LAW-SR 141/CR 7E-02.45
LAW County · est $0.2M
Bid dateThursday, March 26—
Awarded toSHELLY COMPANY$257,739.12
LAW County · est $0.2M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $35k | 14% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 111 CY | $263 | $29k | 11% |
| 202E23000 PAVEMENT REMOVED | 1,857 SY | $12 | $22k | 9% |
| 622E41100 PORTABLE BARRIER, UNANCHORED Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $40,511.00 2 $33,047.50 3 $45,885.00 | 334 FT | $48 | $16k | 6% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (33 CY | $452 | $15k | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 33 CY | $447 | $15k | 6% |
| 304E20000 AGGREGATE BASE | 126 CY | $113 | $14k | 6% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $65,500.00 2 $72,800.00 3 $97,000.00 | 1 LS | $14,000 | $14k | 5% |
| 203E20000 EMBANKMENT | 256 CY | $52 | $13k | 5% |
| 659E00300 TOPSOIL | 159 CY | $68 | $11k | 4% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 23 more items below.
| Item | Quantity | R1Shelly Company | R2Axis Civil Construction LLC | R3Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $25,000 | $25,000 | 14% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 111 CY | $263 | $390 | $400 | 12% |
| 202E23000 PAVEMENT REMOVED | 1,857 SY | $12.00 | $12.50 | $20.00 | 9% |
| 622E41100 PORTABLE BARRIER, UNANCHORED Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $40,511.00 2 $33,047.50 3 $45,885.00 | 334 FT | $48.00 | $35.00 | $35.00 | 7% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (33 CY | $452 | $480 | $520 | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 33 CY | $447 | $490 | $540 | 6% |
| 304E20000 AGGREGATE BASE | 126 CY | $113 | $142 | $5.00 | 6% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $65,500.00 2 $72,800.00 3 $97,000.00 | 1 LS | $14,000 | $30,000 | $40,000 | 6% |
| 203E20000 EMBANKMENT | 256 CY | $52.00 | $35.00 | $90.00 | 5% |
| 659E00300 TOPSOIL | 159 CY | $68.00 | $62.00 | $80.00 | 4% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 61 SY | $170 | $132 | $300 | 4% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $3,560 | $3,200 | $4,100 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,000 | $7,500 | $4,900 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,000 | $12,000 | $15,000 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $4,200 | $7,000 | 3% |
| 659E10000 SEEDING AND MULCHING | 1,430 SY | $3.75 | $2.60 | $2.50 | 2% |
| 203E10000 EXCAVATION | 79 CY | $66.00 | $35.00 | $30.00 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 48 HOUR | $92.00 | $75.00 | $100 | 2% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $20,015.22 2 $17,593.00 3 $21,688.00 | 3,000 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 204E10000 SUBGRADE COMPACTION | 766 SY | $2.85 | $5.00 | $8.50 | 1% |
| Item | Quantity | R1Shelly Company | R2Axis Civil Construction LLC | R3Alan Stone CO INC |
|---|---|---|---|---|
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET Section 1 - ROADWAY - Totals Awd $50,293.10 2 $46,592.50 3 $74,591.00 | 1 EACH | $300 | $325 | $630 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $150 | $170 |
| 659E14000 REPAIR SEEDING AND MULCHING | 72 SY | $1.00 | $2.60 | $4.50 |
| 659E15000 INTER-SEEDING | 72 SY | $0.01 | $3.15 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.2 TON | $1,500 | $1,250 | $650 |
| 659E31000 LIME | 0.3 ACRE | $200 | $150 | $930 |
| 659E35000 WATER | 8 MGAL | $1.00 | $1.00 | $120 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE Section 3 - DRAINAGE - Totals Awd $1,180.00 2 $2,000.00 3 $2,200.00 | 2 EACH | $590 | $1,000 | $1,100 |
| 407E20000 NON-TRACKING TACK COAT | 98 GAL | $4.10 | $6.00 | $4.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE Section 4 - PAVEMENT - Totals Awd $74,017.80 2 $94,631.00 3 $84,842.00 | 7.4 LB | $70.00 | $115 | $600 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 54.4 FT | $25.00 | $25.00 | $30.00 |
| 630E80100 SIGN, FLAT SHEET | 29.5 SF | $40.00 | $40.00 | $45.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $100 | $100 | $120 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $100 | $100 | $120 |
| 644E00100 EDGE LINE, 4" | 0.12 MILE | $8,150 | $8,150 | $23,000 |
| 644E00300 CENTER LINE | 0.1 MILE | $13,000 | $13,000 | $37,000 |
| 644E00500 STOP LINE | 16 FT | $12.00 | $12.00 | $35.00 |
| 644E01500 DOTTED LINE, 4" Section 5 - TRAFFIC CONTROL - Totals Awd $6,222.00 2 $6,222.00 3 $11,815.50 | 106 FT | $2.00 | $2.00 | $6.00 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.13 MILE | $9,950 | $14,450 | $11,000 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.19 MILE | $6,650 | $7,500 | $7,700 |
| 616E10000 WATER | 2 MGAL | $8.00 | $1.00 | $1.00 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,500 | $800 | $5,000 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,500 | $800 | $5,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →