MOT-Trotwood Olive Rd Walks SA22
MOT County · est $0.9M
Bid dateThursday, February 19—
Awarded toPerformance Site Development$828,510.81
MOT County · est $0.9M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 7,940 SF | $8.85 | $70k | 8% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $44,150 | $44k | 5% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $10,308 | $41k | 5% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 36 CY | $1,088 | $39k | 5% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $76,013.50 2 $61,585.00 3 $78,065.50 4 $57,055.00 5 $58,500.25 | 30,000 EACH | $1 | $30k | 4% |
| 608E52000 CURB RAMP | 1,195 SF | $22.25 | $27k | 3% |
| 659E00300 TOPSOIL | 360 CY | $68.3 | $25k | 3% |
| 609E26000 CURB, TYPE 6 Section 4 - PAVEMENT - Totals Awd $134,260.10 2 $116,643.00 3 $129,907.35 4 $184,745.00 5 $175,415.00 | 590 FT | $39 | $23k | 3% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 2 EACH | $10,734 | $21k | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $19,995 | $20k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 90 more items below.
| Item | Quantity | R1Performance Site Development | R2Brumbaugh Construction INC | R3Double Jay Construction INC | R4Perram Electric INC | R5Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 7,940 SF | $8.85 | $9.00 | $7.85 | $8.00 | $12.30 | 14% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $44,150 | $46,000 | $45,550 | $32,500 | $50,000 | 9% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $10,308 | $10,300 | $10,415 | $10,075 | $9,000 | 8% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 36 CY | $1,088 | $532 | $557 | $975 | $975 | 8% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $76,013.50 2 $61,585.00 3 $78,065.50 4 $57,055.00 5 $58,500.25 | 30,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 6% |
| 608E52000 CURB RAMP | 1,195 SF | $22.25 | $23.00 | $18.00 | $26.00 | $13.50 | 5% |
| 659E00300 TOPSOIL | 360 CY | $68.30 | $60.00 | $71.50 | $30.00 | $47.00 | 5% |
| 609E26000 CURB, TYPE 6 Section 4 - PAVEMENT - Totals Awd $134,260.10 2 $116,643.00 3 $129,907.35 4 $184,745.00 5 $175,415.00 | 590 FT | $39.00 | $45.00 | $43.15 | $56.00 | $38.00 | 4% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 2 EACH | $10,734 | $10,750 | $10,794 | $10,150 | $9,300 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $19,995 | $15,000 | $9,878 | $8,000 | $10,000 | 4% |
| 611E04400 12" CONDUIT, TYPE B | 200 FT | $97.60 | $87.00 | $74.20 | $110 | $235 | 4% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 682.5 FT | $28.36 | $28.00 | $29.70 | $26.40 | $26.00 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,995 | $40,000 | $77,452 | $189,008 | $70,000 | 4% |
| 624E10000 MOBILIZATION Section 9 - INCIDENTALS - Totals Awd $73,965.00 2 $95,010.00 3 $132,041.85 4 $257,066.70 5 $174,000.00 | 1 LS | $17,950 | $33,000 | $37,510 | $40,000 | $87,000 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 71 CY | $242 | $490 | $513 | $575 | $575 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $17,025 | $7,010 | $7,202 | $20,059 | $7,000 | 3% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $16,275 | $16,300 | $24,723 | $22,385 | $20,000 | 3% |
| 632E87140 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 12 | 1 EACH | $16,270 | $16,300 | $15,431 | $14,340 | $14,000 | 3% |
| 631E97700 SIGN LIGHTING MISC.: WARNING SIGN FLASHER ASSEMBLY | 2 EACH | $7,856 | $7,875 | $1,615 | $1,805 | $1,500 | 3% |
| 632E87130 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 10 | 1 EACH | $14,717 | $14,750 | $14,101 | $13,285 | $12,000 | 3% |
| Item | Quantity | R1Performance Site Development | R2Brumbaugh Construction INC | R3Double Jay Construction INC | R4Perram Electric INC | R5Complete General Construction Company |
|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 613 SY | $6.40 | $17.00 | $17.45 | $11.00 | $45.00 |
| 202E30000 WALK REMOVED | 925 SF | $4.00 | $4.00 | $1.80 | $5.00 | $6.50 |
| 202E32000 CURB REMOVED | 210 FT | $11.00 | $15.00 | $15.10 | $17.50 | $28.00 |
| 202E38000 GUARDRAIL REMOVED | 330 FT | $6.35 | $7.00 | $6.60 | $2.40 | $2.50 |
| 202E75000 FENCE REMOVED | 70 FT | $6.35 | $12.00 | $11.10 | $14.00 | $9.50 |
| 203E10000 EXCAVATION | 431 CY | $29.55 | $30.00 | $30.10 | $50.00 | $150 |
| 203E20000 EMBANKMENT | 345 CY | $25.00 | $38.00 | $31.20 | $45.00 | $11.50 |
| 204E10000 SUBGRADE COMPACTION | 417 SY | $4.00 | $3.00 | $2.95 | $3.25 | $11.50 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 3 EACH | $1,392 | $1,400 | $1,458 | $1,420 | $1,420 |
| 608E13000 6" CONCRETE WALK | 180 SF | $12.25 | $12.00 | $9.90 | $11.50 | $21.50 |
| 608E15000 8" CONCRETE WALK | 460 SF | $12.95 | $14.00 | $11.85 | $11.50 | $30.00 |
| 608E53020 DETECTABLE WARNING Section 1 - ROADWAY - Totals Awd $210,523.70 2 $229,047.00 3 $208,961.35 4 $214,613.25 5 $318,550.00 | 80 SF | $29.00 | $56.00 | $53.00 | $33.00 | $8.75 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 3,235 SY | $2.40 | $1.00 | $2.50 | $2.50 | $1.75 |
| 659E20000 COMMERCIAL FERTILIZER | 0.45 TON | $800 | $1,400 | $840 | $750 | $1,500 |
| 659E35000 WATER | 18 MGAL | $31.75 | $5.00 | $33.00 | $100 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 2,680 SY | $4.75 | $2.25 | $4.95 | $2.25 | $1.95 |
| 602E20000 CONCRETE MASONRY | 3.46 CY | $995 | $3,200 | $3,380 | $2,100 | $3,050 |
| 611E04600 12" CONDUIT, TYPE C | 25 FT | $89.20 | $85.00 | $70.45 | $135 | $180 |
| 611E07400 18" CONDUIT, TYPE B | 110 FT | $115 | $104 | $92.95 | $135 | $250 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,220 | $3,300 | $4,496 | $3,700 | $4,700 |
| 611E99654 MANHOLE ADJUSTED TO GRADE Section 3 - DRAINAGE - Totals Awd $42,796.20 2 $45,662.00 3 $44,919.55 4 $51,791.00 5 $95,803.00 | 1 EACH | $1,750 | $325 | $1,903 | $600 | $1,550 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 249 SY | $42.25 | $19.00 | $19.90 | $50.00 | $50.00 |
| 304E20000 AGGREGATE BASE | 71 CY | $86.15 | $95.00 | $99.00 | $145 | $180 |
| 407E20000 NON-TRACKING TACK COAT | 87 GAL | $31.55 | $12.00 | $13.20 | $10.00 | $10.00 |
| 442E22120 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 14 CY | $788 | $554 | $579 | $1,460 | $1,460 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 28 SY | $115 | $105 | $127 | $125 | $135 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 85 SY | $126 | $11.00 | $123 | $125 | $130 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 200 FT | $53.00 | $60.00 | $63.85 | $88.00 | $78.50 |
| 638E10501 FIRE HYDRANT REMOVED AND RESET, AS PER PLAN Section 5 - WATER WORK - Totals Awd $1,125.00 2 $4,900.00 3 $2,660.00 4 $3,300.00 5 $2,600.00 | 1 EACH | $1,125 | $4,900 | $2,660 | $3,300 | $2,600 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 145.5 FT | $18.95 | $20.00 | $19.80 | $23.90 | $17.00 |
| 630E08600 SIGN POST REFLECTOR | 8 EACH | $47.26 | $64.00 | $49.50 | $125 | $45.00 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 13 EACH | $302 | $298 | $317 | $160 | $500 |
| 630E79501 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, AS PER PLAN | 14 EACH | $242 | $373 | $253 | $135 | $395 |
| 630E80100 SIGN, FLAT SHEET | 160.25 SF | $26.26 | $20.00 | $27.60 | $30.00 | $26.00 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 4 EACH | $121 | $271 | $127 | $275 | $210 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 4 EACH | $21.20 | $22.00 | $22.00 | $110 | $35.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $26.26 | $71.00 | $27.50 | $220 | $65.00 |
| 630E86006 REMOVAL OF GROUND MOUNTED POST SUPPORT AND STORAGE | 5 EACH | $31.55 | $30.00 | $33.00 | $110 | $50.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 2 EACH | $36.76 | $122 | $38.50 | $220 | $125 |
| 644E00104 EDGE LINE, 6" | 0.07 MILE | $11,191 | $11,200 | $11,725 | $8,755 | $10,658 |
| 644E00300 CENTER LINE | 0.4 MILE | $10,501 | $10,500 | $11,000 | $10,175 | $10,000 |
| 644E00404 CHANNELIZING LINE, 12" | 350 FT | $2.16 | $2.00 | $2.20 | $2.25 | $2.00 |
| 644E00500 STOP LINE | 49 FT | $8.46 | $8.00 | $8.80 | $5.25 | $8.00 |
| 644E00630 CROSSWALK LINE, 24" | 290 FT | $8.45 | $8.00 | $8.80 | $5.20 | $8.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE, YELLOW | 155 FT | $8.45 | $8.00 | $8.80 | $5.00 | $8.00 |
| 644E00720 CHEVRON MARKING, WHITE | 115 FT | $8.45 | $8.00 | $8.80 | $5.00 | $8.00 |
| 644E01300 LANE ARROW | 5 EACH | $158 | $158 | $165 | $175 | $150 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 460 FT | $5.50 | $5.25 | $5.50 | $5.05 | $5.00 |
| 644E30020 REMOVAL OF PAVEMENT MARKING Section 6 - TRAFFIC CONTROL - Totals Awd $30,081.35 2 $31,650.00 3 $31,343.75 4 $29,248.55 5 $34,438.06 | 2 EACH | $158 | $158 | $165 | $400 | $150 |
| 625E00450 CONNECTION, FUSED PULL APART | 2 EACH | $89.26 | $89.00 | $203 | $175 | $150 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 2 EACH | $72.46 | $73.00 | $201 | $170 | $150 |
| 625E18400 BRACKET ARM, 20' | 2 EACH | $1,122 | $1,125 | $1,372 | $1,010 | $2,000 |
| 625E23306 NO. 10 AWG 600 VOLT DISTRIBUTION CABLE | 1,320 FT | $0.80 | $0.80 | $2.55 | $3.15 | $2.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 360 FT | $0.63 | $0.60 | $2.50 | $1.10 | $3.25 |
| 625E25408 CONDUIT, 2", 725.051 | 780 FT | $1.25 | $1.25 | $6.70 | $12.90 | $11.25 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 49 FT | $57.76 | $58.00 | $179 | $152 | $100 |
| 625E26252 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), TYPE I | 2 EACH | $624 | $626 | $680 | $660 | $500 |
| 625E29000 TRENCH | 780 FT | $17.35 | $17.00 | $14.05 | $14.00 | $12.00 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $866 | $868 | $1,067 | $2,050 | $1,300 |
| 625E31510 PULL BOX REMOVED | 7 EACH | $788 | $789 | $437 | $250 | $450 |
| 625E32000 GROUND ROD | 11 EACH | $142 | $142 | $286 | $350 | $290 |
| 625E36010 UNDERGROUND WARNING MARKING TAPE | 780 FT | $1.45 | $1.40 | $1.75 | $1.30 | $3.00 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 10 EACH | $754 | $755 | $1,252 | $970 | $1,150 |
| 632E05064 VEHICULAR SIGNAL HEAD, (LED), 4-SECTION, 12" LENS, | 4 EACH | $1,024 | $1,026 | $1,426 | $1,070 | $1,300 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 1 EACH | $1,408 | $1,400 | $1,997 | $1,635 | $1,900 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 8 EACH | $455 | $455 | $813 | $568 | $800 |
| 632E20751 ACCESSIBLE PEDESTRIAN PUSHBUTTON, AS PER PLAN | 8 EACH | $1,415 | $1,420 | $1,242 | $1,300 | $1,250 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 14 EACH | $47.26 | $47.00 | $93.80 | $10.00 | $38.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 8 EACH | $47.26 | $47.00 | $93.80 | $5.00 | $32.00 |
| 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES | 410 FT | $9.90 | $10.00 | $13.60 | $14.65 | $20.00 |
| 632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG | 200 FT | $0.72 | $0.75 | $2.50 | $3.35 | $2.50 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 3,200 FT | $1.15 | $1.15 | $3.05 | $3.57 | $3.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 2,120 FT | $1.50 | $1.50 | $3.70 | $3.90 | $3.75 |
| 632E64000 STRAIN POLE FOUNDATION | 3 EACH | $2,363 | $2,400 | $7,773 | $10,555 | $9,000 |
| 632E64020 PEDESTAL FOUNDATION | 8 EACH | $788 | $790 | $1,312 | $1,610 | $1,500 |
| 632E67300 POWER CABLE, 3 CONDUCTOR, NO. 8 AWG | 60 FT | $2.95 | $2.90 | $4.05 | $6.25 | $5.00 |
| 632E86130 STRAIN POLE, TYPE TC-81.11, DESIGN 10 | 1 EACH | $13,908 | $13,950 | $13,408 | $12,740 | $12,000 |
| 632E89802 PEDESTAL, 5', TRANSFORMER BASE | 1 EACH | $498 | $500 | $938 | $1,010 | $1,000 |
| 632E89904 PEDESTAL, 10', TRANSFORMER BASE | 5 EACH | $612 | $613 | $1,147 | $1,090 | $1,000 |
| 632E90008 PEDESTAL, 15', TRANSFORMER BASE | 2 EACH | $796 | $800 | $2,780 | $1,220 | $2,000 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $6,300 | $6,300 | $7,458 | $7,040 | $6,000 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM: PULL BOX | 1 EACH | $788 | $790 | $746 | $490 | $275 |
| 632E90208 REUSE OF STRAIN POLE | 1 EACH | $788 | $790 | $1,645 | $2,420 | $825 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 1 EACH | $6,826 | $6,840 | $6,542 | $7,385 | $5,500 |
| 809E69200 EMERGENCY VEHICLE PREEMPTION | 1 EACH | $995 | $1,000 | $1,880 | $850 | $1,200 |
| 809E69210 PREEMPT RECEIVING UNIT | 1 EACH | $3,334 | $3,350 | $3,091 | $805 | $800 |
| 809E69220 PREEMPT DETECTOR CABLE | 700 FT | $1.60 | $1.50 | $4.00 | $3.95 | $5.00 |
| 809E69230 PREEMPT PHASE SELECTOR | 1 EACH | $5,453 | $5,470 | $1,480 | $2,455 | $6,000 |
| 809E69240 PREEMPT CONFIRMATION LIGHT Section 7 - TRAFFIC SIGNALS - Totals Awd $257,513.46 2 $257,635.00 3 $313,453.65 4 $312,680.50 5 $295,513.00 | 1 EACH | $1,144 | $1,150 | $1,143 | $2,855 | $750 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST Section 8 - MAINTENANCE OF TRAFFIC - Totals Awd $2,232.50 2 $2,500.00 3 $2,475.00 4 $3,000.00 5 $2,500.00 | 25 HOUR | $89.30 | $100 | $99.00 | $120 | $100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →