GEA-SR 528-14.52
GEA County · est $0.5M
Bid dateThursday, March 12—
Awarded toRONYAK PAVING INC$399,832
GEA County · est $0.5M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E14000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (771 CY | $215 | $166k | 41% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 1" Section 4 - PAVEMENT - Totals Awd $276,245.50 2 $305,853.00 3 $288,984.45 4 $363,192.00 | 27,735 SY | $1.5 | $42k | 10% |
| 253E02000 PAVEMENT REPAIR | 75 CY | $375 | $28k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $23,000 | $23k | 6% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $59,274.80 2 $88,800.00 3 $110,600.00 4 $76,200.00 | 1 LS | $21,345 | $21k | 5% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 325 SY | $65 | $21k | 5% |
| 646E10010 EDGE LINE, 6" | 3.94 MILE | $3,310 | $13k | 3% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 55 CY | $200 | $11k | 3% |
| 646E10200 CENTER LINE | 1.97 MILE | $4,675 | $9k | 2% |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $1,500 | $9k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 17 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Phillips Paving LLC | R3Karvo Companies INC | R4Barbicas Construction Company INC | % of bid |
|---|---|---|---|---|---|---|
| 424E14000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (771 CY | $215 | $230 | $248 | $300 | 43% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 1" Section 4 - PAVEMENT - Totals Awd $276,245.50 2 $305,853.00 3 $288,984.45 4 $363,192.00 | 27,735 SY | $1.50 | $2.00 | $1.45 | $3.00 | 11% |
| 253E02000 PAVEMENT REPAIR | 75 CY | $375 | $500 | $315 | $220 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $23,000 | $45,000 | $33,000 | $15,000 | 6% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $59,274.80 2 $88,800.00 3 $110,600.00 4 $76,200.00 | 1 LS | $21,345 | $27,300 | $54,000 | $50,000 | 6% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 325 SY | $65.00 | $50.00 | $48.00 | $30.00 | 5% |
| 646E10010 EDGE LINE, 6" | 3.94 MILE | $3,310 | $3,310 | $3,310 | $3,310 | 3% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 55 CY | $200 | $175 | $150 | $200 | 3% |
| 646E10200 CENTER LINE | 1.97 MILE | $4,675 | $4,675 | $4,675 | $4,675 | 2% |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $1,500 | $1,000 | $2,300 | $1,000 | 2% |
| 621E00100 RPM | 147 EACH | $55.10 | $55.10 | $55.10 | $55.00 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $95.00 | $100 | $125 | $80.00 | 2% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $850 | $1,200 | $850 | $800 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 2,359 GAL | $2.00 | $2.00 | $2.30 | $3.00 | 1% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 1,730 LB | $2.00 | $2.00 | $2.00 | $2.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,350 | $10,000 | $5,000 | $5,000 | 1% |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $26,865.85 2 $29,165.85 3 $30,065.85 4 $28,195.85 | 300 SF | $10.00 | $10.00 | $10.00 | $10.00 | 1% |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 3.94 MILE | $675 | $675 | $675 | $675 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $2,580 | $500 | $4,800 | $200 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 3.94 MILE | $635 | $635 | $635 | $635 | 1% |
| Item | Quantity | R1Ronyak Paving INC | R2Phillips Paving LLC | R3Karvo Companies INC | R4Barbicas Construction Company INC |
|---|---|---|---|---|---|
| 209E60201 LINEAR GRADING, AS PER PLAN | 192 STA | $6.00 | $10.00 | $32.00 | $30.00 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN Section 1 - ROADWAY - Totals Awd $2,902.00 2 $3,920.00 3 $7,794.00 4 $5,761.00 | 1 EACH | $1,750 | $2,000 | $1,650 | $1.00 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $1,000.00 2 $1,000.00 3 $1,000.00 4 $1,000.00 | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL Section 3 - DRAINAGE - Totals Awd $750.00 2 $2,000.00 3 $1,625.00 4 $1,000.00 | 500 LB | $1.50 | $4.00 | $3.25 | $2.00 |
| 304E20000 AGGREGATE BASE | 15 CY | $30.00 | $100 | $80.00 | $60.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 103 EACH | $1.00 | $1.00 | $5.75 | $6.00 |
| 646E10400 STOP LINE | 23 FT | $14.00 | $14.00 | $14.00 | $14.00 |
| 646E10510 CROSSWALK LINE, 12" | 74 FT | $7.00 | $7.00 | $7.00 | $7.00 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS Section 5 - TRAFFIC CONTROL - Totals Awd $32,793.85 2 $32,793.85 3 $33,283.10 4 $33,294.15 | 1 LS | $1,500 | $1,500 | $1,500 | $1,500 |
| 614E12460 WORK ZONE MARKING SIGN | 6 EACH | $70.00 | $70.00 | $70.00 | $75.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $60.00 | $50.00 | $100 | $200 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 1.97 MILE | $1,035 | $1,035 | $1,035 | $1,035 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.97 MILE | $985 | $985 | $985 | $985 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 23 FT | $3.35 | $3.35 | $3.35 | $3.35 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 23 FT | $3.00 | $3.00 | $3.00 | $3.00 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 74 FT | $1.85 | $1.85 | $1.85 | $1.85 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 74 FT | $1.65 | $1.65 | $1.65 | $1.65 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →