Skip to content
Figure 0.1 · BRIEFING
BID #260072 · ODOTRESULT · awarded Jan 29

D09-PM FY2026 (A)

D09 County · est $0.6M

Bid dateThursday, January 29
Awarded toTHE AERO-MARK COMPANY LLC$376,000
read → connected → answeredcassandri

Project scope

Bid form · ODOT

33ITEMS
  • Pavement Marking61%
  • Maintaining Traffic12%
  • Mobilization & General6%
  • Other21%

Top items by winning bid

ItemQtyUnit priceExtended%
642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 130,644 FT$2.1$64k17%
642E00620 CROSSWALK LINE, 12", TYPE 117,089 FT$2.25$38k10%
642E01300 LANE ARROW, TYPE 1581 EACH$60$35k9%
642E01200 PARKING LOT STALL MARKING, TYPE 134,097 FT$1$34k9%
614E11000 MAINTAINING TRAFFIC1 LS$34,000$34k9%
642E00500 STOP LINE, TYPE 110,566 FT$3$32k8%
642E00404 CHANNELIZING LINE, 12", TYPE 149,988 FT$0.5$25k7%
642E01510 DOTTED LINE, 6", TYPE 141,897 FT$0.5$21k6%
642E00400 CHANNELIZING LINE, 8", TYPE 147,371 FT$0.4$19k5%
624E10000 MOBILIZATION Section 2 - INCIDENTALS - Totals Awd $49,820.10 2 $52,500.00 3 $74,460.94 4 $61,750.001 LS$14,000$14k4%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 13 more items below.

Rank 1The Aero-mark Company LLC$376kRank 2Oglesby Construction INC$439kRank 3A & A Safety INC$491kRank 4Alpha Space Control LLC$519k
ItemQuantityR1The Aero-mark Company LLCR2Oglesby Construction INCR3A & A Safety INCR4Alpha Space Control LLC
642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 130,644 FT$2.10$3.00$2.00$2.55
642E00620 CROSSWALK LINE, 12", TYPE 117,089 FT$2.25$3.00$2.50$2.95
642E01300 LANE ARROW, TYPE 1581 EACH$60.00$50.00$80.00$67.45
642E01200 PARKING LOT STALL MARKING, TYPE 134,097 FT$1.00$1.00$1.15$1.50
614E11000 MAINTAINING TRAFFIC1 LS$34,000$25,000$20,000$3,000
642E00500 STOP LINE, TYPE 110,566 FT$3.00$3.50$2.70$3.85
642E00404 CHANNELIZING LINE, 12", TYPE 149,988 FT$0.50$0.55$0.85$0.56
642E01510 DOTTED LINE, 6", TYPE 141,897 FT$0.50$0.45$0.70$0.58
642E00400 CHANNELIZING LINE, 8", TYPE 147,371 FT$0.40$0.50$0.75$0.48
624E10000 MOBILIZATION Section 2 - INCIDENTALS - Totals Awd $49,820.10 2 $52,500.00 3 $74,460.94 4 $61,750.001 LS$14,000$25,000$52,000$49,250
642E01110 SCHOOL SYMBOL MARKING, 96", TYPE 134 EACH$350$350$500$295
642E01000 RAILROAD SYMBOL MARKING, TYPE 121 EACH$350$350$500$330
642E00900 ISLAND MARKING, TYPE 15,001 SF$1.00$3.00$2.50$2.50
642E01352 TWO WAY LEFT TURN ARROW, TYPE 141 EACH$120$100$160$123
642E01410 WORD ON PAVEMENT, 96", TYPE 138 EACH$90.00$50.00$95.00$250
642E00800 CURB MARKING, TYPE 12,822 FT$1.00$3.00$3.60$3.55
642E00630 CROSSWALK LINE, 24", TYPE 11,251 FT$2.25$3.50$2.60$4.65
642E41000 SPEED REDUCTION MARKING, TYPE 1111 EACH$25.00$20.00$50.00$345
642E01312 LANE REDUCTION ARROW, TYPE 17 EACH$300$250$350$250
642E40000 SPEED MEASUREMENT MARKING20 EACH$100$115$50.00$425
Show all 33 line items
ItemQuantityR1The Aero-mark Company LLCR2Oglesby Construction INCR3A & A Safety INCR4Alpha Space Control LLC
642E00104 EDGE LINE, 6", TYPE 10.11 MILE$15,000$10,000$13,345$17,450
642E00300 CENTER LINE, TYPE 10.02 MILE$35,000$20,000$13,795$22,500
642E00720 CHEVRON MARKING, TYPE 1766 FT$2.10$3.00$2.00$2.55
642E01100 SCHOOL SYMBOL MARKING, 72", TYPE 12 EACH$350$350$500$250
642E01322 WRONG WAY ARROW, TYPE 14 EACH$250$400$400$215
642E01560 DOTTED LINE, 12", TYPE 12,890 FT$0.60$0.50$0.75$0.63
642E01702 HANDICAP SYMBOL MARKING, TYPE 131 EACH$50.00$35.00$135$62.45
642E20000 TWO-WAY RADIO EQUIPMENT1 LS$1.00$1.00$100$1.00
642E20802 YIELD LINE, TYPE 1197 FT$5.00$3.00$7.00$12.35
642E30020 REMOVAL OF PAVEMENT MARKING3 EACH$150$300$225$155
644E30000 REMOVAL OF PAVEMENT MARKING100 FT$5.00$5.00$14.20$3.25
644E30020 REMOVAL OF PAVEMENT MARKING Section 1 - TRAFFIC CONTROL - Totals Awd $326,179.90 2 $386,347.05 3 $416,212.85 4 $457,078.0710 EACH$185$300$225$145
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$1,820$2,500$2,461$9,500

Project details

Description
D09-PM FY2026 (A)
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →