Skip to content
Figure 0.1 · BRIEFING
BID #260158 · ODOTRESULT · awarded Mar 26

WOO-SR 25-06.64 Resurface Portage

WOO County · est $1.5M

Bid dateThursday, March 26
Awarded toGERKEN PAVING INC$1.17M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

67ITEMS
  • Maintaining Traffic18%
  • Pavement Marking10%
  • Earthwork9%
  • Removal & Demolition9%
  • Curb, Walk & Ramp7%
  • Erosion & Landscaping7%
  • Other39%

Top items by winning bid

ItemQtyUnit priceExtended%
442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE1,084 CY$200$217k19%
442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (650 CY$240$156k13%
608E10000 4" CONCRETE WALK16,416 SF$6.75$111k9%
609E24510 CURB, TYPE 4-C3,701 FT$19$70k6%
452E12011 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P,840 SY$75$63k5%
255E11000 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,320 SY$158$51k4%
614E11000 MAINTAINING TRAFFIC1 LS$50,000$50k4%
624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $123,080.00 2 $167,880.001 LS$50,000$50k4%
202E23501 WEARING COURSE REMOVED, AS PER PLAN (8" AVG.)7,700 SY$4.55$35k3%
202E32000 CURB REMOVED3,307 FT$10$33k3%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 47 more items below.

Rank 1Gerken Paving INC$1.17MRank 2Shelly Company$1.23M
ItemQuantityR1Gerken Paving INCR2Shelly Company
442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE1,084 CY$200$193
442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (650 CY$240$228
608E10000 4" CONCRETE WALK16,416 SF$6.75$6.75
609E24510 CURB, TYPE 4-C3,701 FT$19.00$19.00
452E12011 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P,840 SY$75.00$75.00
255E11000 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,320 SY$158$158
614E11000 MAINTAINING TRAFFIC1 LS$50,000$50,000
624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $123,080.00 2 $167,880.001 LS$50,000$100,000
202E23501 WEARING COURSE REMOVED, AS PER PLAN (8" AVG.)7,700 SY$4.55$6.75
202E32000 CURB REMOVED3,307 FT$10.00$10.00
614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I2 MILE$14,000$14,000
202E30000 WALK REMOVED14,920 SF$1.85$1.85
254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, A3,622 SY$5.80$5.25
202E23001 PAVEMENT REMOVED, AS PER PLAN840 SY$23.00$23.00
614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P60 CY$300$250
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (4") STA. 112+3,821 SY$4.00$2.80
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $19,342.50 2 $19,342.5015,000 EACH$1.00$1.00
611E98634 CATCH BASIN RECONSTRUCTED TO GRADE10 EACH$1,400$1,400
638E20502 SPECIAL - VALVE BOX REBUILT TO GRADE, NWWSD Section 5 - WATER WORK - Totals Awd $18,150.00 2 $24,900.0014 EACH$975$1,200
452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS140 SY$88.50$88.50
Show all 67 line items
ItemQuantityR1Gerken Paving INCR2Shelly Company
201E11000 CLEARING AND GRUBBING1 LS$4,000$4,000
202E98100 REMOVAL MISC.:REMOVE AND REPLACE STOOP STEPS4 EACH$900$900
203E10000 EXCAVATION100 CY$40.00$40.00
204E10000 SUBGRADE COMPACTION276 SY$2.50$2.50
608E52000 CURB RAMP750 SF$6.75$6.75
625E75522 LUMINAIRE SUPPORT FOUNDATION REMOVED Section 1 - ROADWAY - Totals Awd $315,306.50 2 $332,246.502 EACH$900$900
653E10000 TOPSOIL FURNISHED AND PLACED41 CY$75.00$75.00
654E11000 COMMERCIAL FERTILIZER0.05 TON$1,500$1,500
659E10000 SEEDING AND MULCHING365 SY$2.50$2.50
659E14000 REPAIR SEEDING AND MULCHING18 SY$10.00$10.00
659E35000 WATER2 MGAL$50.00$50.00
605E14021 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC, A100 FT$12.00$12.00
611E00511 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, AS PER10 FT$25.00$25.00
611E99654 MANHOLE ADJUSTED TO GRADE5 EACH$1,500$1,500
611E99660 MANHOLE RECONSTRUCTED TO GRADE Section 3 - DRAINAGE - Totals Awd $32,950.00 2 $33,450.005 EACH$2,000$2,100
255E20000 FULL DEPTH PAVEMENT SAWING1,440 FT$3.50$3.50
304E20000 AGGREGATE BASE(DRIVEWAYS)46 CY$65.00$65.00
407E10000 TACK COAT2,120 GAL$2.50$3.00
452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS150 SY$73.00$73.00
617E10100 COMPACTED AGGREGATE20 CY$135$127
875E10000 LONGITUDINAL JOINT ADHESIVE Section 4 - PAVEMENT - Totals Awd $565,021.60 2 $542,156.30600 LB$5.00$2.00
638E10800 VALVE BOX ADJUSTED TO GRADE9 EACH$500$900
621E00100 RPM12 EACH$365$385
621E54000 RAISED PAVEMENT MARKER REMOVED5 EACH$25.00$7.00
630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST54 FT$12.00$12.00
630E80101 SIGN, FLAT SHEET, AS PER PLAN22 SF$24.00$24.00
630E86003 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA1 EACH$25.00$25.00
630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION2 EACH$85.00$85.00
642E00104 EDGE LINE, 6", TYPE 11 MILE$1,200$1,200
642E00204 LANE LINE, 6", TYPE 11 MILE$800$800
642E00300 CENTER LINE, TYPE 10.5 MILE$1,500$1,500
644E00500 STOP LINE103 FT$9.00$9.00
644E00630 CROSSWALK LINE, 24"538 FT$9.00$9.00
644E20800 YIELD LINE Section 6 - TRAFFIC CONTROL - Totals Awd $15,115.00 2 $15,265.0048 FT$15.00$15.00
411E10001 STABILIZED CRUSHED AGGREGATE, AS PER PLAN$53.00$110
614E12460 WORK ZONE MARKING SIGN27 EACH$120$85.00
614E12500 REPLACEMENT SIGN5 EACH$120$200
614E12600 REPLACEMENT DRUM10 EACH$54.00$55.00
614E18600 PORTABLE CHANGEABLE MESSAGE SIGN2 SNMT$1,350$1,000
614E21000 WORK ZONE CENTER LINE, CLASS I2 MILE$1,500$1,500
614E22010 WORK ZONE EDGE LINE, CLASS I, 6"1 MILE$1,200$1,200
614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I1 MILE$9,000$9,000
614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I2,945 FT$1.75$1.75
616E10000 WATER Section 7 - MAINTENANCE OF TRAFFIC - Totals Awd $82,283.75 2 $93,198.755 MGAL$50.00$800
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$8,000$3,000
108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS1 LS$5,000$4,800
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$10,080$10,080

Project details

Description
WOO-SR 25-06.64 Resurface Portage
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →