Project scope

Bid form · ODOT

96ITEMS
  • Earthwork14%
  • Drainage14%
  • Signals & Lighting11%
  • Structures / Bridge9%
  • Erosion & Landscaping8%
  • Mobilization & General5%
  • Other39%

Top items by winning bid

ItemQtyUnit priceExtended%
203E20000 EMBANKMENT47,721 CY$12.75$608k20%
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)2,979 CY$146.5$436k14%
304E20000 AGGREGATE BASE3,499 CY$68$238k8%
442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE1,241 CY$176$218k7%
442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (745 CY$251.5$187k6%
624E10000 MOBILIZATION Section 10 - INCIDENTALS - Totals Awd $292,100.28 2 $205,608.00 3 $268,300.00 4 $172,739.871 LS$154,000$154k5%
605E14000 6" BASE PIPE UNDERDRAINS9,554 FT$12$115k4%
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$85,000$85k3%
625E15700 LIGHT TOWER FOUNDATION, MISC.: 36" X 10' DEEP11 EACH$6,090$67k2%
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)414 CY$155.5$64k2%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 76 more items below.

Rank 1Shelly & Sands INC$3.08MRank 2Allard Excavation LLC$3.20MRank 3Complete General Construction Company$3.55MRank 4Boss Excavating & Grading INC$3.82M
ItemQuantityR1Shelly & Sands INCR2Allard Excavation LLCR3Complete General Construction CompanyR4Boss Excavating & Grading INC
203E20000 EMBANKMENT47,721 CY$12.75$19.00$22.00$28.03
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)2,979 CY$147$154$154$181
304E20000 AGGREGATE BASE3,499 CY$68.00$68.00$72.00$51.19
442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE1,241 CY$176$200$200$233
442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (745 CY$252$213$213$248
624E10000 MOBILIZATION Section 10 - INCIDENTALS - Totals Awd $292,100.28 2 $205,608.00 3 $268,300.00 4 $172,739.871 LS$154,000$70,000$177,000$70,000
605E14000 6" BASE PIPE UNDERDRAINS9,554 FT$12.00$10.00$11.00$12.31
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$85,000$56,438$32,500$30,554
625E15700 LIGHT TOWER FOUNDATION, MISC.: 36" X 10' DEEP11 EACH$6,090$6,090$7,900$6,828
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)414 CY$156$188$188$216
609E28000 CURB, TYPE 7 Section 4 - PAVEMENT - Totals Awd $436,144.00 2 $439,282.00 3 $482,953.00 4 $422,596.321,825 FT$33.00$18.00$35.00$28.03
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $105,378.80 2 $101,131.80 3 $111,529.80 4 $105,890.7260,000 EACH$1.00$1.00$1.00$1.00
878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER Section 1 - ROADWAY - Totals Awd $882,849.75 2 $1,114,654.00 3 $1,298,935.25 4 $1,541,206.101 LS$49,000$66,864$80,000$20,183
201E11001 CLEARING AND GRUBBING, AS PER PLAN1 LS$48,000$3,507$7,500$4,986
625E25400 CONDUIT, 2", 725.042,209 FT$20.81$20.81$24.00$23.33
204E10000 SUBGRADE COMPACTION21,379 SY$2.00$1.00$1.75$1.09
202E23000 PAVEMENT REMOVED3,355 SY$10.00$4.00$9.00$9.19
442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE170 CY$195$303$303$353
203E10000 EXCAVATION3,279 CY$10.00$14.00$12.00$20.00
442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (102 CY$290$285$285$331
Show all 96 line items
ItemQuantityR1Shelly & Sands INCR2Allard Excavation LLCR3Complete General Construction CompanyR4Boss Excavating & Grading INC
202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER109 FT$27.00$2.00$24.00$25.50
202E38000 GUARDRAIL REMOVED25 FT$17.00$4.00$18.00$14.53
202E75000 FENCE REMOVED1,210 FT$3.50$2.00$4.00$5.37
204E13000 EXCAVATION OF SUBGRADE100 CY$38.00$20.00$44.00$8.89
204E30020 GRANULAR MATERIAL, TYPE C100 CY$85.00$68.00$79.00$70.85
204E45000 PROOF ROLLING8 HOUR$1,350$244$360$277
204E50000 GEOTEXTILE FABRIC500 SY$1.25$1.00$2.00$1.77
607E98000 FENCE, MISC.:WOODEN SLAT FENCE47 FT$193$193$193$112
623E39500 MONUMENT ASSEMBLY ADJUSTED TO GRADE6 EACH$1,700$754$350$561
623E40000 MONUMENT ASSEMBLY REMOVED AND RESET2 EACH$2,275$1,641$1,300$561
623E40500 REFERENCE MONUMENT, TYPE A6 EACH$550$1,202$1,250$1,121
623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R1 LS$3,000$7,000$2,700$11,213
623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND1 LS$3,000$7,000$2,700$4,373
690E50600 SPECIAL - BOLLARD4 EACH$965$1,200$965$1,480
601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT6 SY$110$135$170$146
601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA71 CY$130$79.00$135$110
659E00100 SOIL ANALYSIS TEST2 EACH$150$300$150$224
659E00300 TOPSOIL553 CY$20.00$28.00$32.00$8.58
659E10000 SEEDING AND MULCHING4,922 SY$0.80$0.80$0.80$1.85
659E14000 REPAIR SEEDING AND MULCHING247 SY$0.80$0.80$0.80$1.12
659E15000 INTER-SEEDING247 SY$0.80$0.80$0.80$0.01
659E20000 COMMERCIAL FERTILIZER1.11 TON$1,250$1,250$1,250$1,682
659E31000 LIME1.02 ACRE$150$150$150$224
659E35000 WATER28 MGAL$1.00$1.00$1.00$1.12
670E00500 SLOPE EROSION PROTECTION51 SY$2.50$2.50$2.50$2.63
832E15000 STORM WATER POLLUTION PREVENTION PLAN1 LS$1,600$1,500$1,500$4,485
832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS1 LS$6,500$6,000$6,000$5,382
832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA1 LS$10,000$5,100$9,400$10,511
602E20000 CONCRETE MASONRY0.3 CY$4,400$7,906$4,750$3,442
611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS86 FT$32.00$33.00$28.00$22.10
611E04400 12" CONDUIT, TYPE B, 707.334 FT$500$76.00$230$165
611E04600 12" CONDUIT, TYPE C161 FT$79.00$63.00$93.00$49.42
611E05900 15" CONDUIT, TYPE B150 FT$96.00$89.00$120$67.75
611E05900 15" CONDUIT, TYPE B, 707.334 FT$506$94.00$235$194
611E07400 18" CONDUIT, TYPE B257 FT$96.00$116$140$72.74
611E98470 CATCH BASIN, NO. 2-2B1 EACH$3,530$4,443$3,570$1,912
611E98504 CATCH BASIN, NO. 2-2C1 EACH$3,850$4,392$3,760$1,912
611E99574 MANHOLE, NO. 32 EACH$4,300$5,216$5,230$3,218
611E99710 PRECAST REINFORCED CONCRETE OUTLET Section 3 - DRAINAGE - Totals Awd $192,360.00 2 $175,096.80 3 $198,730.00 4 $170,383.883 EACH$615$365$400$443
407E20000 NON-TRACKING TACK COAT280 GAL$3.50$4.10$4.10$4.60
441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449)$550$615$615$690
452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P30 SY$220$175$130$118
625E00450 CONNECTION, FUSED PULL APART8 EACH$166$166$145$186
625E10503 LIGHT POLE (INSTALLATION ONLY), AS PER PLAN(CONVEN4 EACH$690$690$500$774
625E10503 LIGHT POLE (INSTALLATION ONLY), AS PER PLAN(LIGHT11 EACH$1,205$1,205$1,000$1,351
625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP4 EACH$2,272$2,272$3,700$2,547
625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE7,167 FT$4.01$4.01$3.40$4.50
625E23400 NO. 10 AWG POLE AND BRACKET CABLE576 FT$5.31$5.31$2.50$5.95
625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER4 EACH$604$604$475$677
625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL11 EACH$1,540$1,540$1,050$1,727
625E29002 TRENCH, 24" DEEP2,209 FT$8.76$8.76$9.00$9.86
625E30700 PULL BOX, 725.08, 18"2 EACH$1,342$1,342$1,375$1,505
625E32000 GROUND ROD15 EACH$436$436$325$489
625E34001 POWER SERVICE, AS PER PLAN1 EACH$11,376$11,376$9,500$12,755
625E36010 UNDERGROUND WARNING MARKING TAPE2,209 FT$0.25$0.10$1.50$0.11
625E76000 ARC FLASH CALCULATIONS AND LABEL, ROS-US35/US50 IN Section 5 - LIGHTING - Totals Awd $234,702.61 2 $234,371.26 3 $252,078.30 4 $262,886.191 EACH$3,655$3,655$3,625$4,098
630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST143.5 FT$17.00$17.00$17.00$29.15
630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22100.9 FT$73.00$73.00$73.00$118
630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X1299.1 FT$58.00$58.00$58.00$78.49
630E08600 SIGN POST REFLECTOR1 EACH$50.00$50.00$50.00$151
630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION4 EACH$880$880$880$1,682
630E80100 SIGN, FLAT SHEET69.9 SF$20.00$20.00$20.00$40.37
630E80200 SIGN, GROUND MOUNTED EXTRUSHEET372 SF$27.00$27.00$27.00$51.58
630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION8 EACH$1,050$1,050$1,050$3,140
630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL2 EACH$15.00$12.00$15.00$95.31
630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA Section 6 - TRAFFIC CONTROL - Totals Awd $39,045.00 2 $39,013.00 3 $39,045.00 4 $78,226.182 EACH$25.00$12.00$25.00$95.31
410E10000 TRAFFIC COMPACTED SURFACE, TYPE A25 CY$135$68.00$150$45.68
616E10000 WATER Section 7 - MAINTENANCE OF TRAFFIC - Totals Awd $13,475.00 2 $1,801.00 3 $12,840.00 4 $1,251.08101 MGAL$100$1.00$90.00$1.08
407E20000 NON-TRACKING TACK COAT1,980 GAL$3.50$4.10$4.10$4.60
644E00300 CENTER LINE0.14 MILE$12,000$5,300$5,300$13,455
644E00500 STOP LINE32 FT$9.00$5.50$5.50$16.82
644E00700 TRANSVERSE/DIAGONAL LINE5,050 FT$5.50$1.00$1.00$5.77
644E01200 PARKING LOT STALL MARKING Section 8 - ITEMS OF WORK OPTION A: FLEXIBLE - Totals Awd $888,244.00 2 $884,419.00 3 $884,419.00 4 $1,064,630.474,682 FT$2.00$1.00$1.00$2.24
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$18,891$22,000$23,000$42,608
614E11000 MAINTAINING TRAFFIC1 LS$15,009$46,610$25,000$5,333
619E16000 FIELD OFFICE, TYPE A6 MNTH$3,200$1,760$1,800$4,041

Project details

Description
ROS-US 35/US 50 Interchange TP
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →