Skip to content
Figure 0.1 · BRIEFING
BID #260204 · ODOTRESULT · awarded Apr 23

LOR-US 20/SR 301-16.93/19.54

LOR County · est $3.8M

Bid dateThursday, April 23
Awarded toKOKOSING CONSTRUCTION COMPANY INC$4.32M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

118ITEMS
  • Guardrail & Barrier22%
  • Maintaining Traffic19%
  • Pavement Marking12%
  • Curb, Walk & Ramp8%
  • Signals & Lighting6%
  • Drainage5%
  • Other29%

Top items by winning bid

ItemQtyUnit priceExtended%
442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (48,090 CY$260$2.10M49%
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(1.50")194,132 SY$1.39$270k6%
624E10000 MOBILIZATION Section 13 - INCIDENTALS - Totals Awd $373,259.56 2 $617,000.001 LS$215,970$216k5%
251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA492 CY$435$214k5%
251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA211 CY$800$169k4%
614E11000 MAINTAINING TRAFFIC1 LS$115,868$116k3%
611E98630 CATCH BASIN ADJUSTED TO GRADE109 EACH$990$108k2%
622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D258 FT$300$77k2%
407E20000 NON-TRACKING TACK COAT17,472 GAL$2.7$47k1%
611E99654 MANHOLE ADJUSTED TO GRADE46 EACH$1,000$46k1%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 98 more items below.

Rank 1Kokosing Construction Company INC$4.32MRank 2Karvo Companies INC$5.14M
ItemQuantityR1Kokosing Construction Company INCR2Karvo Companies INC
442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (48,090 CY$260$300
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(1.50")194,132 SY$1.39$3.00
624E10000 MOBILIZATION Section 13 - INCIDENTALS - Totals Awd $373,259.56 2 $617,000.001 LS$215,970$236,000
251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA492 CY$435$350
251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA211 CY$800$750
614E11000 MAINTAINING TRAFFIC1 LS$115,868$325,000
611E98630 CATCH BASIN ADJUSTED TO GRADE109 EACH$990$985
622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D258 FT$300$175
407E20000 NON-TRACKING TACK COAT17,472 GAL$2.70$2.50
611E99654 MANHOLE ADJUSTED TO GRADE46 EACH$1,000$765
632E64021 PEDESTAL FOUNDATION, AS PER PLAN12 EACH$3,800$3,800
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST440 HOUR$100$125
608E10000 4" CONCRETE WALK2,560 SF$16.00$10.25
608E52000 CURB RAMP2,131 SF$17.50$17.75
253E02001 PAVEMENT REPAIR, AS PER PLAN (LONGITUDINAL)62 CY$500$800
606E15050 GUARDRAIL, TYPE MGS1,312.5 FT$21.00$21.00
606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL)3 EACH$8,800$8,800
609E33000 CURB, TYPE 10896 FT$28.00$25.50
614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN24 SNMT$950$875
408E10001 PRIME COAT, AS PER PLAN3,581 GAL$6.00$5.00
Show all 118 line items
ItemQuantityR1Kokosing Construction Company INCR2Karvo Companies INC
201E11000 CLEARING AND GRUBBING1 LS$2,100$5,000
202E30000 WALK REMOVED4,307 SF$3.50$2.35
202E32000 CURB REMOVED1,513 FT$14.00$11.95
202E32500 CURB AND GUTTER REMOVED445 FT$15.00$13.25
202E38000 GUARDRAIL REMOVED2,599.75 FT$2.00$2.00
202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A7 EACH$200$200
202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E5 EACH$200$200
202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T5 EACH$200$200
202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED6 EACH$200$200
202E75000 FENCE REMOVED30 FT$10.00$10.00
203E20001 EMBANKMENT, AS PER PLAN(GUARDRAIL)33 CY$60.00$60.00
209E60500 LINEAR GRADING7.63 MILE$993$2,000
209E61000 SPECIAL - SHAPING107 SY$5.00$35.00
516E13400 3/4" PREFORMED EXPANSION JOINT FILLER214 SF$4.00$20.00
606E13000 GUARDRAIL, TYPE 5687.5 FT$21.00$21.00
606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS112.5 FT$29.00$29.00
606E17000 RAISING TYPE 5 GUARDRAIL75 FT$8.00$8.00
606E25000 ANCHOR ASSEMBLY, TYPE A1 EACH$1,450$1,450
606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 20167 EACH$2,575$2,575
606E26500 ANCHOR ASSEMBLY, TYPE T1 EACH$1,375$1,375
606E26550 ANCHOR ASSEMBLY, MGS TYPE T5 EACH$1,375$1,375
606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 16 EACH$2,450$2,450
606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 24 EACH$725$725
606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 22 EACH$725$725
609E12000 COMBINATION CURB AND GUTTER, TYPE 2300 FT$44.00$40.50
609E26000 CURB, TYPE 6317 FT$32.00$27.50
622E25000 CONCRETE BARRIER END SECTION, TYPE D4 EACH$5,000$10,000
623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE2 EACH$1,000$645
623E39600 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE1 EACH$1,800$1,525
623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND Section 1 - ROADWAY - Totals Awd $414,172.46 2 $390,045.801 LS$1,172$800
601E32304 ROCK CHANNEL PROTECTION, TYPE D WITH GEOTEXTILE FA19 CY$250$400
659E00301 TOPSOIL, AS PER PLAN(CURB RAMPS)23 CY$130$145
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $8,740.00 2 $11,923.501,000 EACH$1.00$1.00
611E04600 12" CONDUIT, TYPE C23 FT$100$210
611E98370 CATCH BASIN, NO. 61 EACH$5,800$6,650
611E99150 INLET ADJUSTED TO GRADE4 EACH$1,500$1,395
611E99820 SPECIAL - MISCELLANEOUS METAL Section 3 - DRAINAGE - Totals Awd $176,260.00 2 $166,357.053,000 LB$2.75$2.25
253E02001 PAVEMENT REPAIR, AS PER PLAN (TRANSVERSE)21 CY$800$1,000
254E01600 PATCHING PLANED SURFACE9,908 SY$1.25$1.00
617E10100 COMPACTED AGGREGATE Section 4 - PAVEMENT - Totals Awd $2,904,788.88 2 $3,519,214.00497 CY$40.00$75.00
638E10800 VALVE BOX ADJUSTED TO GRADE Section 5 - WATER WORK - Totals Awd $19,200.00 2 $13,198.8024 EACH$800$550
626E00102 BARRIER REFLECTOR, TYPE 1, 1 WAY, (W)11 EACH$13.00$13.00
626E00102 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL, (W/W)20 EACH$13.00$13.00
626E00102 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL, (Y/Y)11 EACH$13.00$13.00
630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION3 EACH$100$100
630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT3 EACH$50.00$50.00
644E00404 CHANNELIZING LINE, 12"8,040 FT$1.85$1.85
644E00500 STOP LINE772 FT$8.00$8.00
644E00620 CROSSWALK LINE, 12"1,942 FT$6.00$6.00
644E00700 TRANSVERSE/DIAGONAL LINE(WHITE)174 FT$6.75$6.75
644E00700 TRANSVERSE/DIAGONAL LINE(YELLOW)778 FT$6.75$6.75
644E00900 ISLAND MARKING160 SF$7.00$7.00
644E01110 SCHOOL SYMBOL MARKING, 96"4 EACH$385$385
644E01300 LANE ARROW125 EACH$115$115
644E50300 PAVEMENT MARKING, MISC.:CROSSWALK LINE, 18", AS PE1,631 FT$9.00$9.00
646E10010 EDGE LINE, 6"(WHITE)0.16 MILE$5,750$5,750
646E10010 EDGE LINE, 6"(YELLOW)0.16 MILE$5,750$5,750
646E10110 LANE LINE, 6"0.16 MILE$5,750$5,750
646E10510 CROSSWALK LINE, 12" Section 6 - TRAFFIC CONTROL - Totals Awd $76,723.00 2 $76,723.00170 FT$12.50$12.50
AA2 644E00104 EDGE LINE, 6"(WHITE) (ALTERNATIVE 2)4.61 MILE$3,201$3,000
AA2 644E00104 EDGE LINE, 6"(YELLOW) (ALTERNATIVE 2)4.61 MILE$3,201$3,000
AA2 644E00204 LANE LINE, 6"(ALTERNATIVE 2)4.61 MILE$1,974$1,850
AA2 644E00300 CENTER LINE(ALTERNATIVE 2) Section 7 - TRAFFIC CONTROL ALTERNATES (US 20) - Totals Awd $39,009.63 2 $36,563.500.03 MILE$13,336$12,500
AB2 644E00204 LANE LINE, 6"(ALTERNATIVE 2)3.74 MILE$1,974$1,850
AB2 644E00300 CENTER LINE(ALTERNATIVE 2) Section 8 - TRAFFIC CONTROL ALTERNATES (SR 301) - Totals Awd $22,179.82 2 $20,789.002.92 MILE$5,068$4,750
625E31600 PULL BOX, MISC.:PULL BOX ADJUSTED TO GRADE, SLIP R5 EACH$1,250$1,250
625E32000 GROUND ROD12 EACH$450$450
632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN,5 EACH$1,500$1,500
632E26000 PEDESTRIAN PUSHBUTTON5 EACH$950$950
632E89920 PEDESTAL, 10.7' TALL, TRANSFORMER BASE5 EACH$3,200$3,200
632E90010 PEDESTAL, MISC.:REUSE OF PEDESTRIAN PEDESTAL7 EACH$1,450$1,450
632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM(PEDES6 EACH$900$900
632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM(PEDES4 EACH$1,200$1,200
632E90203 REUSE OF PEDESTRIAN SIGNAL HEAD, AS PER PLAN7 EACH$1,200$1,200
632E90211 REUSE OF PEDESTRIAN PUSHBUTTON, AS PER PLAN Section 9 - TRAFFIC SIGNALS - Totals Awd $119,850.00 2 $119,850.007 EACH$800$800
614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS$2,148$2,150
614E12460 WORK ZONE MARKING SIGN(R4-1-24) DO NOT PASS60 EACH$164$75.00
614E12460 WORK ZONE MARKING SIGN(W8-H12A-36) NO EDGE LINE16 EACH$166$75.00
614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC50 CY$125$250
614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL)23 EACH$26.40$15.00
614E13360 OBJECT MARKER, TWO WAY23 EACH$36.90$25.00
614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT16.7 MILE$485$485
614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT5.9 MILE$1,075$1,075
614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I (0.08 MILE$12,000$12,000
614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I (0.08 MILE$12,000$12,000
614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT16.7 MILE$850$850
614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT1,544 FT$3.25$3.25
614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I (COMBINAT1 EACH$550$550
614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I (LEFT)1 EACH$275$275
622E41100 PORTABLE BARRIER, UNANCHORED Section 10 - MAINTENANCE OF TRAFFIC - Totals Awd $140,551.62 2 $149,080.00560 FT$15.30$16.00
409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT72 FT$55.00$22.17
519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE B Section 11 - STRUCTURE REPAIR (SFN: 4702670) - Totals Awd $9,960.00 2 $5,494.745 SY$1,200$780
409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT72 FT$55.00$22.17
519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE B Section 12 - STRUCTURE REPAIR (SFN: 4702700) - Totals Awd $18,960.00 2 $13,291.7415 SY$1,000$780
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$17,280$15,000
619E16010 FIELD OFFICE, TYPE B6 MNTH$3,200$3,500
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$3,300$10,000
623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P1 LS$1,641$10,000

Project details

Description
LOR-US 20/SR 301-16.93/19.54
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →