BID #264005 · ODOTRESULT · awarded Feb 19

MRW-SR 95-(01.92) (03.40)

MRW County · est $0.8M

Bid dateThursday, February 19
Awarded toBCC OHIO INC$686,462.46
read → connected → answeredcassandri

Project scope

Bid form · ODOT

61ITEMS
  • Structures / Bridge56%
  • Guardrail & Barrier10%
  • Maintaining Traffic8%
  • Concrete Paving8%
  • Asphalt Paving5%
  • Removal & Demolition3%
  • Other10%

Top items by winning bid

ItemQtyUnit priceExtended%
202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN,1 LS$78,766$79k11%
848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR619 SY$82.82$51k7%
511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE39 CY$1,164$45k7%
848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR427 SY$95.41$41k6%
624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $50,060.88 2 $95,000.001 LS$32,421$32k5%
848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA Section 6 - STRUCTURE OVER 20 FOOT SPAN (MRW-95-03.4 - Totals Awd $369,194.90 2 $485,161.35185 SY$171.75$32k5%
848E20000 SURFACE PREPARATION USING HYDRODEMOLITION536 SY$52.65$28k4%
517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN213 FT$127.89$27k4%
202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN1 LS$24,879$25k4%
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG100 CY$234.91$23k3%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 41 more items below.

Rank 1Bcc Ohio INC$686kRank 2Axis Civil Construction LLC$897k
ItemQuantityR1Bcc Ohio INCR2Axis Civil Construction LLC
202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN,1 LS$78,766$85,000
848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR619 SY$82.82$156
511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE39 CY$1,164$1,880
848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR427 SY$95.41$158
624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $50,060.88 2 $95,000.001 LS$32,421$65,000
848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA Section 6 - STRUCTURE OVER 20 FOOT SPAN (MRW-95-03.4 - Totals Awd $369,194.90 2 $485,161.35185 SY$172$50.00
848E20000 SURFACE PREPARATION USING HYDRODEMOLITION536 SY$52.65$105
517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN213 FT$128$125
202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN1 LS$24,879$20,000
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG100 CY$235$400
509E26000 GALVANIZED STEEL REINFORCEMENT8,319 LB$2.78$2.65
848E20000 SURFACE PREPARATION USING HYDRODEMOLITION427 SY$53.87$105
606E26150 ANCHOR ASSEMBLY, MGS TYPE E8 EACH$2,609$2,550
511E45711 CLASS QC1 CONCRETE, ABUTMENT, AS PER PLAN6 CY$3,368$7,500
511E45711 CLASS QC1 CONCRETE, ABUTMENT, AS PER PLAN2 CY$9,952$7,500
517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN138 FT$128$125
844E20000 GALVANIC ANODE PROTECTION218 EACH$74.07$64.00
690E71000 SPECIAL - ASBESTOS ABATEMENT (MRW-95-3.40 - BLACK Section 1 - ROADWAY - Totals Awd $63,462.00 2 $58,165.001 LS$13,094$8,500
606E15050 GUARDRAIL, TYPE MGS550 FT$22.47$21.50
848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA Section 5 - STRUCTURE OVER 20 FOOT SPAN (MRW-95-01.9 - Totals Awd $171,384.82 2 $206,936.00136 SY$80.59$50.00
Show all 61 line items
ItemQuantityR1Bcc Ohio INCR2Axis Civil Construction LLC
202E38000 GUARDRAIL REMOVED800 FT$2.10$2.80
202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A8 EACH$331$400
606E13000 GUARDRAIL, TYPE 5200 FT$20.79$20.00
606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 48 EACH$1,082$1,000
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $1,000.00 2 $1,000.001,000 EACH$1.00$1.00
626E00110 BARRIER REFLECTOR, TYPE 2 (TWO-WAY) Section 3 - TRAFFIC CONTROL - Totals Awd $210.08 2 $200.0016 EACH$13.13$12.50
407E10000 TACK COAT150 GAL$3.15$8.50
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST20 HOUR$93.45$85.00
614E12420 DETOUR SIGNING1 LS$4,057$6,500
642E00300 CENTER LINE, TYPE 1 Section 4 - MAINTENANCE OF TRAFFIC - Totals Awd $31,149.78 2 $50,975.000.2 MILE$6,300$7,500
509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO100 LB$3.29$5.00
509E26000 GALVANIZED STEEL REINFORCEMENT458 LB$3.18$5.00
510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT (12"45 EACH$33.17$25.00
510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT (6"62 EACH$29.19$25.00
511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE1 CY$1,314$1,030
512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE)11 SY$45.07$120
516E10000 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL (1 1/50 FT$42.72$45.00
516E31011 2" DEEP JOINT SEALER, AS PER PLAN50 FT$25.56$25.00
518E22300 SPECIAL - STEEL DRIP STRIP150 FT$22.16$20.00
848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE8 CY$399$400
848E50000 HAND CHIPPING14 SY$269$350
848E50100 TEST SLAB1 LS$2,781$750
848E50200 FULL-DEPTH REPAIR4 CY$1,173$1,500
848E50300 WEARING COURSE REMOVED, ASPHALT (1.75")134 SY$13.90$15.00
848E50320 EXISTING CONCRETE OVERLAY REMOVED (1.75")294 SY$14.61$15.00
202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN213 FT$32.76$75.00
509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO100 LB$3.29$5.00
510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT (6"136 EACH$28.89$25.00
512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE)67 SY$45.24$50.00
516E10000 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL (2" T53 FT$32.97$35.00
516E31011 2" DEEP JOINT SEALER, AS PER PLAN53 FT$25.56$25.00
518E22300 SPECIAL - STEEL DRIP STRIP247 FT$19.39$20.00
848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE11 CY$399$400
848E50000 HAND CHIPPING19 SY$271$105
848E50100 TEST SLAB1 LS$2,781$750
848E50200 FULL-DEPTH REPAIR4 CY$1,173$1,500
848E50300 WEARING COURSE REMOVED, ASPHALT (1.75")134 SY$14.23$40.00
848E50320 EXISTING CONCRETE OVERLAY REMOVED (1.75")485 SY$12.30$15.00
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$8,475$8,500
614E11000 MAINTAINING TRAFFIC1 LS$5,250$15,000
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$3,915$6,500

Project details

Description
MRW-SR 95-(01.92) (03.40)
Type of work
Bridge

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →