Figure 0.1 · BRIEFING
BID #260210 · ODOTRESULT · awarded Apr 23

MOT-Old N. Dayton Trail, Seg 2

MOT County · est $1.0M

Bid dateThursday, April 23
Awarded toBRUMBAUGH CONSTRUCTION INC$1.08M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

36ITEMS
  • Earthwork25%
  • Drainage11%
  • Erosion & Landscaping11%
  • Guardrail & Barrier8%
  • Maintaining Traffic8%
  • Mobilization & General8%
  • Other28%

Top items by winning bid

ItemQtyUnit priceExtended%
304E20000 AGGREGATE BASE2,546 CY$73$186k17%
607E98200 FENCE, MISC.: OVERHEAD PROTECTIVE FENCING1 LS$160,000$160k15%
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)587 CY$255$150k14%
203E10000 EXCAVATION5,491 CY$23$126k12%
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG Section 4 - PAVEMENT - Totals Awd $420,698.00 2 $395,665.00 3 $463,212.27 4 $484,145.68 5 $496,968.50274 CY$300$82k8%
624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $105,320.00 2 $38,000.00 3 $109,065.00 4 $67,237.22 5 $132,000.001 LS$68,320$68k6%
204E30010 GRANULAR MATERIAL, TYPE B940 CY$66$62k6%
203E20000 EMBANKMENT1,534 CY$24$37k3%
659E00511 SEEDING AND MULCHING, CLASS 2, AS PER PLAN10,005 SY$3$30k3%
204E13000 EXCAVATION OF SUBGRADE940 CY$23$22k2%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.

Rank 1Brumbaugh Construction INC$1.08MRank 2Fillmore Construction$1.10MRank 3Performance Site Development$1.21MRank 4Sunesis Construction CO$1.29MRank 5Barrett Paving Materials INC$1.43M
ItemQuantityR1Brumbaugh Construction INCR2Fillmore ConstructionR3Performance Site DevelopmentR4Sunesis Construction COR5Barrett Paving Materials INC
304E20000 AGGREGATE BASE2,546 CY$73.00$80.00$72.00$85.68$100
607E98200 FENCE, MISC.: OVERHEAD PROTECTIVE FENCING1 LS$160,000$148,000$183,015$148,000$148,000
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)587 CY$255$210$316$300$260
203E10000 EXCAVATION5,491 CY$23.00$30.00$25.25$34.03$45.00
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG Section 4 - PAVEMENT - Totals Awd $420,698.00 2 $395,665.00 3 $463,212.27 4 $484,145.68 5 $496,968.50274 CY$300$240$326$310$320
624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $105,320.00 2 $38,000.00 3 $109,065.00 4 $67,237.22 5 $132,000.001 LS$68,320$17,000$29,995$31,886$40,000
204E30010 GRANULAR MATERIAL, TYPE B940 CY$66.00$72.00$70.00$93.95$100
203E20000 EMBANKMENT1,534 CY$24.00$35.00$21.00$13.76$45.00
659E00511 SEEDING AND MULCHING, CLASS 2, AS PER PLAN10,005 SY$3.00$2.00$1.50$15.12$1.50
204E13000 EXCAVATION OF SUBGRADE940 CY$23.00$30.00$26.25$37.24$55.00
832E30000 EROSION CONTROL20,000 EACH$1.00$1.00$1.00$1.00$1.00
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$18,500$7,500$24,750$19,600$36,000
670E00500 SLOPE EROSION PROTECTION3,556 SY$3.50$2.25$4.21$2.25$3.50
204E10000 SUBGRADE COMPACTION11,366 SY$1.00$3.00$1.00$1.56$2.50
832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA Section 2 - EROSION CONTROL - Totals Awd $82,461.00 2 $70,211.00 3 $78,278.26 4 $195,162.61 5 $74,353.501 LS$11,000$10,000$14,150$8,835$10,000
611E07400 18" CONDUIT, TYPE B, 706.0237 FT$250$180$177$252$155
608E13020 7" CONCRETE WALK922 SF$10.00$50.00$13.95$11.54$12.00
611E99660 MANHOLE RECONSTRUCTED TO GRADE Section 3 - DRAINAGE - Totals Awd $18,580.00 2 $19,660.00 3 $22,139.00 4 $11,427.21 5 $18,735.004 EACH$2,200$2,500$2,950$320$2,500
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$7,500$7,500$19,995$7,565$22,000
204E50000 GEOTEXTILE FABRIC2,820 SY$2.50$2.00$5.00$1.11$3.50
Show all 36 line items
ItemQuantityR1Brumbaugh Construction INCR2Fillmore ConstructionR3Performance Site DevelopmentR4Sunesis Construction COR5Barrett Paving Materials INC
201E11000 CLEARING AND GRUBBING1 LS$3,000$7,500$33,955$2,691$28,000
202E23000 PAVEMENT REMOVED13 SY$40.00$50.00$125$51.30$65.00
204E45001 PROOF ROLLING, AS PER PLAN5 HOUR$325$150$195$227$275
607E23000 FENCE, TYPE CLT61 FT$70.00$65.00$47.25$65.00$65.00
607E98100 FENCE, MISC.: TUBULAR BARRIER SWING GATE2 EACH$3,500$3,250$4,675$3,250$3,250
608E53020 DETECTABLE WARNING Section 1 - ROADWAY - Totals Awd $451,940.00 2 $570,303.00 3 $532,531.16 4 $527,145.28 5 $702,659.0028 SF$40.00$100$38.00$50.00$100
601E10000 RIPRAP10 SY$50.00$120$245$185$390
832E15000 STORM WATER POLLUTION PREVENTION PLAN1 LS$2,500$3,500$3,950$2,500$5,000
832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS1 LS$6,000$7,500$7,750$2,700$8,000
611E99654 MANHOLE ADJUSTED TO GRADE2 EACH$265$1,500$1,895$420$1,500
407E20000 NON-TRACKING TACK COAT591 GAL$5.00$5.00$8.83$8.40$3.50
620E60000 DELINEATOR, POST SURFACE MOUNTED1 EACH$215$200$446$16.00$300
630E97700 SIGNING, MISC.: CSXT NO TRESPASSING SIGN4 EACH$550$500$704$16.00$500
644E00300 CENTER LINE Section 5 - TRAFFIC CONTROL - Totals Awd $4,095.00 2 $3,745.00 3 $4,882.51 4 $1,625.00 5 $3,900.000.02 MILE$84,000$77,250$81,113$77,250$80,000
100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY1 LS$6,000$2,500$6,550$4,000$20,000
614E11000 MAINTAINING TRAFFIC1 LS$5,000$3,500$27,775$4,186$14,000

Project details

Description
MOT-Old N. Dayton Trail, Seg 2
Type of work
Safety

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →