D09-GR-FY2026
D09 County · est $1.0M
Bid dateThursday, January 29—
Awarded toPDK CONSTRUCTION INC$915,498.74
D09 County · est $1.0M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 606E15050 GUARDRAIL, TYPE MGS | 14,957 FT | $19.16 | $287k | 31% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 83 EACH | $2,200 | $183k | 20% |
| 209E70000 BORROW | 2,396 CY | $48.5 | $116k | 13% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 2,888 FT | $21.84 | $63k | 7% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 600 FT | $98.5 | $59k | 6% |
| 624E10000 MOBILIZATION Section 4 - INCIDENTALS - Totals Awd $55,800.00 2 $53,730.00 3 $62,500.00 | 1 LS | $33,600 | $34k | 4% |
| 202E38000 GUARDRAIL REMOVED | 14,838 FT | $1.8 | $27k | 3% |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 97 EACH | $200 | $19k | 2% |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 8 EACH | $2,200 | $18k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $17,400 | $17k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1Pdk Construction INC | R2Lake Erie Construction Company | R3M P Dory CO | % of bid |
|---|---|---|---|---|---|
| 606E15050 GUARDRAIL, TYPE MGS | 14,957 FT | $19.16 | $19.20 | $23.50 | 32% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 83 EACH | $2,200 | $2,495 | $2,450 | 20% |
| 209E70000 BORROW | 2,396 CY | $48.50 | $56.25 | $48.00 | 13% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 2,888 FT | $21.84 | $24.80 | $25.50 | 7% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 600 FT | $98.50 | $116 | $110 | 7% |
| 624E10000 MOBILIZATION Section 4 - INCIDENTALS - Totals Awd $55,800.00 2 $53,730.00 3 $62,500.00 | 1 LS | $33,600 | $32,500 | $50,000 | 4% |
| 202E38000 GUARDRAIL REMOVED | 14,838 FT | $1.80 | $2.40 | $2.50 | 3% |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 97 EACH | $200 | $365 | $235 | 2% |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 8 EACH | $2,200 | $2,450 | $2,450 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $17,400 | $17,500 | $5,000 | 2% |
| 659E10000 SEEDING AND MULCHING | 19,500 SY | $0.88 | $1.00 | $1.50 | 2% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 14 EACH | $1,000 | $1,260 | $1,100 | 2% |
| 606E13000 GUARDRAIL, TYPE 5 | 750 FT | $17.48 | $19.00 | $19.50 | 1% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 18 EACH | $600 | $1,050 | $950 | 1% |
| 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN | 3,225 FT | $2.00 | $2.80 | $3.50 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,800 | $3,730 | $7,500 | 1% |
| 209E60201 LINEAR GRADING, AS PER PLAN | 234 STA | $20.00 | $35.00 | $100 | 1% |
| 659E20000 COMMERCIAL FERTILIZER | 2.64 TON | $1,575 | $375 | $1,275 | 0% |
| 614E13314 BARRIER REFLECTOR, TYPE 3 BI-DIRECTIONAL | 396 EACH | $9.00 | $12.00 | $12.00 | 0% |
| 606E26000 ANCHOR ASSEMBLY, TYPE B | 1 EACH | $2,300 | $2,200 | $2,200 | 0% |
| Item | Quantity | R1Pdk Construction INC | R2Lake Erie Construction Company | R3M P Dory CO |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $100 | $1,150 | $2,750 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 300 FT | $1.60 | $3.00 | $2.50 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $125 | $125 | $200 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 7 EACH | $125 | $120 | $125 |
| 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B | 1 EACH | $125 | $115 | $200 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 7 EACH | $200 | $150 | $125 |
| 606E17350 GUARDRAIL, TYPE MGS, 25' LONG-SPAN | 75 FT | $17.98 | $24.00 | $28.00 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $2,300 | $2,650 | $2,500 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 6 EACH | $100 | $150 | $80.00 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET Section 1 - ROADWAY - Totals Awd $830,257.94 2 $941,333.00 3 $983,964.00 | 6 EACH | $50.00 | $120 | $40.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 975 SY | $0.50 | $0.46 | $1.00 |
| 659E31000 LIME | 4.03 ACRE | $210 | $50.00 | $155 |
| 659E35000 WATER | 105 MGAL | $1.00 | $1.00 | $10.00 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $23,756.80 2 $22,245.00 3 $36,265.65 | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 100 FT | $12.00 | $14.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION Section 3 - TRAFFIC CONTROL - Totals Awd $5,684.00 2 $7,417.00 3 $6,557.00 | 23 EACH | $40.00 | $55.00 | $35.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →