Figure 0.1 · BRIEFING
BID #260179 · ODOTRESULT · awarded Apr 9

MED-SR 421-00.00

MED County · est $2.1M

Bid dateThursday, April 9
Awarded toKARVO COMPANIES INC$2.39M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

88ITEMS
  • Guardrail & Barrier15%
  • Maintaining Traffic13%
  • Pavement Marking10%
  • Removal & Demolition7%
  • Asphalt Paving7%
  • Earthwork6%
  • Other43%

Top items by winning bid

ItemQtyUnit priceExtended%
442E20170 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP3,042 CY$225$684k29%
442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (42,177 CY$245$533k22%
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0")62,267 SY$2.25$140k6%
614E11000 MAINTAINING TRAFFIC1 LS$125,000$125k5%
624E10000 MOBILIZATION Section 11 - INCIDENTALS - Totals Awd $318,500.00 2 $363,750.001 LS$123,000$123k5%
251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA225 CY$325$73k3%
251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA225 CY$315$71k3%
611E99654 MANHOLE ADJUSTED TO GRADE Section 3 - DRAINAGE - Totals Awd $100,500.00 2 $95,120.0029 EACH$1,700$49k2%
517E75600 DEEP BEAM BRIDGE RETROFIT RAILING250 FT$147$37k2%
611E98630 CATCH BASIN ADJUSTED TO GRADE18 EACH$2,000$36k2%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 68 more items below.

Rank 1Karvo Companies INC$2.39MRank 2Kokosing Construction Company INC$2.44M
ItemQuantityR1Karvo Companies INCR2Kokosing Construction Company INC
442E20170 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP3,042 CY$225$229
442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (42,177 CY$245$252
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0")62,267 SY$2.25$2.75
614E11000 MAINTAINING TRAFFIC1 LS$125,000$199,000
624E10000 MOBILIZATION Section 11 - INCIDENTALS - Totals Awd $318,500.00 2 $363,750.001 LS$123,000$123,200
251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA225 CY$325$450
251E01043 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA225 CY$315$270
611E99654 MANHOLE ADJUSTED TO GRADE Section 3 - DRAINAGE - Totals Awd $100,500.00 2 $95,120.0029 EACH$1,700$900
517E75600 DEEP BEAM BRIDGE RETROFIT RAILING250 FT$147$147
611E98630 CATCH BASIN ADJUSTED TO GRADE18 EACH$2,000$900
608E52000 CURB RAMP1,880 SF$16.00$18.30
617E10100 COMPACTED AGGREGATE390 CY$75.00$40.00
900E17000 SPECIAL - RAILROAD COORDINATION Section 10 - ITEMS OF WORK - Totals Awd $25,000.00 2 $2,500.001 LS$25,000$2,500
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$25,000$9,750
202E30000 WALK REMOVED2,676 SF$8.00$4.70
407E20000 NON-TRACKING TACK COAT8,135 GAL$2.40$2.50
619E16010 FIELD OFFICE, TYPE B6 MNTH$3,000$3,300
253E02001 PAVEMENT REPAIR, AS PER PLAN (TRANSVERSE)35 CY$500$460
625E33000 STRUCTURE GROUNDING SYSTEM Section 9 - STRUCTURE REPAIR (MED-421-0053 SFN 52079 - Totals Awd $54,250.00 2 $46,750.001 EACH$17,500$10,000
638E10800 VALVE BOX ADJUSTED TO GRADE Section 5 - WATER WORK - Totals Awd $15,600.00 2 $9,750.0013 EACH$1,200$750
Show all 88 line items
ItemQuantityR1Karvo Companies INCR2Kokosing Construction Company INC
201E11001 CLEARING AND GRUBBING, AS PER PLAN1 LS$5,000$2,600
202E23000 PAVEMENT REMOVED1 SY$25.00$40.00
202E32000 CURB REMOVED371 FT$35.00$16.00
202E38000 GUARDRAIL REMOVED387.5 FT$3.00$3.00
202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E3 EACH$200$200
202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T1 EACH$200$200
202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED3 EACH$200$200
202E47001 BRIDGE TERMINAL ASSEMBLY REMOVED, AS PER PLAN1 EACH$200$200
202E98000 REMOVAL MISC.: RETAINING WALL1 LS$5,000$600
202E98100 REMOVAL MISC.: ABANDONED SUPPORT FOUNDATION1 EACH$500$800
203E20001 EMBANKMENT, AS PER PLAN59 CY$65.00$65.00
209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN6.32 STA$65.00$65.00
209E60500 LINEAR GRADING5.93 MILE$1,275$3,900
209E80000 GRADING MAILBOX APPROACHES19 EACH$35.00$20.00
606E13000 GUARDRAIL, TYPE 5112.5 FT$23.00$23.00
606E15050 GUARDRAIL, TYPE MGS400 FT$23.00$23.00
606E17000 RAISING TYPE 5 GUARDRAIL31.25 FT$9.50$9.50
606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016)4 EACH$2,750$2,750
606E26500 ANCHOR ASSEMBLY, TYPE T1 EACH$1,450$1,450
606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 44 EACH$1,450$1,450
608E10000 4" CONCRETE WALK1,079 SF$13.00$18.30
609E26000 CURB, TYPE 6204 FT$75.00$40.50
623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN1 EACH$1,200$1,200
623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P1 EACH$1,500$2,000
623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND1 LS$2,500$2,000
690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE4 EACH$350$200
690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE Section 1 - ROADWAY - Totals Awd $157,993.43 2 $152,414.583 EACH$500$200
659E00301 TOPSOIL, AS PER PLAN10 CY$100$85.00
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $3,000.00 2 $2,850.002,000 EACH$1.00$1.00
611E01200 6" CONDUIT, TYPE D8 FT$25.00$40.00
611E99155 INLET RECONSTRUCTED TO GRADE, AS PER PLAN5 EACH$3,000$10,500
253E02001 PAVEMENT REPAIR, AS PER PLAN (LONGITUDINAL)37 CY$375$280
254E01600 PATCHING PLANED SURFACE321 SY$1.00$1.25
408E10001 PRIME COAT, AS PER PLAN2,526 GAL$5.00$4.00
617E20000 SHOULDER PREPARATION Section 4 - PAVEMENT - Totals Awd $1,602,898.25 2 $1,653,566.106,306 SY$1.25$0.35
621E00100 RPM159 EACH$41.00$57.00
621E54000 RAISED PAVEMENT MARKER REMOVED156 EACH$1.00$3.00
626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL)16 EACH$13.00$13.00
630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN16 FT$37.50$37.50
630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED2 EACH$125$125
630E80100 SIGN, FLAT SHEET12 SF$26.25$26.25
630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION2 EACH$125$125
630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT2 EACH$125$125
630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION2 EACH$150$150
642E00104 EDGE LINE, 6", TYPE 16.75 MILE$900$900
642E00300 CENTER LINE, TYPE 13.35 MILE$1,100$1,500
644E00500 STOP LINE308 FT$8.00$5.00
644E00620 CROSSWALK LINE, 12"873 FT$9.00$4.50
644E01000 RAILROAD SYMBOL MARKING2 EACH$900$625
644E50300 PAVEMENT MARKING, MISC.: CROSSWALK LINE, 18", AS P237 FT$7.00$17.50
646E10010 EDGE LINE, 6"0.08 MILE$33,000$37,500
646E10200 CENTER LINE Section 6 - TRAFFIC CONTROL - Totals Awd $36,348.00 2 $38,570.000.04 MILE$33,000$47,500
625E32000 GROUND ROD2 EACH$350$350
632E64021 PEDESTAL FOUNDATION, AS PER PLAN2 EACH$2,900$2,900
632E90010 PEDESTAL, MISC.: REUSE OF PEDESTRIAN PEDESTAL2 EACH$800$800
632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM (PEDE2 EACH$400$400
632E90203 REUSE OF PEDESTRIAN SIGNAL HEAD, AS PER PLAN2 EACH$700$700
632E90211 REUSE OF PEDESTRIAN PUSHBUTTON, AS PER PLAN Section 7 - TRAFFIC SIGNALS - Totals Awd $11,000.00 2 $11,000.002 EACH$350$350
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST50 HOUR$125$100
614E12460 WORK ZONE MARKING SIGN97 EACH$75.00$75.00
614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC30 CY$300$300
614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN12 SNMT$900$750
614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT10.32 MILE$1,270$1,500
614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT924 FT$7.00$5.00
614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN Section 8 - MAINTENANCE OF TRAFFIC - Totals Awd $62,889.40 2 $62,030.003,330 FT$3.00$3.50
100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY1 LS$7,500$7,500
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$10,000$2,000
623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P1 LS$10,000$2,500

Project details

Description
MED-SR 421-00.00
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →