MOT-MCD South River Walk
MOT County · est $0.5M
Bid dateThursday, April 23—
Awarded toDOUBLE JAY CONSTRUCTION INC$561,768
MOT County · est $0.5M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E98000 ROADWAY, MISC.:4" CRUSHED LIMESTONE, AS PER PLAN | 362 CY | $202.65 | $73k | 13% |
| 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN 16' | 23 EACH | $2,945 | $68k | 12% |
| 203E98600 ROADWAY, MISC.:SWING | 4 EACH | $15,542 | $62k | 11% |
| 625E27551 LUMINAIRE, DECORATIVE, AS PER PLAN DARK SKY | 23 EACH | $2,565 | $59k | 11% |
| 203E10001 EXCAVATION, AS PER PLAN | 362 CY | $131.2 | $47k | 8% |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 9,628 FT | $3.45 | $33k | 6% |
| 203E98600 ROADWAY, MISC.:BENCH | 9 EACH | $3,017 | $27k | 5% |
| 680E14550 SPECIAL - TRASH RECEPTACLESPECIAL; TRASH RECEPTACL Section 1 - ROADWAY - Totals Awd $278,666.75 2 $347,469.00 | 7 EACH | $3,537 | $25k | 4% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $19,150 | $19k | 3% |
| 624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $48,368.40 2 $54,500.00 | 1 LS | $15,378 | $15k | 3% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 18 more items below.
| Item | Quantity | R1Double Jay Construction INC | R2Complete General Construction Company | % of bid |
|---|---|---|---|---|
| 203E98000 ROADWAY, MISC.:4" CRUSHED LIMESTONE, AS PER PLAN | 362 CY | $203 | $160 | 14% |
| 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN 16' | 23 EACH | $2,945 | $2,400 | 13% |
| 203E98600 ROADWAY, MISC.:SWING | 4 EACH | $15,542 | $36,000 | 12% |
| 625E27551 LUMINAIRE, DECORATIVE, AS PER PLAN DARK SKY | 23 EACH | $2,565 | $2,350 | 12% |
| 203E10001 EXCAVATION, AS PER PLAN | 362 CY | $131 | $56.00 | 9% |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 9,628 FT | $3.45 | $3.00 | 7% |
| 203E98600 ROADWAY, MISC.:BENCH | 9 EACH | $3,017 | $3,700 | 5% |
| 680E14550 SPECIAL - TRASH RECEPTACLESPECIAL; TRASH RECEPTACL Section 1 - ROADWAY - Totals Awd $278,666.75 2 $347,469.00 | 7 EACH | $3,537 | $3,900 | 5% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $19,150 | $6,000 | 4% |
| 624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $48,368.40 2 $54,500.00 | 1 LS | $15,378 | $35,000 | 3% |
| 625E75401 LIGHT POLE REMOVED, AS PER PLAN | 45 EACH | $228 | $500 | 2% |
| 625E31600 PULL BOX, MISC.: 725.12, SIZE 14"X14"x12" | 21 EACH | $468 | $1,000 | 2% |
| 625E34451 CONTROL CENTER CABINET, COMPLETE, AS PER PLAN | 1 EACH | $9,291 | $20,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,120 | $10,500 | 2% |
| 204E10000 SUBGRADE COMPACTION | 3,275 SY | $2.55 | $5.00 | 2% |
| 625E23304 NO. 8 AWG 600 VOLT DISTRIBUTION CABLE | 2,445 FT | $3.20 | $2.00 | 2% |
| 680E14000 SPECIAL - PICNIC TABLE AND SLABSPECIAL: PICNIC TAB | 2 EACH | $3,786 | $4,800 | 1% |
| 625E75501 LIGHT POLE FOUNDATION REMOVED, AS PER PLAN | 15 EACH | $456 | $750 | 1% |
| 625E10615 LIGHT POLE ANCHOR BOLTS ON STRUCTURE, AS PER PLAN | 92 EACH | $69.00 | $125 | 1% |
| 608E15001 8" CONCRETE WALK, AS PER PLAN | 226 SF | $26.95 | $43.00 | 1% |
| Item | Quantity | R1Double Jay Construction INC | R2Complete General Construction Company |
|---|---|---|---|
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $5,826 | $2,000 |
| 202E30001 WALK REMOVED, AS PER PLAN | 186 SF | $2.75 | $38.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 66 CY | $90.10 | $28.00 |
| 203E98600 ROADWAY, MISC.:DOG WASTE STATION | 4 EACH | $893 | $1,800 |
| 608E13001 6" CONCRETE WALK, AS PER PLAN | 286 SF | $20.50 | $38.00 |
| 653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN | 17 CY | $89.00 | $130 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 74 SY | $15.80 | $37.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $2,300 | $3,000 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $3,728.20 2 $6,045.00 | 1,000 EACH | $1.00 | $1.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 25 EACH | $160 | $225 |
| 625E23410 NO. 12 AWG POLE AND BRACKET CABLE | 368 FT | $1.15 | $1.75 |
| 625E25604 CONDUIT, 4", 725.051 | 210 FT | $10.30 | $52.00 |
| 625E32000 GROUND ROD | 21 EACH | $137 | $200 |
| 625E75507 LUMINAIRE REMOVED, AS PER PLAN | 45 EACH | $92.00 | $50.00 |
| 625E75511 POWER SERVICE REMOVED, AS PER PLAN | 2 EACH | $912 | $1,350 |
| 625E75550 DISTRIBUTION CABLE REMOVED Section 3 - LIGHTING - Totals Awd $229,282.65 2 $258,672.00 | 3,059 FT | $1.15 | $1.00 |
| 614E12421 DETOUR SIGNING, AS PER PLAN Section 4 - TRAFFIC CONTROL - Totals Awd $1,722.00 2 $8,500.00 | 1 LS | $1,722 | $8,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,720 | $3,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →