Skip to content
Figure 0.1 · BRIEFING
BID #260050 · ODOTRESULT · awarded Jan 29

CLI-IR 71-04.23

CLI County · est $3.0M

Bid dateThursday, January 29
Awarded toJOHN R JURGENSEN COMPANY$3.29M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

36ITEMS
  • Pavement Marking31%
  • Maintaining Traffic22%
  • Removal & Demolition8%
  • Asphalt Paving8%
  • Mobilization & General6%
  • Erosion & Landscaping3%
  • Other22%

Top items by winning bid

ItemQtyUnit priceExtended%
442E10300 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (6,021 CY$258.14$1.55M47%
255E19101 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,250 SY$1,752$438k13%
614E11000 MAINTAINING TRAFFIC1 LS$342,611$343k10%
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75"144,492 SY$1.77$256k8%
624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $521,975.86 2 $489,500.001 LS$162,500$163k5%
253E02000 PAVEMENT REPAIR150 CY$720.48$108k3%
407E20000 NON-TRACKING TACK COAT13,005 GAL$4.5$59k2%
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST420 HOUR$137.18$58k2%
617E10100 COMPACTED AGGREGATE410 CY$137.98$57k2%
807E14010 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, EDG12.58 MILE$4,280$54k2%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.

Rank 1John R Jurgensen Company$3.29MRank 2Barrett Paving Materials INC$3.56M
ItemQuantityR1John R Jurgensen CompanyR2Barrett Paving Materials INC
442E10300 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (6,021 CY$258$270
255E19101 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,250 SY$1,752$1,700
614E11000 MAINTAINING TRAFFIC1 LS$342,611$375,000
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75"144,492 SY$1.77$2.75
624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $521,975.86 2 $489,500.001 LS$162,500$100,000
253E02000 PAVEMENT REPAIR150 CY$720$1,075
407E20000 NON-TRACKING TACK COAT13,005 GAL$4.50$5.00
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST420 HOUR$137$100
617E10100 COMPACTED AGGREGATE410 CY$138$170
807E14010 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, EDG12.58 MILE$4,280$4,280
442E00100 ANTI-SEGREGATION EQUIPMENT4,316 CY$10.00$18.00
850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING$1,470$1,470
807E14110 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, LAN6.16 MILE$1,830$1,830
617E20000 SHOULDER PREPARATION7,380 SY$1.50$2.20
614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT13.58 MILE$800$800
621E00100 RPM270 EACH$39.00$39.00
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$9,533$9,500
647E21012 SPEED MEASUREMENT MARKING, TYPE B12512 EACH$781$395
645E00118 EDGE LINE, 6", TYPE A40.34 MILE$24,000$24,000
623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P1 LS$7,332$5,000
Show all 36 line items
ItemQuantityR1John R Jurgensen CompanyR2Barrett Paving Materials INC
832E30000 EROSION CONTROL Section 1 - EROSION CONTROL - Totals Awd $1,000.00 2 $1,000.001,000 EACH$1.00$1.00
254E01600 PATCHING PLANED SURFACE1,450 SY$4.43$4.00
255E20000 FULL DEPTH PAVEMENT SAWING815 FT$8.28$5.00
617E25000 WATER8 MGAL$7.84$1.00
618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) Section 2 - PAVEMENT - Totals Awd $2,545,722.10 2 $2,867,857.5012.34 MILE$565$1,625
621E54000 RAISED PAVEMENT MARKER REMOVED270 EACH$18.43$9.00
644E00720 CHEVRON MARKING554 FT$7.00$7.00
646E20200 PARKING LOT STALL MARKING910 FT$2.00$2.00
646E20320 WRONG WAY ARROW1 EACH$250$250
807E14310 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, CHA1,800 FT$2.00$2.00
807E14410 WET REFLECTIVE THERMOPLASTIC PAVEMENT MARKING, DOT1,200 FT$1.80$1.80
850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING Section 3 - TRAFFIC CONTROL - Totals Awd $140,607.46 2 $133,434.40$1.60$1.60
614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN4 SNMT$950$775
614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT7.25 MILE$660$660
614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT1,200 FT$2.00$2.00
808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY Section 4 - MAINTENANCE OF TRAFFIC - Totals Awd $85,044.60 2 $65,549.004 SNMT$1,395$600

Project details

Description
CLI-IR 71-04.23
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →