Figure 0.1 · BRIEFING
BID #260091 · ODOTRESULT · awarded Feb 19

MOT-Westbrook RSF 03.11

MOT County · est $0.4M

Bid dateThursday, February 19
Awarded toBARRETT PAVING MATERIALS INC$294,670
read → connected → answeredcassandri

Project scope

Bid form · ODOT

23ITEMS
  • Maintaining Traffic39%
  • Pavement Marking17%
  • Drainage9%
  • Asphalt Paving9%
  • Mobilization & General9%
  • Removal & Demolition4%
  • Other13%

Top items by winning bid

ItemQtyUnit priceExtended%
442E22050 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE B (4 Section 2 - PAVEMENT - Totals Awd $214,136.25 2 $310,130.50584 CY$240$140k48%
253E01000 PAVEMENT REPAIR280 SY$145$41k14%
254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 114,015 SY$1.95$27k9%
614E11000 MAINTAINING TRAFFIC1 LS$18,000$18k6%
624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $38,197.00 2 $25,500.001 LS$17,000$17k6%
611E99654 MANHOLE ADJUSTED TO GRADE Section 1 - DRAINAGE - Totals Awd $16,700.00 2 $42,250.0018 EACH$800$14k5%
638E10800 VALVE BOX ADJUSTED TO GRADE Section 3 - WATER WORK - Totals Awd $10,500.00 2 $38,500.0035 EACH$300$11k4%
644E00300 CENTER LINE0.53 MILE$8,825$5k2%
254E01600 PATCHING PLANED SURFACE705 SY$5$4k1%
644E00630 CROSSWALK LINE, 24" Section 4 - TRAFFIC CONTROL - Totals Awd $10,156.45 2 $10,168.45300 FT$9.06$3k1%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 3 more items below.

Rank 1Barrett Paving Materials INC$295kRank 2Walls Bros Asphalt CO INC$432k
ItemQuantityR1Barrett Paving Materials INCR2Walls Bros Asphalt CO INC
442E22050 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE B (4 Section 2 - PAVEMENT - Totals Awd $214,136.25 2 $310,130.50584 CY$240$330
253E01000 PAVEMENT REPAIR280 SY$145$252
254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 114,015 SY$1.95$2.30
614E11000 MAINTAINING TRAFFIC1 LS$18,000$12,000
624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $38,197.00 2 $25,500.001 LS$17,000$10,000
611E99654 MANHOLE ADJUSTED TO GRADE Section 1 - DRAINAGE - Totals Awd $16,700.00 2 $42,250.0018 EACH$800$2,200
638E10800 VALVE BOX ADJUSTED TO GRADE Section 3 - WATER WORK - Totals Awd $10,500.00 2 $38,500.0035 EACH$300$1,100
644E00300 CENTER LINE0.53 MILE$8,825$8,825
254E01600 PATCHING PLANED SURFACE705 SY$5.00$10.00
644E00630 CROSSWALK LINE, 24" Section 4 - TRAFFIC CONTROL - Totals Awd $10,156.45 2 $10,168.45300 FT$9.06$9.10
407E20000 NON-TRACKING TACK COAT, 0.09 GAL/SY1,261 GAL$2.00$6.00
611E98630 CATCH BASIN ADJUSTED TO GRADE1 EACH$2,300$2,650
623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P1 LS$2,000$2,000
614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT0.53 MILE$3,600$3,600
614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT0.53 MILE$3,600$3,600
644E00620 CROSSWALK LINE, 12"342 FT$5.00$5.00
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$1,197$1,500
644E00500 STOP LINE69 FT$10.00$10.00
614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT69 FT$6.35$6.35
614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT Section 5 - MAINTENANCE OF TRAFFIC - Totals Awd $4,980.30 2 $4,980.3069 FT$6.35$6.35
Show all 23 line items
ItemQuantityR1Barrett Paving Materials INCR2Walls Bros Asphalt CO INC
644E00100 EDGE LINE, 4"0.06 MILE$6,020$6,020
614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT0.06 MILE$2,400$2,400
614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT0.06 MILE$2,400$2,400

Project details

Description
MOT-Westbrook RSF 03.11
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →