Figure 0.1 · BRIEFING
BID #260224 · ODOTRESULT · awarded Apr 23

VIN-Tar Hollow Culvert

VIN County · est $0.5M

Bid dateThursday, April 23
Awarded toD G M INC$399,890.1
read → connected → answeredcassandri

Project scope

Bid form · ODOT

39ITEMS
  • Structures / Bridge23%
  • Earthwork21%
  • Erosion & Landscaping18%
  • Drainage13%
  • Asphalt Paving5%
  • Aggregate & Base5%
  • Other15%

Top items by winning bid

ItemQtyUnit priceExtended%
611E95900 12' X 7' CONDUIT, TYPE A, 706.05 Section 5 - STRUCTURE 20 FOOT SPAN AND UNDER (VIN-SF - Totals Awd $282,178.00 2 $328,425.30 3 $323,756.00 4 $307,188.50 5 $332,675.00 6 $391,238.0071 FT$2,025$144k36%
511E46510 CLASS QC1 CONCRETE, FOOTING66 CY$650$43k11%
511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI31 CY$950$29k7%
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$22,000$22k6%
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449), 4"56 CY$345$19k5%
201E11000 CLEARING AND GRUBBING1 LS$12,000$12k3%
202E11001 STRUCTURE REMOVED, AS PER PLAN1 LS$12,000$12k3%
509E10000 EPOXY COATED STEEL REINFORCEMENT5,922 LB$2$12k3%
614E11000 MAINTAINING TRAFFIC1 LS$9,500$10k2%
304E20000 AGGREGATE BASE, 6"84 CY$110$9k2%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 19 more items below.

Rank 1D G M INC$400kRank 2Axis Civil Construction LLC$444kRank 3Double Z Construction Company$455kRank 4Parker Corporation$456kRank 5R C Construction Company And Son$470kRank 6INC Fillmore Construction$489k
ItemQuantityR1D G M INCR2Axis Civil Construction LLCR3Double Z Construction CompanyR4Parker CorporationR5R C Construction Company And SonR6INC Fillmore Construction
611E95900 12' X 7' CONDUIT, TYPE A, 706.05 Section 5 - STRUCTURE 20 FOOT SPAN AND UNDER (VIN-SF - Totals Awd $282,178.00 2 $328,425.30 3 $323,756.00 4 $307,188.50 5 $332,675.00 6 $391,238.0071 FT$2,025$2,225$2,150$2,310$2,100$2,650
511E46510 CLASS QC1 CONCRETE, FOOTING66 CY$650$700$470$854$850$1,000
511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI31 CY$950$1,250$1,200$1,296$850$1,500
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$22,000$3,500$4,000$21,000$15,000$3,500
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449), 4"56 CY$345$342$450$400$375$320
201E11000 CLEARING AND GRUBBING1 LS$12,000$12,500$3,000$19,000$5,500$2,500
202E11001 STRUCTURE REMOVED, AS PER PLAN1 LS$12,000$4,200$12,000$23,000$15,000$2,500
509E10000 EPOXY COATED STEEL REINFORCEMENT5,922 LB$2.00$2.65$3.00$1.25$2.50$4.00
614E11000 MAINTAINING TRAFFIC1 LS$9,500$7,500$4,000$20,000$15,000$5,000
304E20000 AGGREGATE BASE, 6"84 CY$110$167$120$65.00$175$100
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG Section 4 - PAVEMENT - Totals Awd $37,187.50 2 $41,072.00 3 $47,303.00 4 $36,660.00 5 $43,225.00 6 $34,970.0017 CY$500$451$700$500$425$500
601E11000 RIPRAP, TYPE D28 SY$303$240$275$65.00$350$180
518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC125 CY$65.00$125$130$10.00$175$80.00
624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $45,500.00 2 $38,500.00 3 $44,500.00 4 $81,000.00 5 $57,500.00 6 $21,000.001 LS$8,000$20,000$30,000$20,000$15,000$7,500
601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER56 CY$120$140$100$65.00$175$200
203E20000 EMBANKMENT178 CY$35.00$39.00$75.00$20.00$50.00$100
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$6,000$7,500$6,500$20,000$12,500$5,000
659E00580 SEEDING AND MULCHING, CLASS 5B728 SY$8.00$4.00$9.00$1.00$10.00$8.00
512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE)90 SY$45.00$30.00$35.00$12.00$50.00$50.00
512E33010 TYPE 3 WATERPROOFING127 SY$30.00$59.00$45.00$18.00$50.00$50.00
Show all 39 line items
ItemQuantityR1D G M INCR2Axis Civil Construction LLCR3Double Z Construction CompanyR4Parker CorporationR5R C Construction Company And SonR6INC Fillmore Construction
202E23000 PAVEMENT REMOVED, ASPHALT378 SY$6.00$11.50$16.00$10.00$20.00$10.00
203E10000 EXCAVATION2 CY$100$98.00$75.00$20.00$25.00$80.00
204E10000 SUBGRADE COMPACTION Section 1 - ROADWAY - Totals Awd $23,722.00 2 $24,741.00 3 $26,076.00 4 $26,632.00 5 $23,018.00 6 $26,760.00504 SY$6.00$1.50$7.00$0.50$2.00$5.00
659E00100 SOIL ANALYSIS TEST2 EACH$50.00$150$100$50.00$25.00$150
659E00300 TOPSOIL81 CY$20.00$60.00$40.00$20.00$20.00$60.00
659E14000 REPAIR SEEDING AND MULCHING36 SY$0.05$4.00$3.00$0.25$0.20$12.00
659E15000 INTER-SEEDING36 SY$0.05$4.00$3.00$0.25$0.20$12.00
659E20000 COMMERCIAL FERTILIZER0.1 TON$1,500$1,250$1,500$2,500$2,000$1,400
659E31000 LIME0.15 ACRE$300$150$200$1,667$1,800$450
659E35000 WATER4 MGAL$1.00$1.00$1.00$0.05$1.00$10.00
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $8,742.60 2 $9,507.50 3 $11,388.00 4 $3,962.25 5 $10,434.40 6 $13,091.50996 EACH$1.00$1.00$1.00$1.00$1.00$1.00
605E31100 AGGREGATE DRAINS Section 3 - DRAINAGE - Totals Awd $2,560.00 2 $1,280.00 3 $1,600.00 4 $640.00 5 $3,200.00 6 $1,920.0064 FT$40.00$20.00$25.00$10.00$50.00$30.00
407E10000 TACK COAT, 0.06 GAL/SY30 GAL$4.25$7.50$4.10$10.00$10.00$5.00
202E20010 HEADWALL REMOVED2 EACH$500$1,250$5,000$1,000$1,000$3,500
503E11100 COFFERDAMS AND EXCAVATION BRACING1 LS$3,000$12,000$6,500$100$5,000$3,500
503E21100 UNCLASSIFIED EXCAVATION42 CY$35.00$140$280$25.00$100$200
511E46610 CLASS QC1 CONCRETE, HEADWALL1 CY$2,000$1,600$2,000$650$850$3,000
512E33000 TYPE 2 WATERPROOFING155 SY$18.00$19.00$25.00$14.00$35.00$30.00
516E13600 1" PREFORMED EXPANSION JOINT FILLER38 SF$20.00$8.00$15.00$5.00$40.00$20.00

Project details

Description
VIN-Tar Hollow Culvert
Type of work
Drainage

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →