FRA-IR 71-17.22 Ramp
FRA County · est $4.3M
Bid dateThursday, April 23—
Awarded toCOMPLETE GENERAL CONSTRUCTION COMPANY$5.25M
FRA County · est $4.3M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 3,043 CY | $184 | $560k | 11% |
| 203E10000 EXCAVATION | 14,574 CY | $32 | $466k | 9% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,027 CY | $330 | $339k | 6% |
| 624E10000 MOBILIZATION Section 12 - INCIDENTALS - Totals Awd $536,050.00 2 $681,268.21 | 1 LS | $260,000 | $260k | 5% |
| 202E23000 PAVEMENT REMOVED | 7,338 SY | $28 | $205k | 4% |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 1,476 FT | $128 | $189k | 4% |
| 304E20000 AGGREGATE BASE | 1,641 CY | $92 | $151k | 3% |
| 442E10080 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 512 CY | $265 | $136k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $130,000 | $130k | 2% |
| 530E51010 SPECIAL - RETAINING WALL, PRECAST CONCRETE LAGGING Section 11 - RETAINING WALLS - Totals Awd $461,442.00 2 $510,622.00 | 2,695 SF | $45 | $121k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 208 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | % of bid |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 3,043 CY | $184 | $205 | 16% |
| 203E10000 EXCAVATION | 14,574 CY | $32.00 | $40.00 | 14% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,027 CY | $330 | $355 | 10% |
| 624E10000 MOBILIZATION Section 12 - INCIDENTALS - Totals Awd $536,050.00 2 $681,268.21 | 1 LS | $260,000 | $290,800 | 8% |
| 202E23000 PAVEMENT REMOVED | 7,338 SY | $28.00 | $25.00 | 6% |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 1,476 FT | $128 | $125 | 6% |
| 304E20000 AGGREGATE BASE | 1,641 CY | $92.00 | $95.00 | 4% |
| 442E10080 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 512 CY | $265 | $305 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $130,000 | $225,000 | 4% |
| 530E51010 SPECIAL - RETAINING WALL, PRECAST CONCRETE LAGGING Section 11 - RETAINING WALLS - Totals Awd $461,442.00 2 $510,622.00 | 2,695 SF | $45.00 | $57.00 | 4% |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 21 EACH | $5,750 | $7,000 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.50" | 14,505 SY | $7.30 | $9.00 | 3% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,770 FT | $51.50 | $67.00 | 3% |
| 611E05900 15" CONDUIT, TYPE B | 374 FT | $240 | $175 | 3% |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 1,136 FT | $77.50 | $62.00 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $82,000 | $77,500 | 2% |
| 611E98820 INLET, NO. 3D | 6 EACH | $13,100 | $15,000 | 2% |
| 632E64000 STRAIN POLE FOUNDATION, 20' DEEP, AS PER PLAN | 4 EACH | $18,250 | $18,250 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,600 FT | $26.00 | $30.00 | 2% |
| 507E92200 PREBORED HOLES | 175 FT | $370 | $325 | 2% |
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $42,000 |
| 202E30700 CONCRETE BARRIER REMOVED | 1,398 FT | $36.00 | $65.00 |
| 202E32000 CURB REMOVED | 3,419 FT | $8.00 | $7.00 |
| 202E32800 CONCRETE SLOPE PROTECTION REMOVED | 671 SY | $30.00 | $30.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 972 FT | $30.00 | $42.00 |
| 202E38000 GUARDRAIL REMOVED | 1,183 FT | $2.80 | $2.50 |
| 202E47800 IMPACT ATTENUATOR REMOVED | 2 EACH | $285 | $50.00 |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $640 | $750 |
| 202E58200 INLET REMOVED | 15 EACH | $940 | $850 |
| 202E58400 INLET ABANDONED | 1 EACH | $1,100 | $1,900 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 300 FT | $40.00 | $17.00 |
| 202E75000 FENCE REMOVED | 110 FT | $6.50 | $5.00 |
| 203E20000 EMBANKMENT | 770 CY | $9.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 9,844 SY | $3.20 | $8.00 |
| 204E45000 PROOF ROLLING | 5 HOUR | $360 | $300 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 138 FT | $32.40 | $28.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,940 | $1,350 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $925 | $550 |
| 606E60022 IMPACT ATTENUATOR, TYPE 2 (UNIDIRECTIONAL) 62 mph, | 1 EACH | $46,375 | $48,000 |
| 607E23000 FENCE, TYPE CLT | 50 FT | $83.50 | $54.60 |
| 608E10000 4" CONCRETE WALK | 9 SF | $67.00 | $65.00 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 3 EACH | $5,450 | $8,000 |
| 622E25051 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 2 EACH | $6,100 | $9,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION | 1 LS | $3,500 | $7,500 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER Section 1 - ROADWAY - Totals Awd $1,319,967.40 2 $1,591,855.50 | 1 LS | $27,000 | $44,500 |
| 601E21000 CONCRETE SLOPE PROTECTION | 368 SY | $165 | $195 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $150 | $135 |
| 659E00300 TOPSOIL | 830 CY | $32.00 | $34.00 |
| 659E00520 SEEDING AND MULCHING, CLASS 3A | 7,481 SY | $1.00 | $0.75 |
| 659E14000 REPAIR SEEDING AND MULCHING | 374 SY | $1.00 | $0.80 |
| 659E15000 INTER-SEEDING | 374 SY | $1.00 | $0.80 |
| 659E20000 COMMERCIAL FERTILIZER | 3 TON | $1,250 | $940 |
| 659E31000 LIME | 2 ACRE | $150 | $161 |
| 659E35000 WATER | 46 MGAL | $1.00 | $1.00 |
| 659E40000 MOWING | 0.02 MSF | $25,000 | $100 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 783 SY | $2.50 | $1.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $3,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $12,500 | $14,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $13,000 | $12,900 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $180,212.50 2 $191,088.65 | 50,000 EACH | $1.00 | $1.00 |
| 605E05110 4" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 569 FT | $20.00 | $22.00 |
| 605E05110 4" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 1,905 FT | $21.00 | $23.00 |
| 605E05110 4" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 846 FT | $26.00 | $25.00 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 100 FT | $28.50 | $18.00 |
| 605E06020 4" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC (1 | 2,383 FT | $21.00 | $21.00 |
| 605E06020 4" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC (6 | 320 FT | $16.00 | $20.00 |
| 611E00406 4" CONDUIT, TYPE F | 100 FT | $15.00 | $25.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 331 FT | $15.00 | $50.00 |
| 611E04400 12" CONDUIT, TYPE B | 141 FT | $240 | $170 |
| 611E04600 12" CONDUIT, TYPE C | 9 FT | $190 | $285 |
| 611E06100 15" CONDUIT, TYPE C | 251 FT | $160 | $180 |
| 611E07400 18" CONDUIT, TYPE B | 73 FT | $290 | $205 |
| 611E07600 18" CONDUIT, TYPE C | 22 FT | $270 | $225 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $5,000 | $6,000 |
| 611E98180 CATCH BASIN, NO. 3A | 5 EACH | $4,250 | $6,200 |
| 611E98410 CATCH BASIN, NO. 8 | 3 EACH | $5,300 | $7,500 |
| 611E98430 CATCH BASIN, NO. 8 WITHOUT APRON | 2 EACH | $4,500 | $5,500 |
| 611E98800 INLET, NO. 3B | 1 EACH | $13,500 | $17,000 |
| 611E98821 INLET, NO. 3D, AS PER PLAN | 1 EACH | $12,500 | $16,000 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $2,700 | $5,500 |
| 690E98000 SPECIAL - 12" CONDUIT, TYPE 1 | 6 EACH | $260 | $400 |
| 690E98100 SPECIAL - 60" CURB INLET Section 3 - DRAINAGE - Totals Awd $496,249.00 2 $519,256.00 | 1 FT | $5,800 | $6,000 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 1,260 FT | $5.00 | $5.50 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.25" | 461 SY | $14.25 | $22.50 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE DEPTH | 649 SY | $11.50 | $22.50 |
| 407E20000 NON-TRACKING TACK COAT | 3,158 GAL | $4.25 | $4.00 |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 1,085 CY | $12.50 | $15.00 |
| 609E24510 CURB, TYPE 4-C | 1,374 FT | $28.00 | $35.00 |
| 609E26000 CURB, TYPE 6 | 376 FT | $43.00 | $70.00 |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) Section 4 - PAVEMENT - Totals Awd $1,433,803.25 2 $1,575,522.00 | 3,100 FT | $13.06 | $3.00 |
| 638E11602 SPECIAL - 6" WATER MAIN DIP AND FITTINGS (COL 801) | 27 FT | $500 | $300 |
| 638E11604 SPECIAL - 8" WATER MAIN DIP AND FITTINGS (COL 801) | 5 FT | $300 | $1,300 |
| 638E20500 SPECIAL - VALVE BOX ADJUSTED TO GRADE (COL 807) | 3 EACH | $200 | $800 |
| 638E20536 SPECIAL - 6" GATE VALVE (COL 802) | 2 EACH | $1,800 | $1,800 |
| 638E20750 SPECIAL - 6" FIRE HYDRANT (COL 809) | 1 EACH | $5,500 | $6,000 |
| 638E20758 SPECIAL - FIRE HYDRANT ABANDONED (COL 809) Section 5 - WATER WORK - Totals Awd $25,550.00 2 $34,100.00 | 1 EACH | $850 | $7,500 |
| 625E00450 CONNECTION, FUSED PULL APART | 8 EACH | $150 | $150 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 8 EACH | $145 | $145 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 10 EACH | $130 | $130 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT15B40 | 6 EACH | $4,025 | $4,025 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 6 EACH | $2,800 | $2,800 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 402 FT | $3.50 | $3.50 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,006 FT | $3.00 | $3.00 |
| 625E24100 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 2400 VOLT CAB | 648 FT | $15.00 | $15.00 |
| 625E25500 CONDUIT, 3", 725.04 | 181 FT | $41.00 | $41.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 6 EACH | $525 | $525 |
| 625E29002 TRENCH, 24" DEEP | 765 FT | $9.00 | $9.00 |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $1,450 | $1,450 |
| 625E31510 PULL BOX REMOVED | 2 EACH | $250 | $250 |
| 625E32000 GROUND ROD | 6 EACH | $350 | $350 |
| 625E36010 UNDERGROUND WARNING MARKING TAPE | 765 FT | $1.00 | $1.00 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $28,000 | $23,000 |
| 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT | 1 EACH | $3,900 | $3,900 |
| 625E75400 LIGHT POLE REMOVED | 8 EACH | $350 | $350 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 8 EACH | $350 | $350 |
| 625E75506 LUMINAIRE REMOVED | 8 EACH | $60.00 | $60.00 |
| 625E75800 DISCONNECT CIRCUIT | 4 EACH | $400 | $400 |
| 625E98000 LIGHTING, MISC.: 13" X 24" PULL BOX (MIS-54) | 2 EACH | $1,100 | $1,100 |
| 625E98000 LIGHTING, MISC.: ALUMINUM, 12' BRACKET, T-BASE, 30 | 1 EACH | $3,500 | $3,500 |
| 625E98000 LIGHTING, MISC.: ALUMINUM, 8' BRACKET, T-BASE, 30' | 1 EACH | $3,375 | $3,375 |
| 625E98000 LIGHTING, MISC.: FOUNDATION REMOVAL (MIS-900) | 3 EACH | $350 | $350 |
| 625E98000 LIGHTING, MISC.: LUMINAIRE, LED, COBRA HEAD (MIS-8 | 2 EACH | $625 | $625 |
| 625E98000 LIGHTING, MISC.: MIS-201 STREET LIGHT FOUNDATION, | 2 EACH | $2,100 | $2,100 |
| 625E98000 LIGHTING, MISC.: POLE TO BE WIRED, 2-WIRE | — | $700 | $700 |
| 625E98100 LIGHTING, MISC.: 2" CONDUIT, CONCRETE ENCASED (MIS | 384 FT | $36.00 | $36.00 |
| 625E98100 LIGHTING, MISC.: MIS-702 3" RIGID STEEL WITH 2" CO | 113 FT | $75.00 | $75.00 |
| 625E98100 LIGHTING, MISC.: UNDERGROUND CIRCUIT, 2 WIRE (MIS- | 548 FT | $8.00 | $8.00 |
| 625E98200 LIGHTING, MISC.: EXISTING UNDERGROUND SYSTEM REMOV | 1 LS | $1,450 | $1,450 |
| 625E98200 LIGHTING, MISC.: MAINTAIN EXISTING AND TEMPORARY L Section 6 - LIGHTING - Totals Awd $185,314.00 2 $180,314.00 | 1 LS | $16,000 | $16,000 |
| 621E00100 RPM | 164 EACH | $52.00 | $51.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 16 EACH | $14.90 | $12.50 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 3 EACH | $15.00 | $12.50 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 3 EACH | $16.00 | $12.50 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 76 FT | $18.00 | $23.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 94.4 FT | $20.00 | $24.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 66.7 FT | $25.00 | $28.00 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 66.6 FT | $40.00 | $25.00 |
| 630E08004 ONE WAY SUPPORT, NO. 3 POST | 57 FT | $20.50 | $23.50 |
| 630E08600 SIGN POST REFLECTOR | 18 EACH | $45.00 | $50.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 4 EACH | $635 | $310 |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 6 EACH | $855 | $861 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 3 EACH | $525 | $638 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 4 EACH | $285 | $165 |
| 630E79610 SIGN SUPPORT ASSEMBLY, BARRIER MOUNTED | 1 EACH | $1,825 | $1,446 |
| 630E80100 SIGN, FLAT SHEET | 270 SF | $21.00 | $25.00 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 14 SF | $35.00 | $68.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 55 SF | $28.00 | $28.00 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 288 SF | $28.00 | $28.00 |
| 630E80300 SIGN, OVERLAY | 185 SF | $36.00 | $32.00 |
| 630E83000 COVERING OF SIGN | 56 SF | $30.00 | $25.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 4 EACH | $1,485 | $1,000 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 5 EACH | $15.00 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $65.00 | $350 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 6 EACH | $20.00 | $25.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $365 | $400 |
| 630E86272 REMOVAL OF GROUND MOUNTED PIPE SUPPORT AND DISPOSA | 1 EACH | $95.00 | $400 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 6 EACH | $595 | $400 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 5 EACH | $55.00 | $25.00 |
| 630E89894 REMOVAL OF TEMPORARY OVERLAY SIGN AND DISPOSAL | 13 EACH | $345 | $450 |
| 630E97700 SIGNING, MISC.:TRAFFIC SIGNAL SIGNS | 1 EACH | $325 | $1,100 |
| 630E97700 SIGNING, MISC.:WAYFINDING GROUND MOUNTED SUPPORT, | 2 EACH | $1,950 | $2,000 |
| 630E97800 SIGNING, MISC.:WAYFINDING SIGN | 6.2 SF | $350 | $100 |
| 644E00104 EDGE LINE, 6" | 0.04 MILE | $6,500 | $10,000 |
| 644E00204 LANE LINE, 6" | 0.22 MILE | $4,000 | $3,510 |
| 644E00300 CENTER LINE | 0.21 MILE | $10,300 | $12,950 |
| 644E00404 CHANNELIZING LINE, 12" | 46 FT | $3.00 | $4.00 |
| 644E00500 STOP LINE | 118 FT | $8.00 | $9.50 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 244 FT | $8.00 | $9.50 |
| 644E00720 CHEVRON MARKING | 276 FT | $7.00 | $9.50 |
| 644E01300 LANE ARROW | 32 EACH | $125 | $120 |
| 644E01360 WRONG WAY ARROW | 2 EACH | $150 | $230 |
| 807E14010 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, EDG | 0.78 MILE | $6,000 | $7,950 |
| 807E14110 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, LAN | 0.65 MILE | $2,000 | $3,100 |
| 807E14310 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, CHA | 3,497 FT | $3.50 | $2.90 |
| 807E14410 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, DOT | 1,308 FT | $2.50 | $1.50 |
| 814E00010 INTERSTATE ELONGATED ROUTE SHIELD SYMBOL MARKING, | 1 EACH | $1,800 | $4,500 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1,700 | $2,550 |
| 850E10110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1.50 | $1.15 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING Section 7 - TRAFFIC CONTROL - Totals Awd $123,734.90 2 $123,923.15 | — | $2.00 | $1.75 |
| 625E32000 GROUND ROD | 4 EACH | $325 | $325 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 8 EACH | $900 | $900 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 8 EACH | $35.00 | $35.00 |
| 632E30300 MESSENGER WIRE, 7 STRAND, 7/16" DIAMETER WITH ACCE | 435 FT | $19.20 | $19.20 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 435 FT | $26.00 | $26.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 478 FT | $3.50 | $3.50 |
| 632E83600 STRAIN POLE, MISC.:TYPE 4170, DESIGN 11 | 4 EACH | $13,500 | $13,500 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $3,500 | $3,500 |
| 632E90400 SIGNALIZATION, MISC.:FOUNDATION PRE-EXCAVATION | 1 EACH | $3,800 | $3,800 |
| 632E90400 SIGNALIZATION, MISC.:STOP LINE RADAR DETECTION | 1 EACH | $9,300 | $9,300 |
| 632E62810 INTERCONNECT CABLE, MISC.:, CAT 5E CABLE, OUTDOOR | 42 FT | $2.50 | $2.50 |
| 632E62820 INTERCONNECT, MISC.:, SPREAD SPECTRUM RADIO ASSEMB Section 8 - TRAFFIC SIGNALS - Totals Awd $175,320.00 2 $175,320.00 | 1 EACH | $1,500 | $1,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 136 HOUR | $125 | $110 |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $31,500 | $25,000 |
| 614E11630 INCREASED BARRIER DELINEATION | 2,704 FT | $1.85 | $0.75 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,920 | $2,200 |
| 614E12420 DETOUR SIGNING | 1 LS | $16,000 | $43,000 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 536 EACH | $70.00 | $48.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 26 EACH | $11.00 | $15.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, ONE WAY | 20 EACH | $20.00 | $15.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 90 EACH | $21.00 | $20.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 28 SNMT | $1,200 | $800 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 0.19 MILE | $7,000 | $675 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.17 MILE | $7,300 | $2,532 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.25 MILE | $7,100 | $1,479 |
| 614E22056 WORK ZONE EDGE LINE, CLASS I, 6", 807 PAINT | 1.22 MILE | $4,200 | $2,921 |
| 614E23110 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 807 PAI | 6,857 FT | $1.10 | $1.45 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 74 FT | $1.00 | $0.50 |
| 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I | 268 FT | $12.00 | $1.35 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 81 FT | $12.00 | $3.60 |
| 614E28000 WORK ZONE GORE MARKING, CLASS II | 87 FT | $10.00 | $1.40 |
| 614E30000 WORK ZONE ARROW, CLASS I | 22 EACH | $80.00 | $115 |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 81 SY | $280 | $190 |
| 616E10000 WATER | 53 MGAL | $95.00 | $70.00 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.29 MILE | $7,000 | $586 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.21 MILE | $7,300 | $1,689 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.6 MILE | $7,100 | $1,095 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 2,858 FT | $1.10 | $0.75 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 1,308 FT | $1.00 | $0.50 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 520 FT | $9.00 | $1.15 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 118 FT | $12.00 | $3.30 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT Section 9 - MAINTENANCE OF TRAFFIC - Totals Awd $292,268.90 2 $265,789.44 | 34 EACH | $80.00 | $110 |
| 512E10000 SEALING OF CONCRETE SURFACES Section 10 - MISCELLANEOUS STRUCTURE - Totals Awd $24,246.00 2 $26,940.00 | 1,796 SY | $13.50 | $15.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $50,000 | $42,500 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $16,000 | $27,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 219 CY | $138 | $190 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $30,150 | $34,468 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $11,400 | $8,500 |
| 619E16010 FIELD OFFICE, TYPE B | 9 MNTH | $2,500 | $5,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →