Skip to content
Figure 0.1 · BRIEFING
BID #260128 · ODOTRESULT · awarded Mar 12

MOE-CR 81-01.07

MOE County · est $0.2M

Bid dateThursday, March 12
Awarded toSHELLY & SANDS INC$152,196
read → connected → answeredcassandri

Project scope

Bid form · ODOT

8ITEMS
  • Maintaining Traffic38%
  • Mobilization & General25%
  • Asphalt Paving13%
  • Structures / Bridge13%
  • Aggregate & Base13%

Top items by winning bid

ItemQtyUnit priceExtended%
441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG485 CY$231$112k74%
624E10000 MOBILIZATION Section 3 - INCIDENTALS - Totals Awd $25,302.00 2 $35,000.001 LS$12,602$13k8%
614E11000 MAINTAINING TRAFFIC1 LS$9,500$10k6%
617E10100 COMPACTED AGGREGATE Section 1 - PAVEMENT - Totals Awd $125,152.50 2 $131,200.5053 CY$174$9k6%
407E20000 NON-TRACKING TACK COAT1,113 GAL$3.5$4k3%
623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P1 LS$2,000$2k1%
642E00300 CENTER LINE, TYPE 1 Section 2 - TRAFFIC CONTROL - Totals Awd $1,741.50 2 $2,580.001.29 MILE$1,350$2k1%
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$1,200$1k1%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 8items by winning bid’s extended amount.

Rank 1Shelly & Sands INC$152kRank 2Nls Paving, INC$169k
ItemQuantityR1Shelly & Sands INCR2Nls Paving, INC
441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG485 CY$231$245
624E10000 MOBILIZATION Section 3 - INCIDENTALS - Totals Awd $25,302.00 2 $35,000.001 LS$12,602$20,000
614E11000 MAINTAINING TRAFFIC1 LS$9,500$12,500
617E10100 COMPACTED AGGREGATE Section 1 - PAVEMENT - Totals Awd $125,152.50 2 $131,200.5053 CY$174$160
407E20000 NON-TRACKING TACK COAT1,113 GAL$3.50$3.50
623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P1 LS$2,000$1,500
642E00300 CENTER LINE, TYPE 1 Section 2 - TRAFFIC CONTROL - Totals Awd $1,741.50 2 $2,580.001.29 MILE$1,350$2,000
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$1,200$1,000

Project details

Description
MOE-CR 81-01.07
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →