FRA-IR 270-32.92 at Easton Way
FRA County · est $5.0M
Bid dateThursday, March 26—
Awarded toCOMPLETE GENERAL CONSTRUCTION COMPANY$5.19M
FRA County · est $5.0M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 452E15010 12" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 4,553 SY | $118 | $537k | 10% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,408 CY | $321 | $452k | 9% |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 2,099 CY | $208 | $437k | 8% |
| 624E10000 MOBILIZATION Section 9 - INCIDENTALS - Totals Awd $557,700.00 2 $660,971.33 3 $720,800.00 | 1 LS | $259,000 | $259k | 5% |
| 304E20000 AGGREGATE BASE | 2,824 CY | $86 | $243k | 5% |
| 202E23000 PAVEMENT REMOVED | 7,694 SY | $27 | $208k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $178,700 | $179k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED Section 8 - MAINTENANCE OF TRAFFIC - Totals Awd $461,178.14 2 $466,621.80 3 $551,935.69 | 7,660 FT | $21 | $161k | 3% |
| 203E10000 EXCAVATION | 5,988 CY | $26 | $156k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 23,483 SY | $6.35 | $149k | 3% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 216 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Ruhlin Company | % of bid |
|---|---|---|---|---|---|
| 452E15010 12" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 4,553 SY | $118 | $142 | $119 | 15% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 1,408 CY | $321 | $265 | $321 | 12% |
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 2,099 CY | $208 | $180 | $208 | 12% |
| 624E10000 MOBILIZATION Section 9 - INCIDENTALS - Totals Awd $557,700.00 2 $660,971.33 3 $720,800.00 | 1 LS | $259,000 | $265,000 | $309,900 | 7% |
| 304E20000 AGGREGATE BASE | 2,824 CY | $86.00 | $88.00 | $127 | 7% |
| 202E23000 PAVEMENT REMOVED | 7,694 SY | $27.00 | $25.00 | $33.00 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $178,700 | $247,500 | $235,300 | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED Section 8 - MAINTENANCE OF TRAFFIC - Totals Awd $461,178.14 2 $466,621.80 3 $551,935.69 | 7,660 FT | $21.00 | $23.00 | $24.31 | 4% |
| 203E10000 EXCAVATION | 5,988 CY | $26.00 | $30.00 | $21.00 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 23,483 SY | $6.35 | $4.00 | $6.35 | 4% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 499 CY | $291 | $240 | $291 | 4% |
| 203E20000 EMBANKMENT | 6,897 CY | $17.00 | $28.00 | $38.00 | 3% |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 6,159 FT | $19.00 | $23.00 | $28.00 | 3% |
| 204E30020 GRANULAR MATERIAL, TYPE C, 12" | 1,469 CY | $66.00 | $78.00 | $102 | 3% |
| 630E72420 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 2 | 1 EACH | $94,750 | $92,000 | $92,000 | 3% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 5,164 FT | $13.00 | $18.00 | $24.50 | 2% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 534 CY | $120 | $130 | $152 | 2% |
| 630E72410 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 1 | 1 EACH | $63,200 | $62,000 | $62,000 | 2% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 870 SY | $70.00 | $75.00 | $115 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $60,000 | $67,500 | $60,000 | 2% |
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Ruhlin Company |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $44,500 | $44,000 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $1,880 | $2,200 | $4,000 |
| 202E20010 HEADWALL REMOVED | 6 EACH | $650 | $900 | $400 |
| 202E30600 CONCRETE MEDIAN REMOVED | 5 SY | $60.00 | $125 | $108 |
| 202E30700 CONCRETE BARRIER REMOVED | 77 FT | $75.00 | $75.00 | $155 |
| 202E32000 CURB REMOVED | 981 FT | $8.00 | $7.00 | $2.50 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 57 FT | $80.00 | $30.00 | $36.00 |
| 202E38000 GUARDRAIL REMOVED | 1,035 FT | $2.00 | $2.80 | $2.00 |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $480 | $600 | $613 |
| 202E98100 REMOVAL MISC.: PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $180 | $150 | $300 |
| 204E10000 SUBGRADE COMPACTION | 13,853 SY | $2.70 | $5.00 | $1.60 |
| 204E13000 EXCAVATION OF SUBGRADE, 12" | 1,469 CY | $35.00 | $60.00 | $54.00 |
| 204E45000 PROOF ROLLING | 8 HOUR | $360 | $300 | $305 |
| 204E50000 GEOTEXTILE FABRIC | 4,407 SY | $2.20 | $2.50 | $1.35 |
| 606E15050 GUARDRAIL, TYPE MGS | 901 FT | $21.00 | $21.00 | $39.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 388 FT | $27.00 | $27.00 | $45.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 2 EACH | $2,525 | $2,600 | $3,650 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $1,350 | $1,250 | $2,150 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $2,680 | $2,600 | $3,150 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 2 EACH | $585 | $550 | $850 |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 1 EACH | $9,550 | $8,000 | $9,575 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 124 FT | $150 | $225 | $200 |
| 622E10200 BARRIER TRANSITION | 1 EACH | $5,400 | $4,800 | $5,800 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 1 EACH | $6,300 | $5,500 | $5,600 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 2 EACH | $4,770 | $5,000 | $7,200 |
| 622E90000 BARRIER, MISC.: CONCRETE BARRIER, SCD MC-9.3 | 20 FT | $285 | $390 | $510 |
| 622E90200 BARRIER, MISC.: CONCRETE BARRIER TRANSITION, SCD M | 1 EACH | $15,000 | $15,000 | $16,500 |
| 690E98400 SPECIAL - TREE BARRICADE, AS PER PLAN | 1 LS | $8,500 | $23,000 | $42,000 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER Section 1 - ROADWAY - Totals Awd $883,302.50 2 $1,115,182.50 3 $1,252,666.75 | 1 LS | $33,500 | $47,000 | $76,500 |
| 601E11000 RIPRAP, TYPE D | 23 SY | $400 | $450 | $430 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 12 SY | $135 | $155 | $198 |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 63 SY | $98.00 | $80.00 | $68.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $135 | $150 |
| 659E00300 TOPSOIL | 1,605 CY | $30.00 | $23.00 | $60.00 |
| 659E10000 SEEDING AND MULCHING | 14,460 SY | $0.75 | $0.65 | $0.75 |
| 659E14000 REPAIR SEEDING AND MULCHING | 723 SY | $0.75 | $0.80 | $0.75 |
| 659E15000 INTER-SEEDING | 723 SY | $0.75 | $0.80 | $0.75 |
| 659E20000 COMMERCIAL FERTILIZER | 3.25 TON | $1,250 | $740 | $1,250 |
| 659E31000 LIME | 2.99 ACRE | $150 | $158 | $150 |
| 659E35000 WATER | 82 MGAL | $1.00 | $1.00 | $1.00 |
| 659E40000 MOWING | 33 MSF | $50.00 | $50.00 | $50.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,000 | $3,500 | $3,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $12,000 | $19,000 | $16,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $13,400 | $13,386 | $13,385 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $225,367.50 2 $224,176.72 3 $294,146.92 | 49,271 EACH | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 11.8 CY | $2,150 | $3,800 | $3,800 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 436 FT | $22.00 | $28.00 | $56.00 |
| 611E04400 12" CONDUIT, TYPE B | 71 FT | $145 | $140 | $200 |
| 611E04600 12" CONDUIT, TYPE C | 81 FT | $120 | $160 | $100 |
| 611E05900 15" CONDUIT, TYPE B, 707.33 | 115 FT | $145 | $170 | $135 |
| 611E06700 15" CONDUIT, TYPE F | 55 FT | $155 | $130 | $160 |
| 611E10200 24" CONDUIT, TYPE A, 707.33 | 8 FT | $430 | $525 | $395 |
| 611E19400 42" CONDUIT, TYPE B, 707.33 | 8 FT | $590 | $815 | $625 |
| 611E21100 48" CONDUIT, TYPE C, 707.33 | 8 FT | $680 | $900 | $790 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $5,700 | $5,800 | $7,010 |
| 611E98180 CATCH BASIN, NO. 3A | 3 EACH | $4,150 | $4,700 | $6,580 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $1,780 | $1,650 | $2,270 |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $3,030 | $3,500 | $2,940 |
| 611E98840 INLET, NO. 2-A-6 | 1 EACH | $6,100 | $6,700 | $6,650 |
| 611E99650 MANHOLE FRAME AND COVER | 1 EACH | $500 | $425 | $1,201 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 7 EACH | $1,260 | $1,350 | $2,000 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $5,900 | $8,000 | $6,450 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 7 EACH | $375 | $415 | $475 |
| 670E00700 DITCH EROSION PROTECTION Section 3 - DRAINAGE - Totals Awd $327,480.00 2 $413,876.00 3 $496,052.31 | 346 SY | $2.50 | $1.50 | $2.50 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.25" | 1,516 SY | $14.25 | $5.00 | $14.25 |
| 257E10000 DIAMOND GRINDING PORTLAND CEMENT CONCRETE PAVEMENT | 3,075 SY | $9.20 | $17.00 | $5.95 |
| 407E20000 NON-TRACKING TACK COAT | 3,170 GAL | $4.20 | $3.50 | $4.20 |
| 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS | 3,075 SY | $11.00 | $10.50 | $10.50 |
| 609E24510 CURB, TYPE 4-C | 88 FT | $52.00 | $65.00 | $75.00 |
| 609E26000 CURB, TYPE 6 | 738 FT | $26.00 | $30.00 | $40.00 |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 175 FT | $36.00 | $38.00 | $73.00 |
| 609E72000 CONCRETE MEDIAN Section 4 - PAVEMENT - Totals Awd $2,091,220.05 2 $1,998,497.50 3 $2,219,336.80 | 4 SY | $280 | $270 | $400 |
| 625E00450 CONNECTION, FUSED PULL APART | 6 EACH | $120 | $120 | $194 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 2 EACH | $115 | $115 | $194 |
| 625E10500 LIGHT POLE, MISC.:RELOCATE EXISTING LIGHT POLE | 1 EACH | $850 | $850 | $361 |
| 625E14101 LIGHT POLE FOUNDATION, 24" X 8' DEEP, AS PER PLAN | 1 EACH | $3,000 | $3,000 | $2,052 |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 820 FT | $3.00 | $3.00 | $3.46 |
| 625E24300 1-1/2" DUCT CABLE WITH TWO NO. 2 AWG 2400 VOLT CAB | 373 FT | $16.00 | $16.00 | $20.25 |
| 625E25500 CONDUIT, 3", 725.04 | 389 FT | $35.00 | $30.00 | $38.54 |
| 625E29000 TRENCH | 752 FT | $9.00 | $9.00 | $8.72 |
| 625E30510 PULL BOX, 725.06, SIZE 4 | 2 EACH | $1,000 | $1,000 | $1,363 |
| 625E31511 PULL BOX REMOVED, AS PER PLAN | 1 EACH | $240 | $240 | $560 |
| 625E32000 GROUND ROD | 1 EACH | $325 | $325 | $235 |
| 625E36010 UNDERGROUND WARNING MARKING TAPE | 752 FT | $1.00 | $1.00 | $2.44 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $18,000 | $15,000 | $3,116 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 1 EACH | $500 | $500 | $406 |
| 625E75540 LIGHT TOWER FOUNDATION REMOVED | 1 EACH | $1,100 | $1,100 | $813 |
| 625E75551 DISTRIBUTION CABLE REMOVED, AS PER PLAN Section 5 - LIGHTING - Totals Awd $56,762.00 2 $51,817.00 3 $45,806.61 | 390 FT | $0.60 | $0.60 | $0.53 |
| 621E00100 RPM | 323 EACH | $42.00 | $50.00 | $42.85 |
| 621E54001 RAISED PAVEMENT MARKER REMOVED, AS PER PLAN | 207 EACH | $20.00 | $10.00 | $15.00 |
| 625E32000 GROUND ROD | 4 EACH | $325 | $450 | $106 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, 1 WAY | 6 EACH | $11.00 | $12.50 | $13.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1 WAY | 22 EACH | $13.50 | $12.50 | $13.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 98 FT | $19.00 | $15.00 | $15.00 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 84 FT | $35.00 | $25.00 | $25.00 |
| 630E08210 GROUND MOUNTED SUPPORT, PIPE | 17.9 FT | $30.00 | $25.00 | $25.00 |
| 630E09050 TRIANGULAR SLIP BASE CONNECTION | 1 EACH | $495 | $400 | $400 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 3 EACH | $240 | $150 | $150 |
| 630E80100 SIGN, FLAT SHEET | 81.25 SF | $20.00 | $25.00 | $25.00 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 42 SF | $35.00 | $65.00 | $65.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 28 SF | $24.00 | $32.00 | $32.00 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 564 SF | $25.00 | $28.00 | $28.00 |
| 630E84000 CONCRETE BARRIER MEDIAN OVERHEAD SIGN SUPPORT FOUN | 1 EACH | $19,094 | $10,500 | $10,500 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 3 EACH | $10,525 | $10,500 | $10,500 |
| 630E84600 GROUND MOUNTED PIPE SUPPORT FOUNDATION | 1 EACH | $725 | $750 | $750 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 9 EACH | $15.00 | $20.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 11 EACH | $20.00 | $20.00 | $20.00 |
| 630E86272 REMOVAL OF GROUND MOUNTED PIPE SUPPORT AND DISPOSA | 1 EACH | $115 | $400 | $400 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 4 EACH | $275 | $400 | $400 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 1 EACH | $35.00 | $20.00 | $20.00 |
| 630E89804 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 1 EACH | $2,950 | $2,500 | $2,500 |
| 644E00104 EDGE LINE, 6" | 0.63 MILE | $3,500 | $3,500 | $3,500 |
| 644E00204 LANE LINE, 6" | 0.84 MILE | $1,600 | $1,600 | $1,600 |
| 644E00300 CENTER LINE | 0.17 MILE | $5,000 | $5,000 | $5,000 |
| 644E00404 CHANNELIZING LINE, 12" | 2,985 FT | $2.00 | $2.00 | $2.00 |
| 644E00500 STOP LINE | 114 FT | $7.00 | $7.00 | $7.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 180 FT | $7.00 | $7.00 | $7.00 |
| 644E00720 CHEVRON MARKING | 32 FT | $7.00 | $7.00 | $7.00 |
| 644E01300 LANE ARROW | 26 EACH | $115 | $115 | $115 |
| 644E01510 DOTTED LINE, 6" | 1,712 FT | $1.30 | $1.30 | $1.30 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 4 EACH | $50.00 | $50.00 | $50.00 |
| 645E00500 STOP LINE, TYPE A1 | 24 FT | $10.00 | $10.00 | $10.00 |
| 645E30000 REMOVAL OF PAVEMENT MARKINGS | 2,056 FT | $0.50 | $0.50 | $0.50 |
| 645E30010 REMOVAL OF PAVEMENT MARKINGS | 6 EACH | $40.00 | $40.00 | $40.00 |
| 645E90000 PAVEMENT MARKING, MISC.CENTER LINE, SOLID, DOUBLE, | 0.06 MILE | $48,000 | $48,000 | $48,000 |
| 645E90000 PAVEMENT MARKING, MISC.EDGE LINE, WHITE, GROOVED, | 0.13 MILE | $24,000 | $24,000 | $24,000 |
| 645E90000 PAVEMENT MARKING, MISC.LANE LINE, GROOVED, WITH CO | 0.13 MILE | $9,500 | $9,500 | $9,500 |
| 645E98000 PAVEMENT MARKING, MISC.CHANNELIZING LINE, GROOVED, | 450 FT | $10.00 | $10.00 | $10.00 |
| 646E10400 STOP LINE | 36 FT | $10.00 | $10.00 | $10.00 |
| 647E50100 PAVEMENT MARKING, MISC.:LANE ARROW, TYPE B90, WITH | 8 EACH | $240 | $240 | $240 |
| 807E12010 WET REFLECTIVE EPOXY PAVEMENT MARKING, EDGE LINE, | 0.8 MILE | $4,500 | $4,500 | $4,500 |
| 807E12110 WET REFLECTIVE EPOXY PAVEMENT MARKING, LANE LINE, | 0.47 MILE | $1,850 | $1,850 | $1,850 |
| 807E12310 WET REFLECTIVE EPOXY PAVEMENT MARKING, CHANNELIZIN | 1,341 FT | $2.50 | $2.50 | $2.50 |
| 807E12410 WET REFLECTIVE EPOXY PAVEMENT MARKING, DOTTED LINE | 809 FT | $1.00 | $1.00 | $1.00 |
| 807E13010 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN | 0.9 MILE | $2,900 | $2,900 | $2,900 |
| 807E13110 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN | 0.9 MILE | $1,450 | $1,450 | $1,450 |
| 807E13310 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN | 1,486 FT | $1.65 | $1.65 | $1.65 |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $1,300 | $1,300 | $1,300 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $0.40 | $0.40 | $0.40 |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,500 | $2,500 | $2,500 |
| 850E20130 GROOVING FOR 12" RECESSED PAVEMENT MARKING Section 6 - TRAFFIC CONTROL - Totals Awd $313,778.22 2 $304,446.25 3 $301,808.28 | — | $1.00 | $1.00 | $1.00 |
| 625E23001 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE, AS PER PLAN | 1,981 FT | $4.00 | $4.00 | $4.24 |
| 625E25304 CONDUIT, 1-1/2", 725.051 | 169 FT | $9.00 | $9.00 | $5.42 |
| 625E25408 CONDUIT, 2", 725.051 | 358 FT | $9.00 | $9.00 | $6.16 |
| 625E25504 CONDUIT, 3", 725.051 | 18 FT | $11.50 | $11.50 | $10.43 |
| 625E25802 CONDUIT, CONCRETE ENCASED 2" | 786 FT | $29.00 | $25.00 | $26.39 |
| 625E25802 CONDUIT, CONCRETE ENCASED 3" | 338 FT | $30.00 | $30.00 | $30.98 |
| 625E25920 CONDUIT, MISC.:1.5", BORED, (EPEC-80-HDPE) | 139 FT | $18.00 | $18.00 | $44.11 |
| 625E25920 CONDUIT, MISC.:3", BORED, (EPEC-80-HDPE) | 278 FT | $20.00 | $20.00 | $47.50 |
| 625E29000 TRENCH | 1,035 FT | $9.00 | $9.00 | $8.72 |
| 625E31511 PULL BOX REMOVED, AS PER PLAN | 7 EACH | $240 | $240 | $934 |
| 625E31600 PULL BOX, MISC.: 725.06, (12"X18") | 6 EACH | $825 | $825 | $774 |
| 625E31600 PULL BOX, MISC.:725.08, 27" | 2 EACH | $2,550 | $2,550 | $2,597 |
| 625E31600 PULL BOX, MISC.:725.08, 32" | 2 EACH | $2,950 | $2,950 | $3,680 |
| 625E32000 GROUND ROD | 5 EACH | $325 | $325 | $282 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 1 EACH | $685 | $650 | $524 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 9 SF | $36.00 | $45.00 | $58.33 |
| 630E97700 SIGNING, MISC.:TRAFFIC SIGNAL SIGNS | 1 EACH | $500 | $7,500 | $1,167 |
| 632E03201 VEHICULAR SIGNAL HEAD, OPTICALLY PROGRAMMED, 3-SEC | 4 EACH | $5,900 | $5,000 | $8,117 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 2 EACH | $1,200 | $1,200 | $1,831 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 6 EACH | $40.00 | $40.00 | $78.19 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 831 FT | $3.25 | $3.25 | $4.12 |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 1 EACH | $11,250 | $11,250 | $5,759 |
| 632E64020 PEDESTAL FOUNDATION | 1 EACH | $1,600 | $1,600 | $1,048 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 39 FT | $7.50 | $7.50 | $6.93 |
| 632E69350 POWER CABLE, MISC.:2 CONDUCTOR, 1 / 0 AWG | 1,047 FT | $11.00 | $11.00 | $13.96 |
| 632E69350 POWER CABLE, MISC.:3 CONDUCTOR, 1 / 0 AWG | 54 FT | $16.00 | $16.00 | $24.34 |
| 632E69350 POWER CABLE, MISC.:REMOVE EXISTING POWER CABLES | 3,000 FT | $0.60 | $0.60 | $0.74 |
| 632E70001 POWER SERVICE, AS PER PLAN | 2 EACH | $850 | $850 | $764 |
| 632E80700 SIGNAL SUPPORT, MISC.:SIGNAL SUPPORT, (4120), DESI | 1 EACH | $33,000 | $30,000 | $31,834 |
| 632E90010 PEDESTAL, MISC.:21' TRANSFORMER BASE | 1 EACH | $4,500 | $4,500 | $5,067 |
| 632E90400 SIGNALIZATION, MISC.:DILEMMA ZONE RADAR DETECTION | 1 EACH | $19,000 | $19,000 | $24,312 |
| 632E90400 SIGNALIZATION, MISC.:POWER METER CABINET (TYPE I O | 1 EACH | $6,600 | $6,600 | $5,929 |
| 632E90400 SIGNALIZATION, MISC.:STOP LINE RADAR DETECTION SYS | 1 EACH | $9,350 | $9,350 | $12,233 |
| 632E90400 SIGNALIZATION, MISC.:VEHICULAR SIGNAL HEAD, RELOCA | 2 EACH | $295 | $295 | $365 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $3,500 | $3,500 | $1,854 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $1,325 | $1,325 | $687 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $9,740 | $9,740 | $12,415 |
| 633E99000 CONTROLLER ITEM, MISC.:CONTROLLER MODIFICATION | 1 EACH | $1,000 | $1,000 | $757 |
| 633E99000 CONTROLLER ITEM, MISC.:CONTROLLER UNIT TS2/A2, W/P | 1 EACH | $28,000 | $28,000 | $34,238 |
| 633E99000 CONTROLLER ITEM, MISC.:FIBER OPTIC ETHERNET TRANSC | 2 EACH | $1,650 | $1,650 | $2,397 |
| 633E99000 CONTROLLER ITEM, MISC.:LAYER 2 ETHERNET SWITCH | 1 EACH | $3,300 | $3,300 | $5,829 |
| 804E98100 FIBER OPTIC CABLE, MISC.:FIBER OPTIC CABLE FUSION | 24 EACH | $27.00 | $27.00 | $27.00 |
| 804E98100 FIBER OPTIC CABLE, MISC.:REUSE OF EXISTING FIBER O | 1 EACH | $1,250 | $1,250 | $1,250 |
| 804E98100 FIBER OPTIC CABLE, MISC.:TERMINATION PANEL, 24 FIB | 1 EACH | $2,500 | $2,506 | $2,927 |
| 809E70000 MAINTAINING ITS DURING CONSTRUCTION, AS PER PLAN Section 7 - TRAFFIC SIGNALS - Totals Awd $272,791.25 2 $270,098.90 3 $315,924.52 | 1 LS | $3,275 | $3,275 | $5,000 |
| 606E60022 IMPACT ATTENUATOR, TYPE 2 (UNIDIRECTIONAL), 65 MPH | 1 EACH | $9,875 | $14,926 | $43,750 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 250 HOUR | $125 | $104 | $120 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,600 FT | $1.75 | $0.75 | $1.92 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,380 | $2,100 | $2,074 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 530 EACH | $40.00 | $42.00 | $26.68 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 170 EACH | $6.50 | $10.00 | $9.38 |
| 614E13350 OBJECT MARKER, ONE WAY | 170 EACH | $18.75 | $16.00 | $20.52 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $1,000 | $650 | $1,093 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 1.31 MILE | $1,050 | $610 | $1,050 |
| 614E20210 WORK ZONE LANE LINE, CLASS I, 6", 740.06, TYPE I | 0.14 MILE | $6,805 | $6,685 | $6,804 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 1.81 MILE | $995 | $525 | $995 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.04 MILE | $1,221 | $2,300 | $1,221 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.16 MILE | $1,170 | $1,530 | $1,170 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 3.96 MILE | $910 | $1,335 | $910 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.45 MILE | $12,817 | $12,150 | $12,817 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 2.01 MILE | $900 | $990 | $900 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 5,085 FT | $0.50 | $0.80 | $0.50 |
| 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06, | 2,110 FT | $2.90 | $2.60 | $2.91 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 4,638 FT | $0.50 | $0.65 | $0.50 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 1,077 FT | $0.30 | $0.45 | $0.30 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 1,712 FT | $0.30 | $0.40 | $0.30 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 24 FT | $8.00 | $2.90 | $8.00 |
| 614E30000 WORK ZONE ARROW, CLASS I | 2 EACH | $100 | $135 | $100 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $40,000 | $61,000 | $45,000 |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 124 SY | $165 | $63.00 | $139 |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 185 SY | $290 | $125 | $290 |
| 616E10000 WATER | 12 MGAL | $98.00 | $90.00 | $36.00 |
| 622E41060 DUAL PORTABLE BARRIER TRANSITION/TERMINATION | 1 EACH | $4,300 | $14,926 | $4,457 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $30,000 | $32,371 | $70,000 |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $2,500 | $4,050 | $3,800 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →