Skip to content
Figure 0.1 · BRIEFING
BID #260138 · ODOTRESULT · awarded Mar 12

D05-PM FY2026 (B) Fast Dry West

D05 County · est $1.8M

Bid dateThursday, March 12
Awarded toDALTONS INC$1,327.74
read → connected → answeredcassandri

Project scope

Bid form · ODOT

21ITEMS
  • Pavement Marking38%
  • Maintaining Traffic24%
  • Mobilization & General10%
  • Other29%

Top items by winning bid

ItemQtyUnit priceExtended%
642E00404 CHANNELIZING LINE, 12", TYPE 147,576 FT$0.01$47636%
642E01510 DOTTED LINE, 6", TYPE 137,428 FT$0.01$37428%
642E00400 CHANNELIZING LINE, 8", TYPE 128,299 FT$0.01$28321%
642E00620 CROSSWALK LINE, 12", TYPE 110,783 FT$0.01$1088%
642E00500 STOP LINE, TYPE 15,595 FT$0.01$564%
642E00104 EDGE LINE, 6", TYPE 11,301.48 MILE$0.01$131%
642E00300 CENTER LINE, TYPE 1572.66 MILE$0.01$60%
642E01300 LANE ARROW, TYPE 1383 EACH$0.01$40%
642E20802 YIELD LINE, TYPE 1333 FT$0.01$30%
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST Section 2 - MAINTENANCE OF TRAFFIC - Totals Awd $150.00 2 $1.50 3 $15,000.00 4 $11,250.00150 HOUR$0.01$20%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 1 more items below.

Rank 1Daltons INC$1kRank 2The Aero-mark Company LLC$1.30MRank 3Oglesby Construction INC$1.40MRank 4Alpha Space Control LLC$1.63M
ItemQuantityR1Daltons INCR2The Aero-mark Company LLCR3Oglesby Construction INCR4Alpha Space Control LLC
642E00404 CHANNELIZING LINE, 12", TYPE 147,576 FT$0.01$0.40$0.40$0.55
642E01510 DOTTED LINE, 6", TYPE 137,428 FT$0.01$0.60$0.48$0.45
642E00400 CHANNELIZING LINE, 8", TYPE 128,299 FT$0.01$0.35$0.35$0.49
642E00620 CROSSWALK LINE, 12", TYPE 110,783 FT$0.01$2.42$1.40$3.85
642E00500 STOP LINE, TYPE 15,595 FT$0.01$3.60$2.95$5.85
642E00104 EDGE LINE, 6", TYPE 11,301.48 MILE$0.01$584$618$731
642E00300 CENTER LINE, TYPE 1572.66 MILE$0.01$590$635$560
642E01300 LANE ARROW, TYPE 1383 EACH$0.01$40.00$42.00$62.50
642E20802 YIELD LINE, TYPE 1333 FT$0.01$1.00$3.00$18.50
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST Section 2 - MAINTENANCE OF TRAFFIC - Totals Awd $150.00 2 $1.50 3 $15,000.00 4 $11,250.00150 HOUR$0.01$1.00$100$75.00
642E00204 LANE LINE, 6", TYPE 1139.37 MILE$0.01$300$285$430
642E01410 WORD ON PAVEMENT, 96", TYPE 1 (ONLY)127 EACH$0.01$50.00$75.00$75.00
642E01000 RAILROAD SYMBOL MARKING, TYPE 124 EACH$0.01$225$310$365
642E01110 SCHOOL SYMBOL MARKING, 96", TYPE 124 EACH$0.01$225$210$315
642E40001 SPEED MEASUREMENT MARKING, AS PER PLAN Section 1 - TRAFFIC CONTROL - Totals Awd $1,276,076.43 2 $1,326.21 3 $1,336,536.13 4 $1,534,454.1012 EACH$0.01$250$700$750
642E01312 LANE REDUCTION ARROW, TYPE 110 EACH$0.01$150$175$395
642E01322 WRONG WAY ARROW, TYPE 110 EACH$0.01$100$80.00$195
642E01410 WORD ON PAVEMENT, 96", TYPE 1 (MERGE)4 EACH$0.01$100$80.00$100
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$0.01$5,774$7,000$25,000
614E11000 MAINTAINING TRAFFIC1 LS$0.01$5,000$21,000$5,500
Show all 21 line items
ItemQuantityR1Daltons INCR2The Aero-mark Company LLCR3Oglesby Construction INCR4Alpha Space Control LLC
624E10000 MOBILIZATION Section 3 - INCIDENTALS - Totals Awd $23,773.57 2 $0.03 3 $47,500.00 4 $83,000.001 LS$0.01$13,000$19,500$52,500

Project details

Description
D05-PM FY2026 (B) Fast Dry West
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →