BID #264010 · ODOTRESULT · awarded Apr 23

JEF-Wintersville Sidewalk Improv

JEF County · est $0.3M

Bid dateThursday, April 23
Awarded toBOG CONSTRUCTION INC$291,807.5
read → connected → answeredcassandri

Project scope

Bid form · ODOT

49ITEMS
  • Earthwork16%
  • Maintaining Traffic16%
  • Signs14%
  • Curb, Walk & Ramp12%
  • Pavement Marking12%
  • Erosion & Landscaping10%
  • Other18%

Top items by winning bid

ItemQtyUnit priceExtended%
614E11000 MAINTAINING TRAFFIC1 LS$45,000$45k15%
608E10001 4" CONCRETE WALK, AS PER PLAN4,829 SF$8$39k13%
202E30001 WALK REMOVED, AS PER PLAN5,219 SF$4$21k7%
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$20,000$20k7%
624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $101,500.00 2 $106,045.11 3 $81,500.001 LS$20,000$20k7%
202E23000 PAVEMENT REMOVED528 SY$35$18k6%
609E24510 CURB, TYPE 4-C Section 4 - PAVEMENT - Totals Awd $44,898.00 2 $77,929.92 3 $89,464.00464 FT$37$17k6%
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$15,000$15k5%
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)15 CY$860$13k4%
608E52001 CURB RAMP, AS PER PLAN Section 1 - ROADWAY - Totals Awd $107,162.00 2 $171,512.52 3 $257,283.001,142 SF$11$13k4%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 29 more items below.

Rank 1Bog Construction INC$292kRank 2Madex Construction CO$400kRank 3Craig Edward Susany INC$488k
ItemQuantityR1Bog Construction INCR2Madex Construction COR3Craig Edward Susany INC
614E11000 MAINTAINING TRAFFIC1 LS$45,000$34,837$36,000
608E10001 4" CONCRETE WALK, AS PER PLAN4,829 SF$8.00$18.53$21.00
202E30001 WALK REMOVED, AS PER PLAN5,219 SF$4.00$2.14$10.00
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$20,000$18,937$16,500
624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $101,500.00 2 $106,045.11 3 $81,500.001 LS$20,000$34,992$10,000
202E23000 PAVEMENT REMOVED528 SY$35.00$32.94$45.00
609E24510 CURB, TYPE 4-C Section 4 - PAVEMENT - Totals Awd $44,898.00 2 $77,929.92 3 $89,464.00464 FT$37.00$78.74$76.00
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$15,000$14,595$10,000
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)15 CY$860$1,158$2,000
608E52001 CURB RAMP, AS PER PLAN Section 1 - ROADWAY - Totals Awd $107,162.00 2 $171,512.52 3 $257,283.001,142 SF$11.00$28.95$36.00
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $16,090.00 2 $14,605.59 3 $18,880.0010,000 EACH$1.00$1.00$1.00
441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG5 CY$2,000$3,474$3,000
608E15001 8" CONCRETE WALK, AS PER PLAN339 SF$16.00$23.16$46.00
304E20000 AGGREGATE BASE23 CY$210$289$400
659E00500 SEEDING AND MULCHING, CLASS 1179 SY$25.00$1.58$20.00
204E10000 SUBGRADE COMPACTION852 SY$4.00$5.79$9.00
646E20300 LANE ARROW Section 5 - TRAFFIC CONTROL - Totals Awd $14,872.50 2 $16,033.21 3 $21,974.009 EACH$350$405$200
614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I0.3 MILE$9,000$18,526$17,000
201E11000 CLEARING AND GRUBBING1 LS$2,500$2,219$100
202E32000 CURB REMOVED285 FT$8.00$17.37$50.00
Show all 49 line items
ItemQuantityR1Bog Construction INCR2Madex Construction COR3Craig Edward Susany INC
203E10000 EXCAVATION4 CY$500$70.53$50.00
203E20000 EMBANKMENT2 CY$500$86.84$500
601E28101 DUMPED ROCK FILL, AS PER PLAN4 CY$150$579$190
659E00100 SOIL ANALYSIS TEST2 EACH$50.00$89.47$150
659E00300 TOPSOIL20 CY$40.00$86.84$200
659E14000 REPAIR SEEDING AND MULCHING9 SY$10.00$1.58$19.00
659E20000 COMMERCIAL FERTILIZER0.02 TON$1,000$2,316$2,000
659E31000 LIME0.04 ACRE$100$579$700
659E35000 WATER1 MGAL$1.00$7.53$1.00
611E99654 MANHOLE ADJUSTED TO GRADE Section 3 - DRAINAGE - Totals Awd $750.00 2 $2,894.74 3 $1,000.001 EACH$750$2,895$1,000
630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST36 FT$25.00$28.95$13.00
630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST13 FT$27.00$31.26$14.00
630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST20 FT$40.00$46.32$17.00
630E08510 STREET NAME SIGN SUPPORT, NO. 2 POST11 FT$35.00$40.53$14.00
630E80100 SIGN, FLAT SHEET37.5 SF$35.00$37.05$20.00
630E80500 SIGN, DOUBLE FACED, STREET NAME2 EACH$475$579$125
630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL6 EACH$100$70.53$30.00
646E10010 EDGE LINE, 6"0.08 MILE$11,000$11,579$15,000
646E10110 LANE LINE, 6"0.15 MILE$5,500$5,789$75,000
646E10200 CENTER LINE0.03 MILE$12,000$13,895$20,000
646E10300 CHANNELIZING LINE, 8"241 FT$4.00$3.47$5.00
646E10400 STOP LINE23 FT$25.00$18.53$20.00
646E10510 CROSSWALK LINE, 12"125 FT$15.00$16.21$15.00
646E10600 TRANSVERSE/DIAGONAL LINE63 FT$15.00$17.37$20.00
614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC10 CY$200$279$1,000
614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I310 FT$3.00$2.32$6.00
614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I3 EACH$300$579$300
616E10000 WATER Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $6,535.00 2 $10,841.10 3 $17,865.005 MGAL$1.00$7.53$1.00
619E16000 FIELD OFFICE, TYPE A3 MNTH$500$895$3,000

Project details

Description
JEF-Wintersville Sidewalk Improv
Type of work
Safety

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →