CUY-IR 480-13.04 Ramps
CUY County · est $2.2M
Bid dateThursday, January 15—
Awarded toTRI-MOR CORP$1.87M
CUY County · est $2.2M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 452E14120 11" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 7,867 SY | $93 | $732k | 39% |
| 611E09101 21" CONDUIT, TYPE C, AS PER PLAN | 598 FT | $185 | $111k | 6% |
| 202E23000 PAVEMENT REMOVED | 8,469 SY | $12.5 | $106k | 6% |
| 304E20000 AGGREGATE BASE | 1,530 CY | $60 | $92k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $75,000 | $75k | 4% |
| 451E15070 11" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P WITH | 634 SY | $110 | $70k | 4% |
| 203E10000 EXCAVATION | 2,751 CY | $19 | $52k | 3% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $183,000.00 2 $216,651.49 3 $145,326.00 4 $240,500.00 5 $210,850.00 6 $211,486.98 7 $244,029.00 8 $291,350.00 9 $249,638.45 | 1 LS | $50,000 | $50k | 3% |
| 605E13510 6" ROCK CUT UNDERDRAINS WITH GEOTEXTILE FABRIC | 2,398 FT | $20 | $48k | 3% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 905 CY | $50 | $45k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 60 more items below.
| Item | Quantity | R1Tri-mor CORP | R2Anthony Allega Cement Contractor INC | R3Catts Construction INC | R4Karvo Companies INC | R5Great Lakes Construction CO | R6Perk Company INC | R7Ruhlin Company | R8Fabrizi Trucking & Paving CO INC | R9Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 452E14120 11" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 7,867 SY | $93.00 | $95.40 | $105 | $105 | $119 | $111 | $116 | $129 | $119 | 45% |
| 611E09101 21" CONDUIT, TYPE C, AS PER PLAN | 598 FT | $185 | $150 | $215 | $100 | $140 | $210 | $150 | $198 | $300 | 7% |
| 202E23000 PAVEMENT REMOVED | 8,469 SY | $12.50 | $8.36 | $13.50 | $17.00 | $15.25 | $18.90 | $20.00 | $30.00 | $15.00 | 6% |
| 304E20000 AGGREGATE BASE | 1,530 CY | $60.00 | $77.64 | $73.00 | $50.00 | $75.00 | $85.80 | $90.00 | $75.00 | $100 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $75,000 | $56,007 | $63,700 | $50,000 | $34,550 | $112,000 | $55,000 | $35,200 | $61,138 | 5% |
| 451E15070 11" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P WITH | 634 SY | $110 | $115 | $122 | $175 | $139 | $139 | $125 | $137 | $123 | 4% |
| 203E10000 EXCAVATION | 2,751 CY | $19.00 | $27.02 | $39.00 | $50.01 | $42.00 | $39.55 | $32.00 | $36.00 | $65.00 | 3% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $183,000.00 2 $216,651.49 3 $145,326.00 4 $240,500.00 5 $210,850.00 6 $211,486.98 7 $244,029.00 8 $291,350.00 9 $249,638.45 | 1 LS | $50,000 | $93,651 | $14,000 | $126,000 | $113,000 | $34,259 | $124,000 | $178,650 | $138,000 | 3% |
| 605E13510 6" ROCK CUT UNDERDRAINS WITH GEOTEXTILE FABRIC | 2,398 FT | $20.00 | $24.36 | $17.00 | $15.00 | $26.00 | $27.00 | $45.00 | $28.00 | $34.00 | 3% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 905 CY | $50.00 | $70.96 | $29.00 | $50.00 | $65.00 | $84.00 | $74.00 | $65.00 | $85.00 | 3% |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 2,437 FT | $15.00 | $20.17 | $16.00 | $15.00 | $21.00 | $18.45 | $19.00 | $18.00 | $28.00 | 2% |
| 611E05901 15" CONDUIT, TYPE B, AS PER PLAN | 313 FT | $105 | $134 | $164 | $115 | $125 | $195 | $155 | $255 | $290 | 2% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $99,194.25 2 $96,965.42 3 $99,668.71 4 $88,526.55 5 $87,978.87 6 $97,309.25 7 $88,030.45 8 $125,956.00 9 $121,809.73 | 32,623 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 209E60201 LINEAR GRADING, AS PER PLAN | 20 STA | $1,350 | $764 | $500 | $250 | $500 | $378 | $295 | $3,110 | $800 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $25,000 | $22,148 | $24,636 | $25,000 | $13,500 | $21,600 | $19,775 | $21,600 | $30,000 | 2% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $25,000 | $50,154 | $28,266 | $25,000 | $17,500 | $25,000 | $22,750 | $28,000 | $30,000 | 2% |
| 659E00300 TOPSOIL | 444 CY | $47.00 | $61.60 | $74.75 | $20.00 | $55.00 | $65.00 | $50.00 | $68.00 | $120 | 1% |
| 611E98300 CATCH BASIN, NO. 5 | 4 EACH | $4,800 | $7,112 | $6,050 | $3,750 | $4,750 | $6,325 | $8,600 | $7,385 | $11,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $19,000 | $9,490 | $20,698 | $15,000 | $15,000 | $25,000 | $11,675 | $18,000 | $10,000 | 1% |
| 204E13000 EXCAVATION OF SUBGRADE | 905 CY | $20.00 | $25.73 | $28.00 | $45.00 | $37.00 | $32.25 | $52.00 | $28.00 | $58.00 | 1% |
| Item | Quantity | R1Tri-mor CORP | R2Anthony Allega Cement Contractor INC | R3Catts Construction INC | R4Karvo Companies INC | R5Great Lakes Construction CO | R6Perk Company INC | R7Ruhlin Company | R8Fabrizi Trucking & Paving CO INC | R9Kokosing Construction Company INC |
|---|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,000 | $896 | $1,800 | $3,000 | $20,000 | $9,170 | $60,500 | $26,200 | $25,000 |
| 202E30000 WALK REMOVED | 244 SF | $3.00 | $4.47 | $3.00 | $4.00 | $4.00 | $3.15 | $2.00 | $2.00 | $5.00 |
| 202E30600 CONCRETE MEDIAN REMOVED | 105 SY | $15.00 | $11.64 | $7.00 | $150 | $25.00 | $34.00 | $56.00 | $18.00 | $20.00 |
| 202E32000 CURB REMOVED | 194 FT | $8.00 | $2.81 | $2.00 | $20.00 | $6.00 | $5.75 | $5.00 | $8.00 | $5.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 808 FT | $18.00 | $8.43 | $10.00 | $15.00 | $13.00 | $39.50 | $18.00 | $25.00 | $40.00 |
| 202E58100 CATCH BASIN REMOVED | 7 EACH | $300 | $487 | $600 | $1,000 | $875 | $576 | $400 | $450 | $1,000 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 117 FT | $13.00 | $21.86 | $22.00 | $25.00 | $25.00 | $34.50 | $70.00 | $18.00 | $40.00 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 190 FT | $5.00 | $28.00 | $4.50 | $20.00 | $30.00 | $33.60 | $70.00 | $40.00 | $12.00 |
| 203E20000 EMBANKMENT | 150 CY | $10.00 | $33.75 | $10.00 | $50.00 | $12.50 | $25.25 | $105 | $14.00 | $9.00 |
| 204E10000 SUBGRADE COMPACTION | 8,946 SY | $1.00 | $0.32 | $1.00 | $1.00 | $1.80 | $1.60 | $2.00 | $3.35 | $3.50 |
| 204E45000 PROOF ROLLING | 5 HOUR | $200 | $146 | $289 | $275 | $300 | $572 | $410 | $150 | $305 |
| 608E10000 4" CONCRETE WALK | 258 SF | $12.00 | $24.68 | $10.00 | $8.00 | $22.00 | $16.10 | $20.00 | $13.00 | $15.00 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $2,800 | $1,008 | $5,500 | $1,200 | $3,000 | $4,640 | $3,620 | $2,320 | $5,000 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND Section 1 - ROADWAY - Totals Awd $298,597.50 2 $286,804.72 3 $328,040.50 4 $444,261.51 5 $428,177.05 6 $477,021.90 7 $532,106.00 8 $603,470.10 9 $571,891.00 | 1 LS | $2,800 | $1,008 | $5,500 | $1,200 | $3,000 | $4,640 | $3,620 | $2,320 | $2,000 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $420 | $90.00 | $135 | $375 | $500 | $200 | $250 | $150 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 3,991 SY | $2.25 | $1.34 | $2.00 | $2.00 | $1.20 | $2.00 | $1.30 | $6.50 | $1.30 |
| 659E14000 REPAIR SEEDING AND MULCHING | 201 SY | $2.25 | $2.24 | $1.00 | $5.00 | $2.00 | $2.00 | $3.00 | $2.00 | $3.00 |
| 659E15000 INTER-SEEDING | 201 SY | $2.25 | $1.12 | $1.00 | $6.00 | $0.25 | $1.00 | $0.75 | $2.00 | $0.75 |
| 659E20000 COMMERCIAL FERTILIZER | 0.57 TON | $3,500 | $1,344 | $1.00 | $885 | $1,200 | $1,000 | $900 | $2,000 | $900 |
| 659E31000 LIME | 0.83 ACRE | $300 | $1.12 | $1.00 | $161 | $0.51 | $1,000 | $5.00 | $1,850 | $5.00 |
| 659E35000 WATER | 23 MGAL | $120 | $67.20 | $1.00 | $1.00 | $60.00 | $10.00 | $0.75 | $10.00 | $0.75 |
| 670E00700 DITCH EROSION PROTECTION | 375 SY | $16.00 | $3.36 | $1.00 | $5.00 | $3.00 | $3.80 | $5.50 | $6.00 | $5.50 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 305 SY | $3.00 | $4.48 | $2.50 | $5.00 | $4.00 | $4.70 | $5.50 | $8.00 | $5.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,200 | $3,248 | $5,000 | $5,000 | $2,985 | $2,900 | $2,900 | $3,800 | $2,900 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $8,300 | $9,475 | $8,000 | $12,500 | $8,800 | $3,720 | $8,560 | $10,500 | $7,490 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $12,000 | $12,467 | $11,131 | $15,000 | $8,750 | $15,133 | $11,131 | $14,000 | $15,000 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 403 FT | $15.00 | $19.01 | $19.00 | $20.00 | $27.00 | $24.60 | $18.00 | $22.00 | $40.00 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 347 FT | $16.00 | $25.08 | $16.00 | $25.00 | $20.00 | $24.60 | $14.00 | $16.00 | $38.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 184 FT | $25.00 | $48.74 | $16.00 | $15.00 | $42.00 | $21.50 | $31.00 | $18.00 | $70.00 |
| 611E06101 15" CONDUIT, TYPE C, AS PER PLAN | 11 FT | $175 | $438 | $202 | $150 | $290 | $185 | $190 | $205 | $415 |
| 611E06101 15" CONDUIT, TYPE C, AS PER PLAN (706.02) | 8 FT | $250 | $326 | $239 | $125 | $295 | $325 | $195 | $235 | $360 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $6,350 | $7,502 | $5,967 | $3,250 | $5,250 | $5,900 | $8,200 | $7,875 | $9,000 |
| 611E98370 CATCH BASIN, NO. 6 | 3 EACH | $4,200 | $6,086 | $4,161 | $3,250 | $3,250 | $5,500 | $6,000 | $5,550 | $7,000 |
| 611E99550 MANHOLE, NO. 1 Section 3 - DRAINAGE - Totals Awd $291,382.00 2 $332,512.34 3 $328,837.00 4 $223,965.00 5 $305,219.00 6 $377,789.65 7 $381,294.00 8 $396,309.00 9 $549,569.00 | 1 EACH | $5,100 | $6,246 | $6,240 | $5,500 | $3,750 | $6,725 | $6,800 | $11,150 | $6,000 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 198 FT | $8.00 | $5.60 | $4.50 | $5.00 | $15.00 | $3.50 | $2.25 | $3.00 | $3.30 |
| 257E10001 DIAMOND GRINDING PORTLAND CEMENT CONCRETE PAVEMENT | 153 SY | $55.00 | $47.11 | $80.00 | $25.00 | $41.00 | $43.10 | $23.54 | $56.00 | $41.00 |
| 451E10010 6" REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 72 SY | $85.00 | $229 | $98.00 | $80.00 | $210 | $210 | $165 | $144 | $180 |
| 609E14000 CURB, TYPE 2-A | 220 FT | $20.00 | $19.61 | $5.50 | $10.00 | $30.00 | $19.80 | $48.00 | $8.00 | $20.00 |
| 609E22000 CURB, TYPE 3-B | 8 FT | $20.00 | $61.58 | $28.00 | $95.00 | $230 | $19.70 | $125 | $25.00 | $150 |
| 609E70000 4" CONCRETE MEDIAN | 108 SY | $75.00 | $82.28 | $77.00 | $75.00 | $80.00 | $141 | $80.00 | $112 | $100 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN Section 4 - PAVEMENT - Totals Awd $923,498.00 2 $984,389.03 3 $1,042,012.50 4 $1,040,070.00 5 $1,184,272.00 6 $1,141,632.00 7 $1,167,395.12 8 $1,252,665.00 9 $1,213,431.40 | 18 CY | $86.00 | $203 | $52.00 | $275 | $210 | $212 | $97.00 | $146 | $555 |
| 621E00100 RPM | 69 EACH | $100 | $89.32 | $259 | $80.00 | $79.75 | $75.00 | $84.00 | $135 | $79.75 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 349.9 FT | $10.00 | $16.80 | $19.00 | $15.00 | $8.15 | $14.00 | $15.00 | $14.00 | $15.00 |
| 630E08600 SIGN POST REFLECTOR | 12 EACH | $18.00 | $42.00 | $78.00 | $37.50 | $15.50 | $65.00 | $37.50 | $65.00 | $37.50 |
| 630E80100 SIGN, FLAT SHEET | 169.5 SF | $18.00 | $30.80 | $34.00 | $27.50 | $16.00 | $18.00 | $27.50 | $18.00 | $27.50 |
| 630E81010 RAMP REFERENCE MARKER | 2 EACH | $85.00 | $140 | $156 | $125 | $65.00 | $180 | $125 | $180 | $125 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 12 EACH | $30.00 | $11.20 | $12.50 | $10.00 | $25.25 | $30.00 | $10.00 | $30.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 19 EACH | $30.00 | $11.20 | $12.50 | $10.00 | $26.00 | $40.00 | $10.00 | $40.00 | $10.00 |
| 646E10010 EDGE LINE, 6" | 0.83 MILE | $6,000 | $5,656 | $10,590 | $8,500 | $5,050 | $6,500 | $8,500 | $6,500 | $8,500 |
| 646E10110 LANE LINE, 6" | 0.14 MILE | $2,500 | $2,290 | $5,295 | $4,250 | $2,045 | $5,500 | $4,250 | $5,500 | $4,250 |
| 646E10310 CHANNELIZING LINE, 12" | 202 FT | $2.00 | $2.07 | $3.00 | $2.25 | $1.85 | $2.50 | $2.25 | $2.50 | $2.25 |
| 646E10510 CROSSWALK LINE, 12" | 211 FT | $8.50 | $8.46 | $12.50 | $10.00 | $7.55 | $6.00 | $10.00 | $6.00 | $10.00 |
| 646E10520 CROSSWALK LINE, 24" | 39 FT | $14.00 | $13.87 | $15.50 | $12.50 | $12.38 | $11.00 | $12.50 | $11.00 | $12.50 |
| 646E20350 LANE REDUCTION ARROW | 5 EACH | $300 | $299 | $436 | $350 | $267 | $200 | $350 | $200 | $350 |
| 646E20500 DOTTED LINE Section 5 - TRAFFIC CONTROL - Totals Awd $27,179.50 2 $30,033.27 3 $50,316.60 4 $31,021.75 5 $22,571.81 6 $31,849.60 7 $31,297.75 8 $35,989.60 9 $31,004.50 | 1,420 FT | $2.00 | $1.68 | $2.00 | $1.50 | $1.50 | $5.00 | $1.50 | $5.00 | $1.50 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $95.00 | $95.75 | $108 | $125 | $100 | $100 | $85.00 | $85.00 | $120 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $1,000 | $952 | $1,059 | $1,000 | $750 | $1,293 | $850 | $1,000 | $900 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.44 MILE | $15,000 | $14,000 | $15,572 | $12,500 | $11,125 | $12,500 | $12,500 | $12,500 | $12,000 |
| 616E10000 WATER Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $47,800.00 2 $44,080.92 3 $50,693.68 4 $48,841.79 5 $32,590.00 6 $46,155.50 7 $39,172.00 8 $41,975.00 9 $52,350.00 | 3 MGAL | $200 | $166 | $698 | $114 | $65.00 | $239 | $99.00 | $25.00 | $90.00 |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 7 MNTH | $2,000 | $1,050 | $2,666 | $3,500 | $4,400 | $2,175 | $4,372 | $4,500 | $1,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →