Skip to content
Figure 0.1 · BRIEFING
BID #268002 · ODOTRESULT · awarded Mar 12

LAW-SR 7-13.63

LAW County · est $0.2M

Bid dateThursday, March 12
Awarded toFILLMORE CONSTRUCTION$228,621
read → connected → answeredcassandri

Project scope

Bid form · ODOT

43ITEMS
  • Earthwork14%
  • Drainage12%
  • Guardrail & Barrier12%
  • Maintaining Traffic12%
  • Removal & Demolition9%
  • Erosion & Landscaping9%
  • Other33%

Top items by winning bid

ItemQtyUnit priceExtended%
611E16401 36" CONDUIT, TYPE B, AS PER PLAN 706.01, 707.01, 790 FT$1,000$90k39%
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG Section 4 - PAVEMENT - Totals Awd $34,180.00 2 $35,600.00 3 $99,140.00 4 $76,275.0038 CY$400$15k7%
624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $22,200.00 2 $59,900.00 3 $122,000.00 4 $150,200.001 LS$14,500$15k6%
503E11100 COFFERDAMS AND EXCAVATION BRACING1 LS$10,000$10k4%
611E98540 CATCH BASIN, NO. 2-4 Section 3 - DRAINAGE - Totals Awd $114,100.00 2 $158,380.00 3 $74,550.00 4 $109,300.001 EACH$9,500$10k4%
614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $11,950.00 2 $13,250.00 3 $13,750.00 4 $35,625.0025 CY$300$8k3%
606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS125 FT$52$7k3%
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.5")145 SY$40$6k3%
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)18 CY$300$5k2%
202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER104 FT$50$5k2%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 23 more items below.

Rank 1Fillmore Construction$229kRank 2Axis Civil Construction LLC$319kRank 3Stanley Miller Construction Company$368kRank 4R C Construction Company And Son INC$444k
ItemQuantityR1Fillmore ConstructionR2Axis Civil Construction LLCR3Stanley Miller Construction CompanyR4R C Construction Company And Son INC
611E16401 36" CONDUIT, TYPE B, AS PER PLAN 706.01, 707.01, 790 FT$1,000$1,150$595$450
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG Section 4 - PAVEMENT - Totals Awd $34,180.00 2 $35,600.00 3 $99,140.00 4 $76,275.0038 CY$400$400$1,250$1,000
624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $22,200.00 2 $59,900.00 3 $122,000.00 4 $150,200.001 LS$14,500$40,000$75,000$55,000
503E11100 COFFERDAMS AND EXCAVATION BRACING1 LS$10,000$34,000$2,500$35,000
611E98540 CATCH BASIN, NO. 2-4 Section 3 - DRAINAGE - Totals Awd $114,100.00 2 $158,380.00 3 $74,550.00 4 $109,300.001 EACH$9,500$15,000$9,000$25,000
614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $11,950.00 2 $13,250.00 3 $13,750.00 4 $35,625.0025 CY$300$330$150$25.00
606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS125 FT$52.00$38.00$50.00$65.00
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.5")145 SY$40.00$25.00$45.00$65.00
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)18 CY$300$420$1,250$1,000
202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER104 FT$50.00$200$100$100
203E10000 EXCAVATION51 CY$100$35.00$125$25.00
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $9,806.00 2 $8,023.50 3 $13,282.00 4 $11,424.005,000 EACH$1.00$1.00$1.00$1.00
253E01000 PAVEMENT REPAIR50 SY$100$120$300$25.00
614E12420 DETOUR SIGNING1 LS$4,450$5,000$10,000$35,000
202E23000 PAVEMENT REMOVED78 SY$50.00$20.00$30.00$35.00
611E04600 12" CONDUIT, TYPE C 706.01, 706.02, OR 707.3312 FT$300$140$500$400
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$3,500$4,500$12,000$35,000
601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA3 CY$1,000$326$750$750
606E26150 ANCHOR ASSEMBLY, MGS TYPE E1 EACH$2,800$2,500$3,000$3,500
614E11000 MAINTAINING TRAFFIC1 LS$2,500$5,500$8,000$35,000
Show all 43 line items
ItemQuantityR1Fillmore ConstructionR2Axis Civil Construction LLCR3Stanley Miller Construction CompanyR4R C Construction Company And Son INC
201E11001 CLEARING AND GRUBBING, AS PER PLAN1 LS$1,500$3,500$1,000$20,000
202E38000 GUARDRAIL REMOVED192 FT$10.00$6.00$10.00$5.00
202E58100 CATCH BASIN REMOVED1 EACH$500$4,200$1,000$1,500
203E20000 EMBANKMENT2 CY$1,000$120$150$65.00
204E10000 SUBGRADE COMPACTION85 SY$10.00$4.41$5.00$2.00
204E45000 PROOF ROLLING1 HOUR$150$250$80.00$100
606E26550 ANCHOR ASSEMBLY, MGS TYPE T Section 1 - ROADWAY - Totals Awd $31,920.00 2 $42,311.85 3 $35,590.00 4 $51,390.001 EACH$1,500$1,200$2,500$2,500
659E10000 SEEDING AND MULCHING200 SY$8.50$10.00$30.00$20.00
659E20000 COMMERCIAL FERTILIZER0.03 TON$1,800$1,250$800$2,800
659E31000 LIME0.04 ACRE$800$150$150$2,200
659E35000 WATER2 MGAL$10.00$1.00$1.00$1.00
602E20000 CONCRETE MASONRY1 CY$1,000$4,200$3,500$4,000
252E01500 FULL DEPTH PAVEMENT SAWING61 FT$10.00$6.00$25.00$100
304E20000 AGGREGATE BASE14 CY$100$165$160$195
407E10000 TACK COAT77 GAL$10.00$7.00$50.00$10.00
626E00112 BARRIER REFLECTOR, TYPE 3 (TWO-WAY)4 EACH$12.50$12.00$50.00$25.00
630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST50 FT$18.50$12.00$50.00$25.00
630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION6 EACH$150$40.00$50.00$300
630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA4 EACH$25.00$15.00$50.00$1,000
644E00104 EDGE LINE, 6"0.02 MILE$83,000$25,000$200,000$95,000
644E00300 CENTER LINE Section 5 - TRAFFIC CONTROL - Totals Awd $4,465.00 2 $1,868.00 3 $9,200.00 4 $10,150.000.01 MILE$83,000$42,000$200,000$110,000
619E16000 FIELD OFFICE, TYPE A2 MNTH$100$2,200$1,000$100
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$1,500$5,500$25,000$25,000

Project details

Description
LAW-SR 7-13.63
Type of work
Drainage

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →