BUT-SR 73-16.05
BUT County · est $1.0M
Bid dateThursday, January 29—
Awarded toFILLMORE CONSTRUCTION$878,414.45
BUT County · est $1.0M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 Section 4 - PAVEMENT - Totals Awd $494,774.00 2 $595,847.75 3 $645,756.11 | 449 (936 CY | $218 | $204k | 23% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 671 CY | $228 | $153k | 17% |
| 608E52001 CURB RAMP, AS PER PLAN | 2,786 SF | $24 | $67k | 8% |
| 253E02000 PAVEMENT REPAIR | 236 CY | $260 | $61k | 7% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 19,183 SY | $3 | $58k | 7% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $112,000.00 2 $79,955.55 3 $125,830.52 | 1 LS | $52,000 | $52k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $40k | 5% |
| 202E30001 WALK REMOVED, AS PER PLAN | 3,043 SF | $12 | $37k | 4% |
| 608E10000 4" CONCRETE WALK | 1,622 SF | $20 | $32k | 4% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 10 EACH | $2,000 | $20k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 53 more items below.
| Item | Quantity | R1Fillmore Construction | R2Barrett Paving Materials INC | R3John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 Section 4 - PAVEMENT - Totals Awd $494,774.00 2 $595,847.75 3 $645,756.11 | 449 (936 CY | $218 | $237 | $248 | 25% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 671 CY | $228 | $254 | $297 | 19% |
| 608E52001 CURB RAMP, AS PER PLAN | 2,786 SF | $24.00 | $27.25 | $15.00 | 8% |
| 253E02000 PAVEMENT REPAIR | 236 CY | $260 | $430 | $469 | 8% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 19,183 SY | $3.00 | $3.75 | $3.91 | 7% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $112,000.00 2 $79,955.55 3 $125,830.52 | 1 LS | $52,000 | $29,500 | $48,750 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $32,000 | $61,277 | 5% |
| 202E30001 WALK REMOVED, AS PER PLAN | 3,043 SF | $12.00 | $6.50 | $6.00 | 5% |
| 608E10000 4" CONCRETE WALK | 1,622 SF | $20.00 | $13.75 | $14.00 | 4% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 10 EACH | $2,000 | $1,285 | $1,499 | 2% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $13,000.00 2 $14,200.00 3 $15,100.00 | 10,000 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $2,156 | $5,982 | 1% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 97 FT | $100 | $75.75 | $55.00 | 1% |
| 254E01600 PATCHING PLANED SURFACE | 1,922 SY | $5.00 | $8.50 | $7.07 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 3,073 GAL | $3.00 | $4.50 | $5.00 | 1% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 9 EACH | $1,000 | $900 | $1,354 | 1% |
| 609E26000 CURB, TYPE 6 Section 1 - ROADWAY - Totals Awd $168,340.00 2 $148,048.25 3 $106,042.57 | 84 FT | $80.00 | $56.50 | $47.00 | 1% |
| 644E00300 CENTER LINE | 1.13 MILE | $5,100 | $5,100 | $5,500 | 1% |
| 202E32501 CURB AND GUTTER REMOVED, AS PER PLAN | 262 FT | $20.00 | $27.00 | $20.00 | 1% |
| 203E20000 EMBANKMENT | 50 CY | $100 | $75.00 | $75.00 | 1% |
| Item | Quantity | R1Fillmore Construction | R2Barrett Paving Materials INC | R3John R Jurgensen Company |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $2,800 | $514 |
| 202E32001 CURB REMOVED, AS PER PLAN | 80 FT | $17.00 | $22.25 | $18.75 |
| 203E10000 EXCAVATION | 10 CY | $100 | $55.00 | $200 |
| 608E53020 DETECTABLE WARNING | 20 SF | $50.00 | $100 | $50.00 |
| 659E00300 TOPSOIL | 20 CY | $60.00 | $165 | $75.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 180 SY | $10.00 | $5.00 | $20.00 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 100 FT | $50.00 | $41.00 | $15.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE Section 3 - DRAINAGE - Totals Awd $38,500.00 2 $32,025.00 3 $37,081.21 | 9 EACH | $500 | $775 | $935 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 77 FT | $15.00 | $15.00 | $18.00 |
| 630E80100 SIGN, FLAT SHEET | 26 SF | $15.00 | $15.50 | $25.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $15.00 | $15.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $45.00 | $45.00 | $75.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $20.00 | $20.00 | $35.00 |
| 630E97700 SIGNING, MISC.: RELOCATION OF SOLAR POWERED RECTAN | 2 EACH | $2,495 | $1,310 | $1,310 |
| 632E26500 DETECTOR LOOP | 2 EACH | $1,795 | $1,445 | $1,445 |
| 632E27200 LOOP DETECTOR TIE IN | 2 EACH | $120 | $185 | $185 |
| 632E64020 PEDESTAL FOUNDATION | 2 EACH | $2,390 | $1,660 | $1,660 |
| 644E00100 EDGE LINE, 4" | 1.05 MILE | $2,559 | $2,559 | $3,575 |
| 644E00200 LANE LINE, 4" | 0.04 MILE | $5,000 | $5,000 | $1,510 |
| 644E00400 CHANNELIZING LINE, 8" | 274 FT | $3.00 | $3.00 | $2.05 |
| 644E00500 STOP LINE | 168 FT | $7.00 | $7.00 | $6.90 |
| 644E00620 CROSSWALK LINE, 12" | 720 FT | $3.50 | $3.50 | $3.45 |
| 644E00630 CROSSWALK LINE, 24" | 60 FT | $7.00 | $7.00 | $5.50 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 174 FT | $7.00 | $7.00 | $6.90 |
| 644E00900 ISLAND MARKING | 125 SF | $3.50 | $3.50 | $4.10 |
| 644E01000 RAILROAD SYMBOL MARKING | 2 EACH | $655 | $655 | $410 |
| 644E01200 PARKING LOT STALL MARKING | 266 FT | $6.00 | $6.00 | $2.75 |
| 644E01300 LANE ARROW Section 5 - TRAFFIC CONTROL - Totals Awd $35,321.45 2 $30,934.45 3 $31,564.65 | 19 EACH | $93.00 | $93.00 | $110 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $120 | $125 | $135 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 0.04 MILE | $1,500 | $1,500 | $625 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.04 MILE | $1,500 | $1,500 | $625 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 1.13 MILE | $3,000 | $3,000 | $1,400 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.13 MILE | $3,000 | $3,000 | $1,400 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 1.05 MILE | $1,500 | $1,500 | $935 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 1.05 MILE | $1,500 | $1,500 | $935 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 274 FT | $1.50 | $1.50 | $1.15 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 274 FT | $1.50 | $1.50 | $1.15 |
| 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I | 174 FT | $1.00 | $1.00 | $1.95 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 174 FT | $1.00 | $1.00 | $1.95 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 168 FT | $3.00 | $3.00 | $3.90 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 168 FT | $3.00 | $3.00 | $3.90 |
| 614E27010 WORK ZONE CROSSWALK LINE, CLASS I, 12" | 720 FT | $1.00 | $1.00 | $1.95 |
| 614E27020 WORK ZONE CROSSWALK LINE, CLASS I, 24" | 60 FT | $2.00 | $2.00 | $1.95 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 720 FT | $1.00 | $1.00 | $1.95 |
| 614E27260 WORK ZONE CROSSWALK LINE, CLASS III, 24", 642 PAIN | 60 FT | $2.00 | $2.00 | $1.95 |
| 614E30000 WORK ZONE ARROW, CLASS I | 19 EACH | $25.00 | $25.00 | $46.75 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 19 EACH | $25.00 | $25.00 | $46.75 |
| 614E32000 WORK ZONE RAILROAD SYMBOL MARKING, CLASS I | 2 EACH | $134 | $134 | $188 |
| 614E32210 WORK ZONE RAILROAD SYMBOL MARKING, CLASS III, 642 | 2 EACH | $134 | $134 | $188 |
| 614E32700 WORK ZONE ISLAND MARKING, CLASS I | 125 SF | $0.50 | $0.50 | $2.35 |
| 614E32800 WORK ZONE ISLAND MARKING, CLASS III, 642 PAINT Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $16,479.00 2 $16,519.00 3 $15,035.26 | 125 SF | $0.50 | $0.50 | $2.35 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $14,150 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $2,150 | $4,822 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →