UNI-SR 31-15.55, UNI-SR 347-03.89
UNI County · est $2.7M
Bid dateThursday, January 15—
Awarded toSHELLY COMPANY$2.91M
UNI County · est $2.7M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 5,860 CY | $205.5 | $1.20M | 41% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN, 15" | 2,064 CY | $274 | $566k | 19% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 142,741 SY | $2.08 | $297k | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $235,000 | $235k | 8% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $343,500.00 | 1 LS | $100,000 | $100k | 3% |
| 251E01040 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 2,403 SY | $39.35 | $95k | 3% |
| 644E00104 EDGE LINE, 6" | 17.9 MILE | $3,265 | $58k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 12,132 GAL | $4.1 | $50k | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 90 CY | $500 | $45k | 2% |
| 617E10100 COMPACTED AGGREGATE | 277 CY | $110 | $30k | 1% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 23 more items below.
| Item | Quantity | R1Shelly Company | % of bid |
|---|---|---|---|
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 5,860 CY | $206 | 42% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN, 15" | 2,064 CY | $274 | 20% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 142,741 SY | $2.08 | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $235,000 | 8% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $343,500.00 | 1 LS | $100,000 | 3% |
| 251E01040 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 2,403 SY | $39.35 | 3% |
| 644E00104 EDGE LINE, 6" | 17.9 MILE | $3,265 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 12,132 GAL | $4.10 | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 90 CY | $500 | 2% |
| 617E10100 COMPACTED AGGREGATE | 277 CY | $110 | 1% |
| 605E31100 AGGREGATE DRAINS | 1,520 FT | $19.25 | 1% |
| 621E00100 RPM | 612 EACH | $41.46 | 1% |
| 644E00300 CENTER LINE | 8.95 MILE | $2,835 | 1% |
| 617E20000 SHOULDER PREPARATION | 9,061 SY | $2.75 | 1% |
| 608E52000 CURB RAMP | 423 SF | $48.00 | 1% |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 3.27 MILE | $4,600 | 1% |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 450 FT | $30.00 | 0% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 587 SF | $17.75 | 0% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT Section 7 - MAINTENANCE OF TRAFFIC - Totals Awd $21,832.00 | 17.9 MILE | $580 | 0% |
| 874E21000 LONGITUDINAL JOINT PREPARATION Section 4 - PAVEMENT - Totals Awd $2,347,585.78 | 3.27 MILE | $2,350 | 0% |
| Item | Quantity | R1Shelly Company |
|---|---|---|
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 40 SY | $13.75 |
| 202E30001 WALK REMOVED, AS PER PLAN | 567 SF | $5.75 |
| 623E39600 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE Section 1 - ROADWAY - Totals Awd $38,933.50 | 4 EACH | $1,100 |
| 659E00300 TOPSOIL | 0.9 CY | $675 |
| 659E10000 SEEDING AND MULCHING | 34.3 SY | $15.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $900 |
| 659E31000 LIME | 0.01 ACRE | $1.00 |
| 659E35000 WATER | 0.6 MGAL | $0.75 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $2,149.46 | 1,000 EACH | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 4 EACH | $1,100 |
| 611E99654 MANHOLE ADJUSTED TO GRADE Section 3 - DRAINAGE - Totals Awd $38,060.00 | 4 EACH | $1,100 |
| 617E25000 WATER | 5 MGAL | $1.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE Section 5 - WATER WORK - Totals Awd $1,660.00 | 4 EACH | $415 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 612 EACH | $3.85 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $150 |
| 644E00500 STOP LINE | 20 FT | $9.00 |
| 644E00630 CROSSWALK LINE, 24" | 243 FT | $9.00 |
| 644E01110 SCHOOL SYMBOL MARKING, 96" Section 6 - TRAFFIC CONTROL - Totals Awd $115,953.47 | 2 EACH | $870 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $85.00 |
| 614E12461 WORK ZONE MARKING SIGN, AS PER PLAN | 53 EACH | $85.00 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 8.95 MILE | $700 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $3,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →