BID #264006 · ODOTRESULT · awarded Feb 19

WAY-CULVERT FY2026

WAY County · est $1.0M

Bid dateThursday, February 19
Awarded toCRAWFORD CONSTRUCTION COMPANY INC$878,585.19
read → connected → answeredcassandri

Project scope

Bid form · ODOT

92ITEMS
  • Structures / Bridge22%
  • Guardrail & Barrier14%
  • Drainage13%
  • Erosion & Landscaping11%
  • Maintaining Traffic11%
  • Earthwork9%
  • Other21%

Top items by winning bid

ItemQtyUnit priceExtended%
611E26000 72" CONDUIT, TYPE A, 707.02 (0.168) WITH CONCRETE70 FT$1,030$72k8%
611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (72" CM115 FT$545$63k7%
203E20000 EMBANKMENT1,855 CY$31$58k7%
611E94700 6' X 4' CONDUIT, TYPE A, 706.0595 FT$580$55k6%
442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 Section 4 - PAVEMENT - Totals Awd $123,052.60 2 $107,523.00 3 $96,656.5064 CY$670$43k5%
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)103 CY$408$42k5%
624E10000 MOBILIZATION Section 10 - INCIDENTALS - Totals Awd $77,300.00 2 $147,600.00 3 $134,200.001 LS$40,800$41k5%
622E41100 PORTABLE BARRIER, UNANCHORED Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $58,687.00 2 $48,100.00 3 $146,035.50320 FT$80$26k3%
503E21300 UNCLASSIFIED EXCAVATION1 LS$24,000$24k3%
511E46510 CLASS QC1 CONCRETE, FOOTING21 CY$1,100$23k3%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 72 more items below.

Rank 1Crawford Construction Company INC$879kRank 2Black Horse Bridge Construction INC$1.11MRank 3Rietschlin Construction INC$1.22M
ItemQuantityR1Crawford Construction Company INCR2Black Horse Bridge Construction INCR3Rietschlin Construction INC
611E26000 72" CONDUIT, TYPE A, 707.02 (0.168) WITH CONCRETE70 FT$1,030$1,600$1,980
611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN (72" CM115 FT$545$275$540
203E20000 EMBANKMENT1,855 CY$31.00$43.00$26.00
611E94700 6' X 4' CONDUIT, TYPE A, 706.0595 FT$580$950$1,020
442E22001 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 Section 4 - PAVEMENT - Totals Awd $123,052.60 2 $107,523.00 3 $96,656.5064 CY$670$583$495
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)103 CY$408$350$385
624E10000 MOBILIZATION Section 10 - INCIDENTALS - Totals Awd $77,300.00 2 $147,600.00 3 $134,200.001 LS$40,800$50,000$50,000
622E41100 PORTABLE BARRIER, UNANCHORED Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $58,687.00 2 $48,100.00 3 $146,035.50320 FT$80.00$50.00$58.00
503E21300 UNCLASSIFIED EXCAVATION1 LS$24,000$9,200$14,000
511E46510 CLASS QC1 CONCRETE, FOOTING21 CY$1,100$950$750
511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI10 CY$2,100$1,325$1,360
304E20000 AGGREGATE BASE141 CY$140$120$146
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0")287 SY$62.00$58.00$11.00
614E12420 DETOUR SIGNING1 LS$16,000$15,000$112,800
614E11000 MAINTAINING TRAFFIC1 LS$15,500$72,000$50,000
659E10000 SEEDING AND MULCHING5,264 SY$2.70$1.10$2.00
659E00300 TOPSOIL585 CY$24.00$60.00$45.00
611E97400 CONDUIT, MISC.: 5' X 5' CONDUIT, TYPE A, 706.0510 FT$1,400$1,450$3,640
601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER85 CY$152$125$145
511E46510 CLASS QC1 CONCRETE, FOOTING23 CY$537$548$391
Show all 92 line items
ItemQuantityR1Crawford Construction Company INCR2Black Horse Bridge Construction INCR3Rietschlin Construction INC
201E11000 CLEARING AND GRUBBING1 LS$4,500$22,300$16,000
202E11001 STRUCTURE REMOVED, AS PER PLAN1 LS$12,000$14,200$20,000
202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN1 LS$2,000$7,850$7,500
202E20010 HEADWALL REMOVED2 EACH$1,600$825$2,000
202E23000 PAVEMENT REMOVED338 SY$20.00$38.00$20.00
202E35200 PIPE REMOVED, OVER 24" DIAMETER70 FT$128$60.00$112
202E38000 GUARDRAIL REMOVED768.75 FT$11.00$2.00$3.00
202E38201 GUARDRAIL REMOVED FOR REUSE, AS PER PLAN25 FT$112$23.60$26.00
202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E2 EACH$374$250$204
202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T1 EACH$374$250$88.00
202E70130 SPECIAL - PIPE CLEANOUT OVER 48"115 FT$59.00$30.00$11.00
202E75000 FENCE REMOVED448 FT$10.00$4.00$4.50
203E10000 EXCAVATION227 CY$38.00$17.00$27.00
204E10000 SUBGRADE COMPACTION404 SY$4.00$7.00$4.00
606E13000 GUARDRAIL, TYPE 5550 FT$22.00$18.80$21.00
606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS250 FT$25.00$23.60$26.00
606E26100 ANCHOR ASSEMBLY, TYPE E (MASH 2016)1 EACH$2,650$2,470$2,725
606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016)2 EACH$2,728$2,550$2,805
623E38500 MONUMENT ASSEMBLY, TYPE C4 EACH$1,670$1,400$1,725
623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R1 LS$2,000$5,700$2,100
623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND Section 1 - ROADWAY - Totals Awd $165,946.25 2 $198,425.50 3 $162,293.251 LS$2,000$5,700$2,100
601E11000 RIPRAP, TYPE D51 SY$207$350$235
601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER61 CY$163$150$145
659E00100 SOIL ANALYSIS TEST6 EACH$50.00$50.00$110
659E14000 REPAIR SEEDING AND MULCHING264 SY$1.00$1.00$2.00
659E15000 INTER-SEEDING264 SY$1.00$0.60$2.00
659E20000 COMMERCIAL FERTILIZER0.74 TON$670$903$1,400
659E31000 LIME1.09 ACRE$202$10.00$100
659E35000 WATER29.15 MGAL$0.75$1.00$20.00
670E00520 SLOPE EROSION PROTECTION MAT, TYPE B465 SY$3.00$2.00$5.00
670E00530 SLOPE EROSION PROTECTION MAT, TYPE C2,097 SY$3.00$2.00$4.00
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $80,924.64 2 $95,069.85 3 $94,165.0010,000 EACH$1.00$1.00$1.00
605E31100 AGGREGATE DRAINS302 FT$18.00$19.00$12.00
611E97400 CONDUIT, MISC.: VIDEO LOG Section 3 - DRAINAGE - Totals Awd $210,921.00 2 $255,838.00 3 $337,969.00115 FT$14.00$15.00$3.00
407E10000 TACK COAT105 GAL$3.00$3.00$3.30
408E10001 PRIME COAT, AS PER PLAN56 GAL$5.35$5.00$22.00
621E54000 RAISED PAVEMENT MARKER REMOVED4 EACH$60.00$70.00$62.00
626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL)14 EACH$14.00$14.00$15.50
642E00104 EDGE LINE, 6", TYPE 10.31 MILE$2,140$2,000$2,200
642E00300 CENTER LINE, TYPE 10.4 MILE$5,620$5,250$2,200
642E30030 REMOVAL OF PAVEMENT MARKING (CENTER LINE)0.1 MILE$21,400$20,000$11,000
642E30030 REMOVAL OF PAVEMENT MARKING (EDGE LINE) Section 5 - TRAFFIC CONTROL - Totals Awd $6,557.40 2 $6,196.00 3 $3,677.000.05 MILE$21,400$20,000$11,000
614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS$3,040$2,840$2,300
614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL)6 EACH$15.00$100$14.00
614E13312 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL)5 EACH$15.00$100$14.00
614E13360 OBJECT MARKER, TWO WAY6 EACH$107$100$26.25
614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN4 SNMT$1,700$950$1,100
614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I0.2 MILE$10,700$20,000$17,400
614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I0.12 MILE$6,700$12,500$13,900
614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I24 FT$19.00$17.50$9.00
503E11100 COFFERDAMS AND EXCAVATION BRACING1 LS$6,000$62,000$97,000
602E20000 CONCRETE MASONRY Section 7 - STRUCTURE 20 FOOT SPAN AND UNDER (WAY-30 - Totals Awd $9,910.50 2 $66,977.00 3 $100,555.002.37 CY$1,650$2,100$1,500
503E11100 COFFERDAMS AND EXCAVATION BRACING1 LS$5,500$41,400$20,000
509E10000 EPOXY COATED STEEL REINFORCEMENT3,176 LB$2.80$3.00$2.00
511E46610 CLASS QC1 CONCRETE, HEADWALL1 CY$2,500$1,900$2,500
512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE)29 SY$104$55.00$83.00
512E33000 TYPE 2 WATERPROOFING112 SY$30.00$36.00$30.00
512E33010 TYPE 3 WATERPROOFING97 SY$52.00$60.00$51.00
516E13600 1" PREFORMED EXPANSION JOINT FILLER39 SF$14.00$12.00$11.00
518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC Section 8 - STRUCTURE 20 FOOT SPAN AND UNDER (WAY-58 - Totals Awd $99,058.80 2 $109,693.00 3 $85,345.001 LS$2,100$2,550$2,000
503E11100 COFFERDAMS AND EXCAVATION BRACING1 LS$4,000$47,500$23,000
503E21300 UNCLASSIFIED EXCAVATION1 LS$3,700$4,600$10,000
509E10000 EPOXY COATED STEEL REINFORCEMENT1,821 LB$3.00$3.00$2.75
511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI8 CY$1,400$650$1,050
511E46610 CLASS QC1 CONCRETE, HEADWALL1 CY$1,930$1,200$1,800
512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE)15 SY$152$95.00$110
512E33000 TYPE 2 WATERPROOFING11 SY$259$55.00$30.00
516E13600 1" PREFORMED EXPANSION JOINT FILLER23 SF$15.00$12.00$11.00
518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC Section 9 - STRUCTURE 20 FOOT SPAN AND UNDER (WAY-25 - Totals Awd $46,227.00 2 $79,369.00 3 $61,440.751 LS$2,100$500$2,000
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$9,100$9,600$16,000
619E16010 FIELD OFFICE, TYPE B4 MNTH$850$1,000$1,800
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$8,500$12,000$11,000

Project details

Description
WAY-CULVERT FY2026
Type of work
Drainage

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →