CLE-US 50-02.25
CLE County · est $0.8M
Bid dateThursday, March 26—
Awarded toPRUS CONSTRUCTION COMPANY$655,092.45
CLE County · est $0.8M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 2,108 CY | $46 | $97k | 15% |
| 511E53010 CLASS QC1 CONCRETE, MISC.: SEDIMENT BASIN | 84 CY | $1,050 | $88k | 13% |
| 601E11001 RIPRAP, TYPE D, AS PER PLAN, 9" THICK | 400 SY | $155 | $62k | 9% |
| 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO Section 1 - ROADWAY - Totals Awd $198,615.15 2 $150,866.91 3 $229,545.00 4 $189,155.00 5 $493,150.14 | 650 TON | $72.5 | $47k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $40k | 6% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $38,500 | $39k | 6% |
| 659E00300 TOPSOIL | 369 CY | $83.5 | $31k | 5% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 269 CY | $108 | $29k | 4% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $25,500 | $26k | 4% |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 200 CY | $115 | $23k | 4% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 36 more items below.
| Item | Quantity | R1Prus Construction Company | R2Sunesis Construction CO | R3Axis Civil Construction LLC | R4Kt Holden Construction LLC | R5John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 2,108 CY | $46.00 | $54.75 | $56.00 | $49.00 | $141 | 16% |
| 511E53010 CLASS QC1 CONCRETE, MISC.: SEDIMENT BASIN | 84 CY | $1,050 | $1,310 | $1,150 | $1,250 | $1,472 | 15% |
| 601E11001 RIPRAP, TYPE D, AS PER PLAN, 9" THICK | 400 SY | $155 | $225 | $225 | $225 | $760 | 11% |
| 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO Section 1 - ROADWAY - Totals Awd $198,615.15 2 $150,866.91 3 $229,545.00 4 $189,155.00 5 $493,150.14 | 650 TON | $72.50 | $10.00 | $101 | $54.50 | $164 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $9,622 | $12,000 | $20,300 | $97,612 | 7% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $38,500 | $38,117 | $28,000 | $96,270 | $101,237 | 7% |
| 659E00300 TOPSOIL | 369 CY | $83.50 | $65.00 | $65.00 | $65.00 | $75.91 | 5% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 269 CY | $108 | $234 | $135 | $200 | $284 | 5% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $25,500 | $2,617 | $15,000 | $29,200 | $54,072 | 4% |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 200 CY | $115 | $99.73 | $110 | $75.00 | $314 | 4% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $69,750.00 2 $57,109.91 3 $55,500.00 4 $78,925.00 5 $182,258.98 | 1 LS | $20,000 | $37,069 | $25,000 | $37,780 | $72,500 | 3% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $19,950 | $12,673 | $16,500 | $12,700 | $12,673 | 3% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $331,408.80 2 $402,941.48 3 $345,842.63 4 $447,708.05 5 $733,959.29 | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 518E21201 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLA | 72 CY | $168 | $182 | $140 | $153 | $258 | 2% |
| 671E15020 EROSION CONTROL MAT, TYPE C | 1,563 SY | $7.50 | $5.00 | $2.75 | $6.75 | $6.75 | 2% |
| 623E38550 MONUMENT ASSEMBLY, TYPE D | 4 EACH | $1,775 | $2,472 | $2,400 | $650 | $3,077 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,000 | $6,000 | $12,000 | $8,000 | $11,027 | 1% |
| 607E98200 FENCE, MISC.: TEMPORARY CHAIN LINK FENCE | 1 LS | $5,885 | $5,346 | $5,346 | $5,346 | $5,346 | 1% |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 215 FT | $25.00 | $6.49 | $15.00 | $14.00 | $72.57 | 1% |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 35 FT | $150 | $80.28 | $150 | $150 | $150 | 1% |
| Item | Quantity | R1Prus Construction Company | R2Sunesis Construction CO | R3Axis Civil Construction LLC | R4Kt Holden Construction LLC | R5John R Jurgensen Company |
|---|---|---|---|---|---|---|
| 202E75000 FENCE REMOVED | 261 FT | $6.65 | $1.84 | $8.00 | $6.00 | $6.00 |
| 202E98100 REMOVAL MISC.: POST WITH ELECTRIC OUTLET | 2 EACH | $660 | $310 | $1,000 | $500 | $1,324 |
| 203E20000 EMBANKMENT | 23 CY | $95.50 | $25.38 | $100 | $56.00 | $100 |
| 607E61201 GATE, TYPE CLT, AS PER PLAN, 12' GATE | 1 EACH | $3,050 | $2,771 | $2,771 | $2,771 | $2,771 |
| 607E61201 GATE, TYPE CLT, AS PER PLAN, 2 - 12' GATES | 1 EACH | $5,000 | $4,546 | $4,546 | $4,546 | $4,546 |
| 607E98100 FENCE, MISC.: GATE REMOVAL AND REINSTALLATION | 1 EACH | $2,150 | $1,946 | $1,946 | $1,946 | $1,946 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 1 EACH | $585 | $156 | $250 | $175 | $1,055 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $34.00 | $37.24 | $25.00 | $28.00 | $86.84 |
| 659E10000 SEEDING AND MULCHING | 1,767 SY | $2.25 | $3.35 | $1.75 | $2.05 | $2.05 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN, STREAMBANKS | 1,563 SY | $2.25 | $5.00 | $3.75 | $2.05 | $2.05 |
| 659E14000 REPAIR SEEDING AND MULCHING | 88 SY | $2.25 | $3.35 | $1.00 | $2.05 | $2.05 |
| 659E14001 REPAIR SEEDING AND MULCHING, AS PER PLAN, STREAMBA | 78 SY | $2.25 | $5.00 | $3.75 | $2.05 | $2.05 |
| 659E15000 INTER-SEEDING | 88 SY | $1.15 | $3.35 | $0.01 | $1.00 | $1.00 |
| 659E15001 INTER-SEEDING, AS PER PLAN, STREAMBANKS | 78 SY | $1.15 | $5.00 | $3.75 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.49 TON | $1,025 | $760 | $1,500 | $925 | $925 |
| 659E31000 LIME | 0.69 ACRE | $85.00 | $50.00 | $200 | $75.00 | $75.00 |
| 659E35000 WATER | 19 MGAL | $1.00 | $50.00 | $1.00 | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,750 | $3,400 | $3,400 | $4,000 | $3,400 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $4,275 | $5,830 | $6,420 | $12,840 | $11,640 |
| 611E04900 12" CONDUIT, TYPE D Section 3 - DRAINAGE - Totals Awd $5,040.00 2 $2,654.96 3 $3,500.00 4 $2,380.00 5 $7,537.32 | 28 FT | $180 | $94.82 | $125 | $85.00 | $269 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 51 FT | $45.00 | $15.50 | $15.50 | $41.00 | $41.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $61.00 | $45.00 | $45.00 | $55.00 | $55.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $61.00 | $25.00 | $25.00 | $55.00 | $55.00 |
| 630E97700 SIGNING, MISC.:REMOVAL AND RE-ERECTION OF MIAMI TO Section 4 - TRAFFIC CONTROL - Totals Awd $3,141.00 2 $1,370.50 3 $1,370.50 4 $2,856.00 5 $2,856.00 | 1 EACH | $358 | $300 | $300 | $325 | $325 |
| 661E00101 TREE SEEDLING, AS PER PLAN, 1-GAL, AMERICAN SYCAMO | 20 EACH | $101 | $60.00 | $115 | $92.00 | $92.00 |
| 661E00101 TREE SEEDLING, AS PER PLAN, 1-GAL, BLACK WILLOW | 20 EACH | $101 | $60.00 | $115 | $92.00 | $92.00 |
| 661E00101 TREE SEEDLING, AS PER PLAN, 1-GAL, EASTERN COTTONW | 20 EACH | $101 | $60.00 | $115 | $92.00 | $92.00 |
| 661E00101 TREE SEEDLING, AS PER PLAN, 1-GAL, SILVER MAPLE | 20 EACH | $101 | $60.00 | $115 | $92.00 | $92.00 |
| 661E99900 PLANTING, MISC.: LIVE STAKES, AMERICAN SYCAMORE | 125 EACH | $12.50 | $35.00 | $45.00 | $11.15 | $11.15 |
| 661E99900 PLANTING, MISC.: LIVE STAKES, ARROWWOOD | 125 EACH | $12.50 | $35.00 | $45.00 | $11.15 | $11.15 |
| 661E99900 PLANTING, MISC.: LIVE STAKES, BLACK WILLOW Section 5 - LANDSCAPING - Totals Awd $12,767.50 2 $17,925.00 3 $26,075.00 4 $11,541.25 5 $11,541.25 | 125 EACH | $12.50 | $35.00 | $45.00 | $11.15 | $11.15 |
| 616E10000 WATER Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $23,660.00 2 $19,962.44 3 $22,012.00 4 $15,444.00 5 $64,080.36 | 12 MGAL | $55.00 | $1.37 | $1.00 | $37.00 | $100 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 8 SY | $325 | $219 | $150 | $150 | $150 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 4 SF | $225 | $669 | $200 | $200 | $200 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE Section 7 - STRUCTURE REPAIR (CLE-50-2.250) - Totals Awd $10,710.00 2 $9,554.60 3 $7,610.00 4 $7,610.00 5 $7,570.00 | 8 SY | $245 | $290 | $45.00 | $45.00 | $40.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,750 | $4,418 | $6,500 | $12,845 | $1,120 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →