Figure 0.1 · BRIEFING
BID #260042 · ODOTRESULT · awarded Jan 29

ATH-SR 56-00.90

ATH County · est $2.1M

Bid dateThursday, January 29
Awarded toALAN STONE CO INC$1.73M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

63ITEMS
  • Earthwork22%
  • Drainage14%
  • Erosion & Landscaping11%
  • Signs8%
  • Asphalt Paving6%
  • Removal & Demolition5%
  • Other33%

Top items by winning bid

ItemQtyUnit priceExtended%
203E10000 EXCAVATION36,199 CY$21$760k44%
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449), 6"696 CY$220$153k9%
208E15000 PRESPLITTING2,712 SY$36$98k6%
304E20000 AGGREGATE BASE720 CY$100$72k4%
441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2449 (232 CY$250$58k3%
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG190 CY$300$57k3%
203E20000 EMBANKMENT10,370 CY$5$52k3%
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$45,000$45k3%
201E11000 CLEARING AND GRUBBING1 LS$37,000$37k2%
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $97,800.00 2 $71,594.00 3 $89,417.00 4 $88,660.30 5 $88,472.75 6 $95,359.7535,000 EACH$1$35k2%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 43 more items below.

Rank 1Alan Stone CO INC$1.73MRank 2Mason Dixon Energy Services LLC$1.78MRank 3Allard Excavation LLC$1.80MRank 4Shelly & Sands INC$1.83MRank 5D G M INC$1.86MRank 6Mc Kee Paving & Sealing LLC$1.99M
ItemQuantityR1Alan Stone CO INCR2Mason Dixon Energy Services LLCR3Allard Excavation LLCR4Shelly & Sands INCR5D G M INCR6Mc Kee Paving & Sealing LLC
203E10000 EXCAVATION36,199 CY$21.00$27.00$23.00$25.50$23.00$23.00
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449), 6"696 CY$220$195$190$190$220$250
208E15000 PRESPLITTING2,712 SY$36.00$3.25$34.00$19.00$35.00$38.00
304E20000 AGGREGATE BASE720 CY$100$65.00$92.00$97.00$105$90.00
441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2449 (232 CY$250$225$220$220$240$250
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG190 CY$300$255$250$250$250$250
203E20000 EMBANKMENT10,370 CY$5.00$11.00$5.00$9.50$11.50$20.00
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$45,000$14,000$24,743$44,500$20,000$16,500
201E11000 CLEARING AND GRUBBING1 LS$37,000$19,477$52,564$38,268$55,000$65,000
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $97,800.00 2 $71,594.00 3 $89,417.00 4 $88,660.30 5 $88,472.75 6 $95,359.7535,000 EACH$1.00$1.00$1.00$1.00$1.00$1.00
624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $107,000.00 2 $125,000.00 3 $153,305.00 4 $153,500.00 5 $128,000.00 6 $126,000.001 LS$30,000$81,500$108,428$90,000$40,000$55,000
204E30010 GRANULAR MATERIAL, TYPE B, (GRADATION 703.17), 6"253 CY$90.00$75.00$98.00$85.00$105$100
605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC1,116 FT$20.00$8.00$19.00$20.00$15.00$16.00
208E16000 HYDROLOGIST1 LS$20,000$3,000$2,000$16,500$2,500$5,000
605E13510 6" ROCK CUT UNDERDRAINS WITH GEOTEXTILE FABRIC400 FT$50.00$12.00$25.00$33.00$22.00$18.00
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$20,000$24,500$12,909$12,500$38,000$29,500
202E23000 PAVEMENT REMOVED3,427 SY$5.50$14.00$10.00$0.90$8.00$8.00
832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS1 LS$17,000$1,500$10,891$9,150$10,000$9,500
204E10000 SUBGRADE COMPACTION4,459 SY$3.00$5.00$3.00$2.00$4.00$4.25
204E13000 EXCAVATION OF SUBGRADE625 CY$20.00$24.00$24.00$17.00$25.00$30.00
Show all 63 line items
ItemQuantityR1Alan Stone CO INCR2Mason Dixon Energy Services LLCR3Allard Excavation LLCR4Shelly & Sands INCR5D G M INCR6Mc Kee Paving & Sealing LLC
202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER85 FT$20.00$16.00$7.00$26.00$25.00$12.00
202E58100 CATCH BASIN REMOVED1 EACH$470$250$126$450$300$750
204E20000 EMBANKMENT625 CY$5.00$11.00$22.00$0.25$25.00$15.00
204E45000 PROOF ROLLING3 HOUR$1,400$180$248$250$100$225
208E10000 PRE-BLAST CONDITION SURVEY1 LS$1,100$1,000$1,000$1,000$1,500$2,000
208E12000 BLASTING CONSULTANT1 LS$11,000$1,000$6,500$6,500$3,500$4,500
208E13000 AIR BLAST AND NOISE CONTROL1 LS$4,600$1,000$2,000$800$1,250$3,500
208E14000 VIBRATION CONTROL AND MONITORING1 LS$4,600$1,000$2,000$800$1,250$3,500
623E40500 REFERENCE MONUMENT, TYPE A12 EACH$1,000$250$1,025$550$1,000$500
204E50000 GEOTEXTILE FABRIC Section 1 - ROADWAY - Totals Awd $1,081,544.98 2 $1,245,190.04 3 $1,159,929.00 4 $1,192,800.05 5 $1,232,576.00 6 $1,337,043.751,516 SY$3.03$1.44$1.50$1.00$2.00$1.50
601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA6 CY$500$70.00$158$300$200$350
616E10000 WATER100 MGAL$1.00$1.00$1.00$100$1.00$1.00
659E00100 SOIL ANALYSIS TEST2 EACH$180$300$150$150$150$175
659E00300 TOPSOIL200 CY$35.00$30.00$37.00$15.00$25.00$65.00
659E10000 SEEDING AND MULCHING10,419 SY$1.00$0.75$1.00$0.70$1.00$1.00
659E10001 SEEDING AND MULCHING, AS PER PLAN6,603 SY$1.00$0.75$1.00$1.00$1.25$1.25
659E20000 COMMERCIAL FERTILIZER1.54 TON$1,200$250$1,250$1,250$1,500$1,250
659E31000 LIME3.52 ACRE$200$25.00$150$150$300$150
659E35000 WATER92 MGAL$1.50$1.00$1.00$1.00$1.00$1.00
670E00720 DITCH EROSION PROTECTION MAT, TYPE B514 SY$2.00$1.25$2.50$2.50$3.00$3.00
832E15000 STORM WATER POLLUTION PREVENTION PLAN1 LS$3,600$4,000$2,083$1,750$2,200$1,800
832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA1 LS$11,000$10,000$11,843$9,934$11,000$10,750
511E53010 CLASS QC1 CONCRETE, MISC.:CULVERT BACKFILL AND BED20.5 CY$225$200$283$195$450$279
602E20000 CONCRETE MASONRY1.7 CY$2,500$200$8,163$3,500$2,500$3,000
611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS118 FT$35.00$8.00$32.00$34.00$35.00$24.00
611E08700 21" CONDUIT, TYPE A45 FT$160$45.00$91.00$172$130$165
611E10200 24" CONDUIT, TYPE A62 FT$170$45.00$158$146$130$175
611E99710 PRECAST REINFORCED CONCRETE OUTLET Section 3 - DRAINAGE - Totals Awd $73,352.50 2 $24,927.00 3 $68,976.60 4 $66,856.50 5 $57,355.00 6 $57,357.501 EACH$300$1,000$427$585$300$375
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.50"128 SY$40.00$10.50$19.95$22.00$12.50$10.50
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE470 SY$20.00$12.00$22.50$25.00$12.50$12.00
407E20000 NON-TRACKING TACK COAT452 GAL$6.50$3.50$3.28$3.28$4.50$4.00
252E01500 FULL DEPTH PAVEMENT SAWING Section 4 - PAVEMENT - Totals Awd $359,901.75 2 $293,936.00 3 $312,868.66 4 $317,081.06 5 $343,059.00 6 $354,467.00275 FT$8.45$8.00$4.50$1.50$6.00$5.00
621E00100 RPM38 EACH$85.00$150$75.00$75.00$75.00$80.00
621E54000 RAISED PAVEMENT MARKER REMOVED38 EACH$10.00$30.00$10.00$12.00$1.00$3.50
630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST147 FT$25.00$40.00$22.00$20.00$25.00$25.00
630E08600 SIGN POST REFLECTOR12 EACH$70.00$40.00$50.00$50.00$60.00$55.00
630E80100 SIGN, FLAT SHEET62 SF$30.00$45.00$36.00$22.50$40.00$40.00
630E80600 SIGN, DOUBLE FACED, MILE MARKER1 EACH$250$200$500$185$100$525
630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL17 EACH$20.00$50.00$75.00$15.00$25.00$80.00
630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA11 EACH$25.00$50.00$125$20.00$25.00$130
642E00104 EDGE LINE, 6", TYPE 10.56 MILE$1,800$4,000$1,600$1,600$1,700$1,700
642E00300 CENTER LINE, TYPE 1 Section 5 - TRAFFIC CONTROL - Totals Awd $12,698.00 2 $21,230.00 3 $14,084.00 4 $11,547.00 5 $12,299.00 6 $15,011.000.28 MILE$3,000$5,000$2,650$6,250$2,800$2,700
614E11000 MAINTAINING TRAFFIC1 LS$12,000$5,000$7,225$6,500$30,000$25,000

Project details

Description
ATH-SR 56-00.90
Type of work
Pavement

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →