Project scope

Bid form · ODOT

16ITEMS
  • Earthwork19%
  • Removal & Demolition13%
  • Drainage13%
  • Structures / Bridge13%
  • Mobilization & General13%
  • Maintaining Traffic13%
  • Other19%

Top items by winning bid

ItemQtyUnit priceExtended%
690E98800 SPECIAL - 2 TO 4 TON ARMOR STONE780 TON$143.5$112k35%
253E90100 PAVEMENT REPAIR, MISC.: FULL DEPTH REPLACEMENT Section 4 - PAVEMENT - Totals Awd $55,950.40 2 $16,830.00 3 $66,000.00 4 $8,250.00 5 $32,450.00 6 $41,105.3555 SY$1,017$56k17%
203E10000 EXCAVATION Section 1 - ROADWAY - Totals Awd $43,066.87 2 $24,875.00 3 $91,200.00 4 $24,486.00 5 $134,426.35 6 $112,629.82700 CY$55$39k12%
624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $49,264.00 2 $134,500.00 3 $58,000.00 4 $97,600.00 5 $148,075.00 6 $226,396.971 LS$32,500$33k10%
601E30000 DUMPED ROCK FILL, MISC.:TYPE C160 TON$143.5$23k7%
690E98800 SPECIAL - 4 TO 6 TON TOE STONE130 TON$143.5$19k6%
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $171,841.70 2 $151,000.00 3 $145,161.20 4 $417,195.00 5 $408,541.00 6 $387,025.9512,000 EACH$1$12k4%
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$7,920$8k2%
614E11000 MAINTAINING TRAFFIC1 LS$5,220$5k2%
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$3,624$4k1%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 16items by winning bid’s extended amount.

Rank 1Shoreline Contractors$323kRank 2Great Lakes Demolition Company$335kRank 3Mason Dixon Energy Services LLC$366kRank 4Geo Gradel CO$578kRank 5Ebony Construction CO$729kRank 6Madex Construction CO$790k
ItemQuantityR1Shoreline ContractorsR2Great Lakes Demolition CompanyR3Mason Dixon Energy Services LLCR4Geo Gradel COR5Ebony Construction COR6Madex Construction CO
690E98800 SPECIAL - 2 TO 4 TON ARMOR STONE780 TON$144$120$102$325$294$287
253E90100 PAVEMENT REPAIR, MISC.: FULL DEPTH REPLACEMENT Section 4 - PAVEMENT - Totals Awd $55,950.40 2 $16,830.00 3 $66,000.00 4 $8,250.00 5 $32,450.00 6 $41,105.3555 SY$1,017$306$1,200$150$590$747
203E10000 EXCAVATION Section 1 - ROADWAY - Totals Awd $43,066.87 2 $24,875.00 3 $91,200.00 4 $24,486.00 5 $134,426.35 6 $112,629.82700 CY$55.00$30.00$120$20.00$188$146
624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $49,264.00 2 $134,500.00 3 $58,000.00 4 $97,600.00 5 $148,075.00 6 $226,396.971 LS$32,500$120,000$30,000$71,300$101,900$156,050
601E30000 DUMPED ROCK FILL, MISC.:TYPE C160 TON$144$80.00$115$295$360$273
690E98800 SPECIAL - 4 TO 6 TON TOE STONE130 TON$144$120$150$398$613$438
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $171,841.70 2 $151,000.00 3 $145,161.20 4 $417,195.00 5 $408,541.00 6 $387,025.9512,000 EACH$1.00$1.00$1.00$1.00$1.00$1.00
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$7,920$4,500$4,000$8,300$14,128$27,206
614E11000 MAINTAINING TRAFFIC1 LS$5,220$3,500$12,000$8,000$16,324$16,983
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$3,624$6,500$12,000$10,000$15,723$26,158
202E98100 REMOVAL MISC.:3' X 3' X 6' CONCRETE BLOCK RELOCATI43 EACH$67.53$200$100$465$357$572
202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER49 FT$54.36$25.00$55.00$108$34.75$93.51
611E04600 12" CONDUIT, TYPE C, 748.06 Section 3 - DRAINAGE - Totals Awd $2,663.64 2 $8,036.00 3 $5,390.00 4 $30,870.00 5 $5,635.00 6 $22,479.2449 FT$54.36$164$110$630$115$459
602E98300 MASONRY, MISC.:3' X 3' X 6' CONCRETE BLOCK9 EACH$281$400$1,200$3,000$1,300$1,978
202E23000 PAVEMENT REMOVED53 SY$35.91$50.00$85.00$98.00$21.20$106
204E50000 GEOTEXTILE FABRIC480 SY$1.80$10.00$2.00$12.00$6.00$16.78

Project details

Description
OTT-SR 357-02.30 Repair
Type of work
Maintenance

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →