Skip to content
Figure 0.1 · BRIEFING
BID #260225 · ODOTRESULT · awarded Apr 23

WAR-Central Greenway SUP Seg D

WAR County · est $0.7M

Bid dateThursday, April 23
Awarded toFILLMORE CONSTRUCTION$697,461.52
read → connected → answeredcassandri

Project scope

Bid form · ODOT

52ITEMS
  • Earthwork21%
  • Erosion & Landscaping13%
  • Drainage10%
  • Signs10%
  • Curb, Walk & Ramp8%
  • Maintaining Traffic6%
  • Other33%

Top items by winning bid

ItemQtyUnit priceExtended%
203E10000 EXCAVATION4,124 CY$30$124k18%
204E30010 GRANULAR MATERIAL, TYPE B1,200 CY$60$72k10%
201E11000 CLEARING AND GRUBBING1 LS$50,000$50k7%
304E20000 AGGREGATE BASE575 CY$80$46k7%
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $104,217.00 2 $119,291.00 3 $105,244.50 4 $105,263.70 5 $117,219.2540,000 EACH$1$40k6%
204E13000 EXCAVATION OF SUBGRADE1,200 CY$30$36k5%
659E00300 TOPSOIL515 CY$60$31k4%
441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG119 CY$246$29k4%
203E20000 EMBANKMENT458 CY$50$23k3%
441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2448 (94 CY$242$23k3%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 32 more items below.

Rank 1Fillmore Construction$697kRank 2Brumbaugh Construction INC$708kRank 3Kt Holden Construction LLC$788kRank 4Sunesis Construction CO$815kRank 5Barrett Paving Materials INC$869k
ItemQuantityR1Fillmore ConstructionR2Brumbaugh Construction INCR3Kt Holden Construction LLCR4Sunesis Construction COR5Barrett Paving Materials INC
203E10000 EXCAVATION4,124 CY$30.00$24.00$33.00$39.45$40.00
204E30010 GRANULAR MATERIAL, TYPE B1,200 CY$60.00$55.00$56.50$83.54$80.00
201E11000 CLEARING AND GRUBBING1 LS$50,000$55,862$40,160$50,000$40,000
304E20000 AGGREGATE BASE575 CY$80.00$75.00$100$94.62$115
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $104,217.00 2 $119,291.00 3 $105,244.50 4 $105,263.70 5 $117,219.2540,000 EACH$1.00$1.00$1.00$1.00$1.00
204E13000 EXCAVATION OF SUBGRADE1,200 CY$30.00$24.00$38.50$48.10$40.00
659E00300 TOPSOIL515 CY$60.00$69.00$62.00$33.75$65.00
441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG119 CY$246$325$334$350$400
203E20000 EMBANKMENT458 CY$50.00$20.00$23.00$9.52$30.00
441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2448 (94 CY$242$305$315$379$375
624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $50,500.00 2 $86,750.00 3 $112,740.00 4 $73,379.54 5 $93,905.231 LS$18,000$55,000$39,400$46,140$30,000
614E11000 MAINTAINING TRAFFIC1 LS$17,500$2,000$33,700$5,974$25,000
611E04600 12" CONDUIT, TYPE C162 FT$100$80.00$130$83.92$110
630E97700 SIGNING, MISC.:SOLAR POWERED RECTANGULAR RAPID FLA2 EACH$7,495$9,250$8,600$10,340$7,500
611E98504 CATCH BASIN, NO. 2-2C2 EACH$6,500$2,900$3,000$3,489$5,250
607E98000 FENCE, MISC.:WOOD FENCE150 FT$80.00$70.00$65.00$70.00$50.00
204E10000 SUBGRADE COMPACTION3,440 SY$3.00$1.25$5.50$2.50$2.50
832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA1 LS$10,000$16,500$13,000$15,000$15,000
611E99574 MANHOLE, NO. 3 Section 3 - DRAINAGE - Totals Awd $51,990.00 2 $37,495.50 3 $45,245.50 4 $34,641.17 5 $55,025.001 EACH$10,000$3,200$3,000$4,518$6,100
832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS1 LS$7,500$8,500$4,000$0.48$10,000
Show all 52 line items
ItemQuantityR1Fillmore ConstructionR2Brumbaugh Construction INCR3Kt Holden Construction LLCR4Sunesis Construction COR5Barrett Paving Materials INC
202E23000 PAVEMENT REMOVED270 SY$10.00$13.00$12.00$14.84$20.00
202E30000 WALK REMOVED115 SF$10.00$4.00$5.00$5.81$15.00
202E32000 CURB REMOVED234 FT$10.00$12.00$9.00$14.90$11.00
204E50000 GEOTEXTILE FABRIC3,600 SY$2.00$2.00$3.60$1.59$2.50
608E52000 CURB RAMP66 SF$50.00$250$35.00$104$100
690E50600 SPECIAL - BOLLARD Section 1 - ROADWAY - Totals Awd $340,310.00 2 $301,375.50 3 $333,227.00 4 $411,257.31 5 $398,099.002 EACH$3,500$800$750$2,502$1,300
601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER3 CY$180$380$400$567$1,000
659E00500 SEEDING AND MULCHING, CLASS 14,624 SY$1.45$1.50$1.45$2.55$1.25
659E14000 REPAIR SEEDING AND MULCHING231 SY$2.20$1.50$2.20$2.20$1.25
659E20000 COMMERCIAL FERTILIZER0.62 TON$1,400$1,075$1,400$1,400$1,000
659E35000 WATER25 MGAL$10.00$1.00$3.50$0.01$1.00
670E00500 SLOPE EROSION PROTECTION1,723 SY$2.00$4.00$2.00$3.10$3.50
832E15000 STORM WATER POLLUTION PREVENTION PLAN1 LS$3,500$2,750$3,500$12,673$3,000
602E20000 CONCRETE MASONRY1.47 CY$3,000$5,650$4,150$1,074$6,000
611E04900 12" CONDUIT, TYPE D86 FT$80.00$80.00$95.00$80.53$110
611E98630 CATCH BASIN ADJUSTED TO GRADE1 EACH$1,500$350$915$1,047$2,325
204E45000 PROOF ROLLING4 HOUR$150$300$390$257$250
407E20000 NON-TRACKING TACK COAT344 GAL$3.50$5.00$5.00$4.50$5.00
609E26000 CURB, TYPE 6 Section 4 - PAVEMENT - Totals Awd $117,396.00 2 $132,190.00 3 $160,366.00 4 $155,153.81 5 $172,185.00145 FT$50.00$100$78.00$84.67$82.00
630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST144 FT$15.00$17.00$16.00$20.00$15.00
630E80100 SIGN, FLAT SHEET52.5 SF$16.00$26.00$25.00$30.00$16.00
630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL1 EACH$20.00$16.00$15.00$25.00$20.00
630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION1 EACH$45.00$75.00$70.00$250$45.00
630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA2 EACH$65.00$50.00$50.00$25.00$65.00
632E64020 PEDESTAL FOUNDATION2 EACH$2,500$1,300$1,250$2,500$3,000
642E00500 STOP LINE, TYPE 112 FT$12.31$13.00$12.35$12.31$12.31
642E00630 CROSSWALK LINE, 24", TYPE 1 Section 5 - TRAFFIC CONTROL - Totals Awd $25,548.52 2 $27,600.00 3 $25,872.70 4 $32,823.52 5 $26,558.52180 FT$12.31$13.00$12.35$12.31$12.31
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$4,500$6,500$13,790$5,211$5,000
619E16010 FIELD OFFICE, TYPE B3 MNTH$1,000$2,750$1,600$1,552$3,000
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$7,500$15,000$21,050$11,400$24,905
AA2 690E98000 SPECIAL - TRASH RECEPTACLE, ALTERNATE 21 EACH$2,500$750$460$1,100$900
AA2 690E98000 SPECIAL - BENCH, ALTERNATE 2 Section 7 - ROADWAY ALTERNATES - Totals Awd $7,500.00 2 $3,250.00 3 $5,280.00 4 $2,200.00 5 $5,900.001 EACH$5,000$2,500$4,820$1,100$5,000

Project details

Description
WAR-Central Greenway SUP Seg D
Type of work
Safety

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →