D01-BM FY26
D01 County · est $0.9M
Bid dateThursday, February 19—
Awarded toBCC OHIO INC$815,071.57
D01 County · est $0.9M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $63,545 | $64k | 8% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION (T=1") | 267 SY | $228.03 | $61k | 7% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 133 SY | $452.39 | $60k | 7% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 889 SY | $63 | $56k | 7% |
| 624E10000 MOBILIZATION Section 10 - INCIDENTALS - Totals Awd $128,083.37 2 $133,000.00 3 $140,000.00 4 $200,000.00 | 1 LS | $54,476 | $54k | 7% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 192 FT | $275.15 | $53k | 6% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 176 FT | $275.94 | $49k | 6% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 176 FT | $275.94 | $49k | 6% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 267 SY | $177.5 | $47k | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 79 CY | $472.5 | $37k | 5% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 37 more items below.
| Item | Quantity | R1Bcc Ohio INC | R2Complete General Construction Company | R3Ohio Concrete Maintenance LLC | R4Eagle Bridge CO | % of bid |
|---|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $63,545 | $85,000 | $40,000 | $130,000 | 9% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION (T=1") | 267 SY | $228 | $190 | $288 | $250 | 9% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 133 SY | $452 | $450 | $375 | $500 | 8% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 889 SY | $63.00 | $60.00 | $70.00 | $57.00 | 8% |
| 624E10000 MOBILIZATION Section 10 - INCIDENTALS - Totals Awd $128,083.37 2 $133,000.00 3 $140,000.00 4 $200,000.00 | 1 LS | $54,476 | $40,000 | $85,000 | $50,000 | 8% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 192 FT | $275 | $300 | $275 | $315 | 7% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 176 FT | $276 | $300 | $250 | $325 | 7% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 176 FT | $276 | $300 | $250 | $325 | 7% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 267 SY | $178 | $160 | $179 | $300 | 7% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 79 CY | $473 | $450 | $500 | $445 | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,056 FT | $30.07 | $29.00 | $30.00 | $25.00 | 4% |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 2.25 MILE | $10,660 | $10,153 | $13,500 | $10,000 | 3% |
| 519E11900 SPECIAL - PATCHING CONCRETE STRUCTURE: ABUTMENT BA | 5 CY | $4,758 | $5,900 | $4,000 | $9,000 | 3% |
| 452E18010 15" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P Section 3 - PAVEMENT - Totals Awd $89,469.80 2 $91,250.00 3 $109,425.00 4 $88,223.00 | 85 SY | $216 | $250 | $280 | $300 | 3% |
| 848E50000 HAND CHIPPING | 80 SY | $193 | $95.00 | $130 | $90.00 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" | 1,907 SY | $7.35 | $7.00 | $7.75 | $6.75 | 2% |
| 253E02000 PAVEMENT REPAIR | 15 CY | $893 | $850 | $925 | $435 | 2% |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED (T = 2") Section 6 - STRUCTURE REPAIR (HAN-15-22.46R, SFN 320 - Totals Awd $261,891.55 2 $241,389.43 3 $248,752.00 4 $319,320.50 | 267 SY | $49.82 | $35.00 | $42.00 | $55.00 | 2% |
| 601E34100 ROCK CHANNEL PROTECTION, TYPE B WITHOUT FILTER Section 5 - STRUCTURE REPAIR (DEF-15-10.52, SFN 2000 - Totals Awd $24,576.28 2 $60,250.00 3 $37,100.00 4 $61,075.00 | 65 CY | $194 | $185 | $175 | $350 | 2% |
| 202E22900 APPROACH SLAB REMOVED | 133 SY | $95.04 | $80.00 | $60.00 | $80.00 | 2% |
| Item | Quantity | R1Bcc Ohio INC | R2Complete General Construction Company | R3Ohio Concrete Maintenance LLC | R4Eagle Bridge CO |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING Section 1 - ROADWAY - Totals Awd $2,580.00 2 $5,000.00 3 $5,000.00 4 $10,000.00 | 1 LS | $2,580 | $5,000 | $5,000 | $10,000 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $1,000.00 2 $1,000.00 3 $1,000.00 4 $1,000.00 | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 202E23000 PAVEMENT REMOVED | 85 SY | $14.57 | $40.00 | $100 | $45.00 |
| 204E10000 SUBGRADE COMPACTION | 85 SY | $5.16 | $6.00 | $12.00 | $20.00 |
| 407E20000 NON-TRACKING TACK COAT | 153 GAL | $1.05 | $1.00 | $1.25 | $3.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 15 HOUR | $88.20 | $95.00 | $120 | $140 |
| 614E11630 INCREASED BARRIER DELINEATION | 200 FT | $1.85 | $2.00 | $3.00 | $1.75 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,184 | $2,500 | $3,750 | $2,281 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE WAY) | 22 EACH | $13.37 | $13.00 | $12.00 | $12.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 22 EACH | $21.93 | $21.00 | $23.00 | $20.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $1,007 | $960 | $1,200 | $1,000 |
| 614E21400 WORK ZONE CENTER LINE, CLASS II | 0.8 MILE | $2,730 | $2,600 | $1,400 | $2,600 |
| 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 2,860 FT | $1.03 | $1.00 | $5.00 | $1.50 |
| 616E10000 WATER | 6 MGAL | $2.48 | $115 | $20.00 | $20.00 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 5,720 FT | $1.21 | $1.00 | $1.75 | $2.25 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY Section 4 - MAINTENANCE OF TRAFFIC - Totals Awd $132,789.18 2 $128,183.25 3 $161,145.50 4 $131,862.25 | 4 SNMT | $654 | $725 | $900 | $850 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 43 SY | $43.56 | $75.00 | $75.00 | $75.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 180 SF | $55.90 | $250 | $125 | $195 |
| 509E10001 EPOXY COATED STEEL REINFORCEMENT, AS PER PLAN | 947 LB | $1.83 | $2.69 | $2.00 | $2.50 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 190 EACH | $29.88 | $20.00 | $25.00 | $40.00 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 20 SY | $42.66 | $100 | $150 | $100 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 39 SF | $7.41 | $13.00 | $20.00 | $7.00 |
| 516E31010 2" DEEP JOINT SEALER | 112 FT | $24.99 | $25.00 | $10.00 | $15.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 150 FT | $18.76 | $25.00 | $27.00 | $20.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 26 SF | $155 | $300 | $150 | $275 |
| 848E30201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 5 CY | $525 | $250 | $400 | $275 |
| 848E50100 TEST SLAB | 1 LS | $3,537 | $1,800 | $600 | $500 |
| 848E50200 FULL-DEPTH REPAIR | 5 CY | $783 | $950 | $500 | $500 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 31 SY | $42.66 | $75.00 | $75.00 | $75.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN Section 7 - STRUCTURE REPAIR (VAN-224-8.13, SFN 8102 - Totals Awd $53,921.16 2 $67,725.00 3 $52,625.00 4 $68,975.00 | 42 SF | $96.03 | $300 | $150 | $225 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 38 SY | $42.66 | $75.00 | $75.00 | $75.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 14 SF | $155 | $350 | $200 | $425 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA Section 8 - STRUCTURE REPAIR (VAN-224-8.38, SFN 8102 - Totals Awd $60,425.10 2 $70,950.00 3 $57,450.00 4 $77,960.00 | 52 SF | $155 | $200 | $150 | $230 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 38 SY | $42.66 | $75.00 | $75.00 | $75.00 |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 20 FT | $100 | $300 | $100 | $160 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN Section 9 - STRUCTURE REPAIR (VAN-224-8.65, SFN 8102 - Totals Awd $60,335.13 2 $73,950.00 3 $61,400.00 4 $74,030.00 | 25 SF | $155 | $300 | $150 | $300 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,062 | $8,000 | $15,000 | $20,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →