BID #260209 · ODOTRESULT · awarded Apr 23

MOT-MCD South River Walk

MOT County · est $0.5M

Bid dateThursday, April 23
Awarded toDOUBLE JAY CONSTRUCTION INC$561,768
read → connected → answeredcassandri

Project scope

Bid form · ODOT

38ITEMS
  • Signals & Lighting34%
  • Erosion & Landscaping11%
  • Curb, Walk & Ramp8%
  • Earthwork8%
  • Maintaining Traffic8%
  • Mobilization & General5%
  • Other26%

Top items by winning bid

ItemQtyUnit priceExtended%
203E98000 ROADWAY, MISC.:4" CRUSHED LIMESTONE, AS PER PLAN362 CY$202.65$73k13%
625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN 16'23 EACH$2,945$68k12%
203E98600 ROADWAY, MISC.:SWING4 EACH$15,542$62k11%
625E27551 LUMINAIRE, DECORATIVE, AS PER PLAN DARK SKY23 EACH$2,565$59k11%
203E10001 EXCAVATION, AS PER PLAN362 CY$131.2$47k8%
625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE9,628 FT$3.45$33k6%
203E98600 ROADWAY, MISC.:BENCH9 EACH$3,017$27k5%
680E14550 SPECIAL - TRASH RECEPTACLESPECIAL; TRASH RECEPTACL Section 1 - ROADWAY - Totals Awd $278,666.75 2 $347,469.007 EACH$3,537$25k4%
614E11001 MAINTAINING TRAFFIC, AS PER PLAN1 LS$19,150$19k3%
624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $48,368.40 2 $54,500.001 LS$15,378$15k3%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 18 more items below.

Rank 1Double Jay Construction INC$562kRank 2Complete General Construction Company$675k
ItemQuantityR1Double Jay Construction INCR2Complete General Construction Company
203E98000 ROADWAY, MISC.:4" CRUSHED LIMESTONE, AS PER PLAN362 CY$203$160
625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN 16'23 EACH$2,945$2,400
203E98600 ROADWAY, MISC.:SWING4 EACH$15,542$36,000
625E27551 LUMINAIRE, DECORATIVE, AS PER PLAN DARK SKY23 EACH$2,565$2,350
203E10001 EXCAVATION, AS PER PLAN362 CY$131$56.00
625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE9,628 FT$3.45$3.00
203E98600 ROADWAY, MISC.:BENCH9 EACH$3,017$3,700
680E14550 SPECIAL - TRASH RECEPTACLESPECIAL; TRASH RECEPTACL Section 1 - ROADWAY - Totals Awd $278,666.75 2 $347,469.007 EACH$3,537$3,900
614E11001 MAINTAINING TRAFFIC, AS PER PLAN1 LS$19,150$6,000
624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $48,368.40 2 $54,500.001 LS$15,378$35,000
625E75401 LIGHT POLE REMOVED, AS PER PLAN45 EACH$228$500
625E31600 PULL BOX, MISC.: 725.12, SIZE 14"X14"x12"21 EACH$468$1,000
625E34451 CONTROL CENTER CABINET, COMPLETE, AS PER PLAN1 EACH$9,291$20,000
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$9,120$10,500
204E10000 SUBGRADE COMPACTION3,275 SY$2.55$5.00
625E23304 NO. 8 AWG 600 VOLT DISTRIBUTION CABLE2,445 FT$3.20$2.00
680E14000 SPECIAL - PICNIC TABLE AND SLABSPECIAL: PICNIC TAB2 EACH$3,786$4,800
625E75501 LIGHT POLE FOUNDATION REMOVED, AS PER PLAN15 EACH$456$750
625E10615 LIGHT POLE ANCHOR BOLTS ON STRUCTURE, AS PER PLAN92 EACH$69.00$125
608E15001 8" CONCRETE WALK, AS PER PLAN226 SF$26.95$43.00
Show all 38 line items
ItemQuantityR1Double Jay Construction INCR2Complete General Construction Company
202E11001 STRUCTURE REMOVED, AS PER PLAN1 LS$5,826$2,000
202E30001 WALK REMOVED, AS PER PLAN186 SF$2.75$38.00
203E20001 EMBANKMENT, AS PER PLAN66 CY$90.10$28.00
203E98600 ROADWAY, MISC.:DOG WASTE STATION4 EACH$893$1,800
608E13001 6" CONCRETE WALK, AS PER PLAN286 SF$20.50$38.00
653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN17 CY$89.00$130
659E10001 SEEDING AND MULCHING, AS PER PLAN74 SY$15.80$37.50
659E20000 COMMERCIAL FERTILIZER0.02 TON$2,300$3,000
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $3,728.20 2 $6,045.001,000 EACH$1.00$1.00
625E00450 CONNECTION, FUSED PULL APART25 EACH$160$225
625E23410 NO. 12 AWG POLE AND BRACKET CABLE368 FT$1.15$1.75
625E25604 CONDUIT, 4", 725.051210 FT$10.30$52.00
625E32000 GROUND ROD21 EACH$137$200
625E75507 LUMINAIRE REMOVED, AS PER PLAN45 EACH$92.00$50.00
625E75511 POWER SERVICE REMOVED, AS PER PLAN2 EACH$912$1,350
625E75550 DISTRIBUTION CABLE REMOVED Section 3 - LIGHTING - Totals Awd $229,282.65 2 $258,672.003,059 FT$1.15$1.00
614E12421 DETOUR SIGNING, AS PER PLAN Section 4 - TRAFFIC CONTROL - Totals Awd $1,722.00 2 $8,500.001 LS$1,722$8,500
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$4,720$3,000

Project details

Description
MOT-MCD South River Walk
Type of work
Maintenance

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →