BID #264002 · ODOTRESULT · awarded Jan 15

HOL-SR 39-00.25

HOL County · est $0.5M

Bid dateThursday, January 15
Awarded toV O MENUEZ & SON INC$355,965.7
read → connected → answeredcassandri

Project scope

Bid form · ODOT

56ITEMS
  • Earthwork20%
  • Structures / Bridge18%
  • Drainage11%
  • Maintaining Traffic11%
  • Erosion & Landscaping9%
  • Aggregate & Base5%
  • Other27%

Top items by winning bid

ItemQtyUnit priceExtended%
611E95601 12' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN (DES57 FT$1,257$72k20%
202E11000 STRUCTURE REMOVED1 LS$28,128$28k8%
613E41200 LOW STRENGTH MORTAR BACKFILL Section 8 - STRUCTURE 20 FOOT SPAN AND UNDER (SFN 38 - Totals Awd $190,429.71 2 $270,869.00 3 $267,178.00 4 $254,764.50 5 $247,218.00 6 $315,009.00 7 $258,329.00114 CY$200$23k6%
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)58 CY$374$22k6%
511E46510 CLASS QC1 CONCRETE, FOOTING35 CY$560$20k6%
614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC40 CY$400$16k4%
619E16010 FIELD OFFICE, TYPE B6 MNTH$2,322$14k4%
511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI14 CY$955.54$13k4%
441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 Section 4 - PAVEMENT - Totals Awd $53,583.48 2 $57,766.00 3 $52,725.00 4 $58,638.01 5 $56,605.00 6 $74,761.00 7 $97,240.00449 (23 CY$440$10k3%
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $19,587.17 2 $22,518.50 3 $22,646.03 4 $23,046.25 5 $19,272.55 6 $18,876.00 7 $30,981.4010,000 EACH$1$10k3%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 36 more items below.

Rank 1V O Menuez & Son INC$356kRank 2Mc Connell Contracting INC$445kRank 3Crawford Construction Company INC$460kRank 4Bcc Ohio INC$461kRank 5Advanced Excavating & Demolition$531kRank 6LLC Black Horse Bridge Construction INC$543kRank 7R C Construction Company And Son$595k
ItemQuantityR1V O Menuez & Son INCR2Mc Connell Contracting INCR3Crawford Construction Company INCR4Bcc Ohio INCR5Advanced Excavating & DemolitionR6LLC Black Horse Bridge Construction INCR7R C Construction Company And Son
611E95601 12' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN (DES57 FT$1,257$1,600$1,340$1,277$1,500$1,600$1,200
202E11000 STRUCTURE REMOVED1 LS$28,128$33,000$42,000$32,370$24,000$23,000$35,000
613E41200 LOW STRENGTH MORTAR BACKFILL Section 8 - STRUCTURE 20 FOOT SPAN AND UNDER (SFN 38 - Totals Awd $190,429.71 2 $270,869.00 3 $267,178.00 4 $254,764.50 5 $247,218.00 6 $315,009.00 7 $258,329.00114 CY$200$105$166$197$175$190$210
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)58 CY$374$375$438$368$400$368$750
511E46510 CLASS QC1 CONCRETE, FOOTING35 CY$560$1,700$870$1,293$500$750$1,100
614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC40 CY$400$85.00$300$499$350$250$10.00
619E16010 FIELD OFFICE, TYPE B6 MNTH$2,322$500$850$4,625$1,200$1,000$100
511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI14 CY$956$1,200$1,360$1,604$1,000$1,750$1,100
441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 Section 4 - PAVEMENT - Totals Awd $53,583.48 2 $57,766.00 3 $52,725.00 4 $58,638.01 5 $56,605.00 6 $74,761.00 7 $97,240.00449 (23 CY$440$525$308$525$475$971$850
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $19,587.17 2 $22,518.50 3 $22,646.03 4 $23,046.25 5 $19,272.55 6 $18,876.00 7 $30,981.4010,000 EACH$1.00$1.00$1.00$1.00$1.00$1.00$1.00
624E10000 MOBILIZATION Section 9 - INCIDENTALS - Totals Awd $35,220.00 2 $39,500.00 3 $53,400.00 4 $56,293.55 5 $112,200.00 6 $58,500.00 7 $110,600.001 LS$10,000$15,000$30,000$16,069$50,000$30,000$25,000
441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG16 CY$550$715$336$735$575$1,106$850
304E20000 AGGREGATE BASE76 CY$110$135$163$151$90.00$110$195
601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL56 CY$127$120$189$151$200$150$250
614E12420 DETOUR SIGNING1 LS$6,406$7,500$6,600$4,725$10,000$9,000$35,000
201E11000 CLEARING AND GRUBBING1 LS$5,831$2,500$2,600$2,446$25,000$7,530$10,000
203E10000 EXCAVATION305 CY$18.97$35.00$35.00$23.05$30.00$20.00$25.00
509E10000 EPOXY COATED STEEL REINFORCEMENT4,388 LB$1.24$3.25$3.00$2.28$3.50$4.00$3.00
512E33010 TYPE 3 WATERPROOFING97 SY$54.75$85.00$67.00$65.78$80.00$85.00$75.00
659E00300 TOPSOIL105 CY$46.00$85.00$71.00$64.80$50.00$61.00$10.00
Show all 56 line items
ItemQuantityR1V O Menuez & Son INCR2Mc Connell Contracting INCR3Crawford Construction Company INCR4Bcc Ohio INCR5Advanced Excavating & DemolitionR6LLC Black Horse Bridge Construction INCR7R C Construction Company And Son
202E23000 PAVEMENT REMOVED193 SY$7.50$20.00$22.00$9.82$25.00$60.00$30.00
202E38000 GUARDRAIL REMOVED277 FT$2.67$10.00$11.00$10.23$10.00$3.00$5.00
203E20000 EMBANKMENT240 CY$18.97$45.00$32.00$12.90$25.00$30.00$25.00
204E10000 SUBGRADE COMPACTION250 SY$3.30$3.50$4.00$4.68$2.50$5.00$2.00
204E45000 PROOF ROLLING Section 1 - ROADWAY - Totals Awd $19,517.74 2 $31,730.00 3 $29,348.00 4 $19,254.06 5 $48,720.00 6 $34,741.00 7 $31,400.001 HOUR$336$250$100$783$350$250$100
659E00100 SOIL ANALYSIS TEST2 EACH$165$100$125$63.00$150$400$10.00
659E10000 SEEDING AND MULCHING948 SY$4.25$3.25$5.00$6.30$3.60$1.50$20.00
659E14000 REPAIR SEEDING AND MULCHING47 SY$3.86$1.00$1.00$1.05$4.00$2.00$0.20
659E20000 COMMERCIAL FERTILIZER0.13 TON$1,375$850$531$525$900$1,000$2,900
659E31000 LIME0.2 ACRE$165$750$300$105$5.00$100$2,800
659E35000 WATER5 MGAL$1.00$1.00$5.00$1.05$0.75$1.00$1.00
605E11100 6" SHALLOW PIPE UNDERDRAINS137 FT$17.40$12.00$35.00$25.49$25.00$28.00$50.00
611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS22 FT$91.00$12.00$35.00$37.96$50.00$60.00$40.00
611E00900 6" CONDUIT, TYPE B Section 3 - DRAINAGE - Totals Awd $6,713.80 2 $2,628.00 3 $7,965.00 4 $6,126.65 5 $9,625.00 6 $7,256.00 7 $9,230.0060 FT$38.80$12.00$40.00$29.99$85.00$35.00$25.00
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 3")170 SY$22.00$12.00$11.00$10.50$30.00$28.00$30.00
407E10000 TACK COAT67 GAL$13.20$3.00$9.00$3.15$20.00$4.00$10.00
611E99660 MANHOLE RECONSTRUCTED TO GRADE Section 5 - SANITARY SEWER - Totals Awd $872.00 2 $2,500.00 3 $1,300.00 4 $9,120.00 5 $1,200.00 6 $2,800.00 7 $2,500.001 EACH$872$2,500$1,300$9,120$1,200$2,800$2,500
630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST19 FT$13.20$20.00$25.00$99.75$17.50$18.00$30.00
630E80100 SIGN, FLAT SHEET2 SF$55.00$125$50.00$142$125$125$300
642E30000 REMOVAL OF PAVEMENT MARKING56 FT$10.00$15.00$23.00$4.61$50.00$50.00$100
646E10010 EDGE LINE, 6"0.05 MILE$38,500$45,000$33,000$36,750$45,000$45,000$145,000
646E10200 CENTER LINE Section 6 - TRAFFIC CONTROL - Totals Awd $4,330.80 2 $6,270.00 3 $4,722.00 4 $5,691.91 5 $8,182.50 6 $8,192.00 7 $18,370.000.03 MILE$49,500$85,000$40,300$47,250$85,000$85,000$145,000
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST40 HOUR$82.50$10.00$50.00$81.90$92.00$85.00$25.00
616E10000 WATER Section 7 - MAINTENANCE OF TRAFFIC - Totals Awd $25,711.00 2 $11,305.00 3 $20,620.00 4 $27,983.25 5 $27,685.00 6 $22,405.00 7 $36,405.005 MGAL$1.00$1.00$4.00$6.45$1.00$1.00$1.00
202E98000 REMOVAL MISC.: OEPA NOTIFICATION OF DEMOLITION1 LS$235$350$500$545$500$250$4,000
203E10000 EXCAVATION154 CY$10.15$35.00$50.00$25.80$35.00$36.00$25.00
503E11100 COFFERDAMS AND EXCAVATION BRACING1 LS$1,000$7,500$5,000$12,429$12,000$62,000$15,000
503E21100 UNCLASSIFIED EXCAVATION158 CY$18.65$35.00$140$38.70$100$100$25.00
511E46610 CLASS QC1 CONCRETE, HEADWALL2 CY$1,053$2,000$1,900$1,884$2,675$1,400$1,100
512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE)56 SY$41.08$18.00$55.00$38.94$55.00$48.00$100
512E33000 TYPE 2 WATERPROOFING75 SY$30.00$35.00$57.00$33.13$70.00$28.00$50.00
516E13600 1" PREFORMED EXPANSION JOINT FILLER30 SF$7.00$15.00$17.00$10.45$30.00$10.00$50.00
518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC16 CY$275$145$197$180$230$170$175
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$4,600$6,500$5,000$5,690$10,000$6,500$40,000
614E11000 MAINTAINING TRAFFIC1 LS$3,500$10,000$8,600$2,554$30,000$6,000$30,000
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$3,188$5,000$4,700$4,230$15,000$10,000$15,000

Project details

Description
HOL-SR 39-00.25
Type of work
Drainage

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →