Skip to content
Figure 0.1 · BRIEFING
BID #260048 · ODOTRESULT · awarded Jan 29

CLE-SR 125-08.95

CLE County · est $2.7M

Bid dateThursday, January 29
Awarded toJOHN R JURGENSEN COMPANY$2.82M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

48ITEMS
  • Maintaining Traffic42%
  • Pavement Marking33%
  • Asphalt Paving6%
  • Removal & Demolition4%
  • Mobilization & General4%
  • Erosion & Landscaping2%
  • Other8%

Top items by winning bid

ItemQtyUnit priceExtended%
424E14000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B448 (4157 CY$300.75$1.25M44%
253E02000 PAVEMENT REPAIR, (B)900 CY$431.7$389k14%
253E02000 PAVEMENT REPAIR, (A)850 CY$400.42$340k12%
614E11000 MAINTAINING TRAFFIC1 LS$218,467$218k8%
897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 1"149,643 SY$1.44$215k8%
624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $357,038.10 2 $458,965.051 LS$125,000$125k4%
407E20000 NON-TRACKING TACK COAT13,468 GAL$4.5$61k2%
621E00100 RPM1,005 EACH$36$36k1%
850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING$1,400$25k1%
807E10010 WET REFLECTIVE TRAFFIC PAINT, EDGE LINE, 6"9.41 MILE$2,600$24k1%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 28 more items below.

Rank 1John R Jurgensen Company$2.82MRank 2Barrett Paving Materials INC$3.06M
ItemQuantityR1John R Jurgensen CompanyR2Barrett Paving Materials INC
424E14000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B448 (4157 CY$301$295
253E02000 PAVEMENT REPAIR, (B)900 CY$432$400
253E02000 PAVEMENT REPAIR, (A)850 CY$400$350
614E11000 MAINTAINING TRAFFIC1 LS$218,467$342,000
897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 1"149,643 SY$1.44$2.90
624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $357,038.10 2 $458,965.051 LS$125,000$100,000
407E20000 NON-TRACKING TACK COAT13,468 GAL$4.50$4.00
621E00100 RPM1,005 EACH$36.00$36.00
850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING$1,400$1,400
807E10010 WET REFLECTIVE TRAFFIC PAINT, EDGE LINE, 6"9.41 MILE$2,600$2,600
644E00300 CENTER LINE4.96 MILE$3,875$3,875
621E54000 RAISED PAVEMENT MARKER REMOVED1,005 EACH$14.43$10.00
618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE)4.58 MILE$2,380$2,500
807E10110 WET REFLECTIVE TRAFFIC PAINT, LANE LINE, 6"8.61 MILE$1,100$1,100
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$8,440$11,965
614E18600 PORTABLE CHANGEABLE MESSAGE SIGN8 SNMT$925$4,300
647E21012 SPEED MEASUREMENT MARKING, TYPE B12510 EACH$675$300
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST50 HOUR$133$90.00
897E02000 PATCHING PLANED SURFACE Section 2 - PAVEMENT - Totals Awd $2,272,557.76 2 $2,390,596.701,499 SY$4.31$5.00
614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT9.41 MILE$660$660
Show all 48 line items
ItemQuantityR1John R Jurgensen CompanyR2Barrett Paving Materials INC
832E30000 EROSION CONTROL Section 1 - EROSION CONTROL - Totals Awd $1,000.00 2 $1,000.001,000 EACH$1.00$1.00
644E00500 STOP LINE71 FT$7.00$7.00
644E00700 TRANSVERSE/DIAGONAL LINE747 FT$7.00$7.00
644E01110 SCHOOL SYMBOL MARKING, 96"1 EACH$400$400
644E01300 LANE ARROW13 EACH$112$112
644E01350 LANE REDUCTION ARROW2 EACH$112$112
644E01370 TWO WAY LEFT TURN ARROW2 EACH$200$208
645E00118 EDGE LINE, 6", TYPE A40.05 MILE$25,000$25,000
645E00220 LANE LINE, 6", TYPE A40.05 MILE$9,000$9,000
645E00312 CENTER LINE, TYPE A40.03 MILE$40,000$40,000
807E10310 WET REFLECTIVE TRAFFIC PAINT, CHANNELIZING LINE, 1819 FT$2.00$2.00
807E10410 WET REFLECTIVE TRAFFIC PAINT, DOTTED LINE, 6"484 FT$1.40$1.40
850E10110 GROOVING FOR 6" RECESSED PAVEMENT MARKING$1.00$1.00
850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING Section 3 - TRAFFIC CONTROL - Totals Awd $151,358.35 2 $143,174.60$2.00$2.00
614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT4 MILE$500$500
614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT8.61 MILE$500$500
614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT2 MILE$880$880
614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT5.1 MILE$880$880
614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT4 MILE$660$660
614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN82 FT$0.85$0.85
614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA819 FT$0.85$0.85
614E24204 WORK ZONE DOTTED LINE, CLASS I, 8", 642 PAINT48 FT$1.60$1.60
614E24614 WORK ZONE DOTTED LINE, CLASS III, 8", 642 PAINT484 FT$1.60$1.60
614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT12 FT$3.00$3.00
614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT71 FT$3.00$3.00
614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT19 EACH$30.00$30.00
614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT Section 4 - MAINTENANCE OF TRAFFIC - Totals Awd $38,474.65 2 $63,309.6519 EACH$30.00$30.00
623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P1 LS$5,131$5,000

Project details

Description
CLE-SR 125-08.95
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →