PUT-SR 190-05.71
PUT County · est $1.0M
Bid dateThursday, April 9—
Awarded toFENSON CONTRACTING LLC$598,999.15
PUT County · est $1.0M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 442 CY | $191 | $84k | 14% |
| 203E20000 EMBANKMENT | 3,164 CY | $16 | $51k | 8% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 184 CY | $244 | $45k | 7% |
| 611E23600 60" CONDUIT, TYPE A, 706.02 | 80 FT | $410 | $33k | 5% |
| 611E04600 12" CONDUIT, TYPE C | 779 FT | $35.75 | $28k | 5% |
| 304E20000 AGGREGATE BASE | 488 CY | $54 | $26k | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 13 CY | $1,825 | $24k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $22,500 | $23k | 4% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $60,750.00 2 $85,000.00 3 $76,000.00 | 1 LS | $20,000 | $20k | 3% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $75,681.10 2 $97,817.45 3 $86,508.70 | 17,000 EACH | $1 | $17k | 3% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 60 more items below.
| Item | Quantity | R1Fenson Contracting LLC | R2Sand Ridge Excavating | R3Vernon Nagel INC | % of bid |
|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 442 CY | $191 | $266 | $217 | 18% |
| 203E20000 EMBANKMENT | 3,164 CY | $16.00 | $18.65 | $33.00 | 11% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 184 CY | $244 | $339 | $260 | 10% |
| 611E23600 60" CONDUIT, TYPE A, 706.02 | 80 FT | $410 | $695 | $500 | 7% |
| 611E04600 12" CONDUIT, TYPE C | 779 FT | $35.75 | $44.97 | $55.00 | 6% |
| 304E20000 AGGREGATE BASE | 488 CY | $54.00 | $118 | $75.00 | 6% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 13 CY | $1,825 | $823 | $1,800 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $22,500 | $15,000 | $5,000 | 5% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $60,750.00 2 $85,000.00 3 $76,000.00 | 1 LS | $20,000 | $20,000 | $40,000 | 4% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $75,681.10 2 $97,817.45 3 $86,508.70 | 17,000 EACH | $1.00 | $1.00 | $1.00 | 4% |
| 202E23000 PAVEMENT REMOVED | 2,324 SY | $5.75 | $6.00 | $20.00 | 3% |
| 659E10000 SEEDING AND MULCHING | 4,042 SY | $3.30 | $5.04 | $1.10 | 3% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 165 CY | $77.00 | $115 | $150 | 3% |
| 611E99574 MANHOLE, NO. 3 Section 3 - DRAINAGE - Totals Awd $112,674.25 2 $147,193.98 3 $166,949.00 | 3 EACH | $4,225 | $3,976 | $7,500 | 3% |
| 659E00300 TOPSOIL | 450 CY | $28.00 | $25.00 | $50.00 | 3% |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P Section 4 - PAVEMENT - Totals Awd $171,618.00 2 $252,828.28 3 $198,747.74 | 118 SY | $93.00 | $70.12 | $100 | 2% |
| 611E06100 15" CONDUIT, TYPE C | 148 FT | $70.00 | $61.38 | $70.00 | 2% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $10,275 | $14,245 | $9,000 | 2% |
| 611E10600 24" CONDUIT, TYPE C | 146 FT | $59.00 | $76.26 | $125 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $8,500 | $2,000 | $5,000 | 2% |
| Item | Quantity | R1Fenson Contracting LLC | R2Sand Ridge Excavating | R3Vernon Nagel INC |
|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 2 EACH | $475 | $2,000 | $250 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 554 FT | $7.50 | $30.00 | $24.00 |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 32 FT | $54.00 | $70.00 | $100 |
| 203E10000 EXCAVATION | 516 CY | $16.00 | $8.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 2,664 SY | $1.25 | $4.00 | $1.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 221 CY | $5.00 | $8.00 | $30.00 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 221 CY | $35.00 | $118 | $50.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $100 | $200 | $300 |
| 204E50000 GEOTEXTILE FABRIC | 662 SY | $2.00 | $2.60 | $2.00 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 8 EACH | $350 | $662 | $450 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $3,000 | $5,292 | $2,000 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $3,000 | $5,292 | $500 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $300 | $413 | $295 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 1 EACH | $365 | $588 | $420 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET Section 1 - ROADWAY - Totals Awd $110,920.00 2 $160,753.89 3 $215,606.00 | 3 EACH | $95.00 | $483 | $345 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 2 CY | $175 | $857 | $150 |
| 659E20000 COMMERCIAL FERTILIZER | 0.55 TON | $850 | $870 | $850 |
| 659E31000 LIME | 0.84 ACRE | $35.00 | $60.00 | $35.00 |
| 659E35000 WATER | 22 MGAL | $1.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,052 SY | $1.80 | $3.92 | $1.80 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,000 | $1,295 | $3,100 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $6,000 | $8,372 | $3,000 |
| 602E20000 CONCRETE MASONRY | 1 CY | $3,750 | $265 | $3,000 |
| 605E31100 AGGREGATE DRAINS | 181 FT | $22.50 | $30.00 | $20.00 |
| 611E00200 4" CONDUIT, TYPE C | 27 FT | $16.00 | $33.62 | $33.00 |
| 611E00400 4" CONDUIT, TYPE E | 97 FT | $14.25 | $22.73 | $33.00 |
| 611E00406 4" CONDUIT, TYPE F | 10 FT | $36.25 | $22.22 | $33.00 |
| 611E01400 6" CONDUIT, TYPE E | 24 FT | $19.00 | $27.13 | $53.00 |
| 611E01500 6" CONDUIT, TYPE F | 10 FT | $24.75 | $31.96 | $40.00 |
| 611E02000 8" CONDUIT, TYPE C | 51 FT | $30.75 | $43.90 | $60.00 |
| 611E02500 8" CONDUIT, TYPE E | 10 FT | $25.00 | $47.78 | $42.00 |
| 611E04400 12" CONDUIT, TYPE B | 10 FT | $35.50 | $64.00 | $110 |
| 611E09100 21" CONDUIT, TYPE C | 10 FT | $165 | $153 | $70.00 |
| 611E98390 CATCH BASIN, NO. 7 | 3 EACH | $1,950 | $3,188 | $5,000 |
| 301E56100 ASPHALT CONCRETE BASE, PG64-22, (449), (DRIVEWAYS) | 9 CY | $257 | $357 | $350 |
| 407E20000 NON-TRACKING TACK COAT | 407 GAL | $3.00 | $4.20 | $2.50 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $480 | $665 | $850 |
| 621E00100 RPM | 10 EACH | $80.00 | $644 | $460 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 9 EACH | $10.00 | $30.00 | $50.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 8 FT | $40.00 | $77.00 | $55.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $100 | $168 | $120 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $35.00 | $35.00 | $25.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 1 EACH | $250 | $273 | $195 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.28 MILE | $3,600 | $5,600 | $4,000 |
| 642E00300 CENTER LINE, TYPE 1 Section 5 - TRAFFIC CONTROL - Totals Awd $3,543.00 2 $10,714.00 3 $7,910.00 | 0.14 MILE | $6,000 | $8,400 | $6,000 |
| 253E02000 PAVEMENT REPAIR | 20 CY | $353 | $350 | $400 |
| 407E20000 NON-TRACKING TACK COAT | 20 GAL | $5.00 | $5.00 | $2.50 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 10 CY | $303 | $300 | $800 |
| 616E10000 WATER | 8 MGAL | $54.00 | $1.00 | $10.00 |
| 617E10100 COMPACTED AGGREGATE Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $13,722.00 2 $16,358.00 3 $21,130.00 | 50 CY | $62.00 | $125 | $100 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $4,100 | $20,000 | $10,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 20 CY | $106 | $8.00 | $150 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 3,632 LB | $1.90 | $1.01 | $2.15 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 20 CY | $360 | $823 | $700 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 50 SY | $40.00 | $90.26 | $60.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 7 CY | $185 | $262 | $115 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA Section 7 - MISCELLANEOUS STRUCTURE - Totals Awd $50,090.80 2 $67,786.35 3 $66,413.80 | 110 SF | $25.00 | $95.00 | $40.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,250 | $15,000 | $10,000 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $1,500 | $5,000 | $2,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,500 | $20,000 | $15,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →