 CY | $1,760 | $2,600 | $1,575 | $3,000 | $3,000 | $3,350 | $7,215 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 20 FT | $26.00 | $12.00 | $28.00 | $22.00 | $25.00 | $70.00 | $55.00 |
| 605E13510 6" ROCK CUT UNDERDRAINS WITH GEOTEXTILE FABRIC | 2,311 FT | $13.00 | $15.00 | $20.00 | $17.00 | $16.05 | $15.00 | $50.00 |
| 605E31100 AGGREGATE DRAINS | 50 FT | $8.00 | $18.00 | $25.00 | $14.00 | $10.00 | $21.00 | $33.74 |
| 611E00200 4" CONDUIT, TYPE C | 40 FT | $16.00 | $15.00 | $20.00 | $36.00 | $4.00 | $45.00 | $33.14 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 147 FT | $25.00 | $13.00 | $15.00 | $55.00 | $25.00 | $50.00 | $112 |
| 611E04400 12" CONDUIT, TYPE B | 196 FT | $83.00 | $65.00 | $80.00 | $115 | $70.00 | $95.00 | $198 |
| 611E07400 18" CONDUIT, TYPE B | 50 FT | $113 | $90.00 | $115 | $135 | $75.00 | $140 | $220 |
| 611E10400 24" CONDUIT, TYPE B | 159 FT | $147 | $135 | $80.00 | $175 | $85.00 | $190 | $235 |
| 611E10600 24" CONDUIT, TYPE C | 110 FT | $130 | $130 | $90.00 | $160 | $77.00 | $145 | $205 |
| 611E97400 CONDUIT, MISC.: TYPE C FOR DRAINAGE DISCHARGE CONT | 50 FT | $27.00 | $35.00 | $20.00 | $50.00 | $10.00 | $75.00 | $45.00 |
| 611E97400 CONDUIT, MISC.: TYPE E FOR DRAINAGE DISCHARGE CONT | 50 FT | $27.00 | $35.00 | $20.00 | $45.00 | $10.00 | $75.00 | $45.00 |
| 611E97400 CONDUIT, MISC.: TYPE F FOR DRAINAGE DISCHARGE CONT | 50 FT | $24.00 | $35.00 | $20.00 | $45.00 | $10.00 | $75.00 | $45.00 |
| 611E98150 CATCH BASIN, NO. 3 | 5 EACH | $5,300 | $5,000 | $3,750 | $6,500 | $4,900 | $3,600 | $7,150 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 7 EACH | $266 | $775 | $150 | $400 | $200 | $510 | $600 |
| 611E99720 INSPECTION WELL Section 3 - DRAINAGE - Totals Awd $177,201.00 2 $176,461.00 3 $214,402.50 4 $251,485.00 5 $167,104.15 6 $226,250.00 7 $512,087.10 | 1 EACH | $1,650 | $625 | $650 | $2,200 | $250 | $2,400 | $2,000 |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 73 CY | $325 | $370 | $300 | $340 | $325 | $340 | $450 |
| 407E20000 NON-TRACKING TACK COAT | 1,179 GAL | $3.05 | $4.50 | $2.25 | $4.00 | $3.05 | $4.00 | $2.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 457 GAL | $3.50 | $8.50 | $8.00 | $8.00 | $3.50 | $8.00 | $2.00 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 104 SY | $106 | $94.00 | $100 | $130 | $90.00 | $107 | $92.31 |
| 609E26000 CURB, TYPE 6 | 290 FT | $16.00 | $20.00 | $20.00 | $63.00 | $43.00 | $23.00 | $36.21 |
| 609E28000 CURB, TYPE 7 | 652 FT | $28.00 | $25.00 | $20.00 | $65.00 | $52.00 | $17.00 | $38.96 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 32 CY | $230 | $130 | $125 | $225 | $230 | $225 | $300 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 2,552 FT | $2.60 | $9.00 | $2.45 | $2.45 | $2.70 | $2.58 | $2.70 |
| 690E12060 SPECIAL - PAVEMENT OVERLAY FABRIC COMPOSITE Section 4 - PAVEMENT - Totals Awd $2,608,339.11 2 $2,509,731.00 3 $2,202,759.65 4 $2,483,919.40 5 $2,950,771.20 6 $2,814,247.18 7 $2,663,320.67 | 85 SY | $60.00 | $86.00 | $60.00 | $72.00 | $60.00 | $72.00 | $72.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 50 EACH | $150 | $160 | $149 | $149 | $149 | $180 | $149 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 9 EACH | $150 | $141 | $132 | $132 | $132 | $160 | $132 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 18 EACH | $1,600 | $2,000 | $1,848 | $1,848 | $1,848 | $1,540 | $1,848 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 285 FT | $3.00 | $5.00 | $4.44 | $4.44 | $4.44 | $4.00 | $4.44 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 3,348 FT | $1.50 | $1.00 | $0.92 | $0.92 | $0.92 | $2.00 | $0.92 |
| 625E25500 CONDUIT, 3", 725.04 | 85 FT | $35.00 | $35.00 | $31.81 | $31.81 | $31.81 | $36.00 | $31.81 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 18 EACH | $450 | $510 | $473 | $473 | $473 | $466 | $473 |
| 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL | 14 EACH | $1,500 | $2,000 | $1,827 | $1,827 | $1,827 | $1,450 | $1,827 |
| 625E30706 PULL BOX, 725.08, 24" | 3 EACH | $1,500 | $1,335 | $1,243 | $1,243 | $1,243 | $1,060 | $1,243 |
| 625E32000 GROUND ROD | 25 EACH | $200 | $200 | $165 | $165 | $165 | $245 | $165 |
| 625E34001 POWER SERVICE, AS PER PLAN (LIGHTING AND ITS) | 1 EACH | $10,000 | $13,400 | $12,430 | $12,430 | $12,430 | $8,200 | $12,430 |
| 625E34450 CONTROL CENTER CABINET, COMPLETE | 1 EACH | $6,000 | $6,900 | $6,360 | $6,360 | $6,360 | $5,100 | $6,360 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 4,840 FT | $1.00 | $1.50 | $1.37 | $1.37 | $1.37 | $1.00 | $1.37 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (TRU-80 TRUCK PAR Section 5 - LIGHTING - Totals Awd $450,126.00 2 $459,313.00 3 $423,249.57 4 $423,254.57 5 $423,254.57 6 $504,026.00 7 $423,255.82 | 1 EACH | $500 | $2,075 | $1,920 | $1,920 | $1,920 | $685 | $1,920 |
| 620E00501 DELINEATOR, POST GROUND MOUNTED, AS PER PLAN | 7 EACH | $110 | $120 | $105 | $98.00 | $110 | $105 | $110 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 230 FT | $17.00 | $12.00 | $10.50 | $9.00 | $17.00 | $10.50 | $17.00 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 110 FT | $45.00 | $25.00 | $23.00 | $22.80 | $45.00 | $23.00 | $45.00 |
| 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18 | 46 FT | $65.00 | $55.00 | $46.00 | $45.00 | $65.00 | $46.00 | $65.00 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 43 FT | $57.00 | $45.00 | $36.00 | $34.00 | $57.00 | $36.00 | $57.00 |
| 630E08600 SIGN POST REFLECTOR (RED) | 12 EACH | $45.00 | $30.00 | $21.00 | $20.00 | $45.00 | $21.00 | $45.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 10 EACH | $635 | $550 | $500 | $475 | $635 | $500 | $635 |
| 630E80100 SIGN, FLAT SHEET | 202 SF | $16.00 | $18.00 | $16.50 | $15.50 | $16.00 | $16.50 | $16.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 242 SF | $23.50 | $30.00 | $26.50 | $25.00 | $23.50 | $26.50 | $23.50 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 10 EACH | $845 | $1,400 | $1,250 | $1,100 | $845 | $1,250 | $845 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 26 EACH | $10.00 | $25.00 | $23.00 | $22.00 | $10.00 | $23.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 18 EACH | $20.00 | $30.00 | $26.00 | $25.00 | $20.00 | $26.00 | $20.00 |
| 646E10010 EDGE LINE, 6" | 1.45 MILE | $3,765 | $7,500 | $7,000 | $7,000 | $3,300 | $7,000 | $4,950 |
| 646E10310 CHANNELIZING LINE, 12" | 2,465 FT | $2.00 | $2.00 | $1.50 | $1.50 | $1.35 | $1.50 | $2.75 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 1,364 FT | $4.00 | $7.00 | $6.00 | $6.00 | $13.00 | $6.00 | $11.00 |
| 646E10620 CHEVRON MARKING | 110 FT | $12.50 | $14.00 | $13.00 | $13.00 | $13.00 | $13.00 | $11.00 |
| 646E20200 PARKING LOT STALL MARKING | 3,618 FT | $3.50 | $1.50 | $1.35 | $1.35 | $2.00 | $1.35 | $3.85 |
| 646E20504 DOTTED LINE, 6" Section 6 - TRAFFIC CONTROL - Totals Awd $72,479.25 2 $77,727.00 3 $68,833.65 4 $65,914.65 5 $76,114.50 6 $68,833.65 7 $86,960.15 | 1,323 FT | $2.00 | $2.00 | $1.95 | $1.95 | $1.25 | $1.95 | $2.20 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT40 | 4 EACH | $2,750 | $3,700 | $3,359 | $3,359 | $3,359 | $2,905 | $3,359 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 4 EACH | $1,600 | $2,000 | $1,818 | $1,818 | $1,818 | $1,450 | $1,818 |
| 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE | 3,480 FT | $2.25 | $3.00 | $2.64 | $2.64 | $2.64 | $3.00 | $2.64 |
| 625E25408 CONDUIT, 2", 725.051 | 990 FT | $8.00 | $5.00 | $3.95 | $3.95 | $3.95 | $5.00 | $3.95 |
| 625E25500 CONDUIT, 3", 725.04 | 180 FT | $35.00 | $32.00 | $29.40 | $29.40 | $29.40 | $38.00 | $29.40 |
| 625E29010 TRENCH, 30" DEEP | 185 FT | $15.00 | $18.00 | $16.43 | $16.43 | $16.43 | $9.00 | $16.43 |
| 625E30700 PULL BOX, 725.08, 18" | 5 EACH | $1,200 | $1,175 | $1,091 | $1,091 | $1,091 | $1,211 | $1,091 |
| 625E32000 GROUND ROD | 13 EACH | $200 | $170 | $157 | $157 | $157 | $245 | $157 |
| 625E36010 UNDERGROUND WARNING MARKING TAPE | 1,550 FT | $2.50 | $2.00 | $1.45 | $1.45 | $1.45 | $1.00 | $1.45 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (TRU-80 TRUCK PAR | 2 EACH | $500 | $2,100 | $1,920 | $1,920 | $1,920 | $685 | $1,920 |
| 809E23900 CONDUIT, 2" DIAMETER, HDPE | 1,325 FT | $6.00 | $5.00 | $4.36 | $4.36 | $4.36 | $4.50 | $4.36 |
| 809E60060 CCTV IP-CAMERA SYSTEM, FIXED-VIEW | 4 EACH | $3,500 | $4,000 | $3,613 | $3,613 | $3,613 | $3,300 | $3,613 |
| 809E64550 ETHERNET CABLE, OUTDOOR-RATED | 670 FT | $3.00 | $2.00 | $1.77 | $1.77 | $1.77 | $3.00 | $1.77 |
| 809E65000 ITS CABINET - GROUND MOUNTED | 2 EACH | $14,000 | $12,100 | $11,240 | $11,240 | $11,240 | $10,240 | $11,240 |
| 809E65100 STEP-DOWN TRANSFORMER, 3KVA | 2 EACH | $1,000 | $945 | $880 | $880 | $880 | $3,500 | $880 |
| 809E70050 AS-BUILT CONSTRUCTION PLANS Section 7 - TRAFFIC SURVEILLANCE - Totals Awd $146,660.00 2 $160,860.00 3 $150,916.21 4 $146,166.21 5 $146,157.21 6 $128,527.50 7 $146,157.21 | 1 LS | $1,000 | $260 | $5,000 | $250 | $241 | $3,000 | $241 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $95.00 | $93.00 | $125 | $100 | $90.00 | $100 | $90.00 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 4 EACH | $320 | $500 | $235 | $215 | $200 | $235 | $750 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 3 SNMT | $900 | $1,000 | $785 | $735 | $1,100 | $785 | $1,900 |
| 616E10000 WATER | 30 MGAL | $111 | $85.00 | $1.00 | $60.00 | $1.00 | $37.54 | $50.00 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY Section 8 - MAINTENANCE OF TRAFFIC - Totals Awd $15,010.00 2 $15,470.00 3 $12,015.00 4 $12,375.00 5 $11,930.00 6 $12,111.20 7 $24,600.00 | 6 SNMT | $650 | $700 | $615 | $585 | $700 | $615 | $1,800 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,500 | $55,000 | $25,000 | $35,000 | $30,000 | $27,500 | $54,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $17,000 | $50,000 | $50,000 | $16,600 | $43,000 | $24,000 | $51,030 |
| 619E16020 FIELD OFFICE, TYPE C | 8 MNTH | $3,750 | $3,300 | $3,000 | $4,300 | $1,500 | $7,000 | $1,800 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $16,000 | $28,825 | $135,000 | $40,000 | $28,000 | $59,000 | $50,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →