SUM-SR 91-07.89
SUM County · est $2.2M
Bid dateThursday, March 12—
Awarded toBLACK HORSE BRIDGE CONSTRUCTION INC$2.19M
SUM County · est $2.2M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 176 CY | $1,225 | $216k | 10% |
| 513E95020 STRUCTURAL STEEL, MISC.: SANITARY SEWER | 1 LS | $196,500 | $197k | 9% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $163,000 | $163k | 7% |
| 514E00100 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 1 LS | $135,000 | $135k | 6% |
| 513E95020 STRUCTURAL STEEL, MISC.: GAS MAIN SUPPORTS | 1 LS | $119,000 | $119k | 5% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 77,439 LB | $1.5 | $116k | 5% |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 81 FT | $1,400 | $113k | 5% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $143,190.00 2 $147,497.05 3 $228,500.00 | 1 LS | $100,000 | $100k | 5% |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 208 SY | $425 | $88k | 4% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $55,000 | $55k | 3% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 101 more items below.
| Item | Quantity | R1Black Horse Bridge Construction INC | R2Matt Winters Excavation LLC | R3Great Lakes Construction CO | % of bid |
|---|---|---|---|---|---|
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 176 CY | $1,225 | $1,155 | $1,700 | 13% |
| 513E95020 STRUCTURAL STEEL, MISC.: SANITARY SEWER | 1 LS | $196,500 | $255,000 | $250,000 | 12% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $163,000 | $197,000 | $250,000 | 10% |
| 514E00100 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 1 LS | $135,000 | $132,000 | $135,000 | 8% |
| 513E95020 STRUCTURAL STEEL, MISC.: GAS MAIN SUPPORTS | 1 LS | $119,000 | $155,000 | $126,500 | 7% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 77,439 LB | $1.50 | $1.75 | $1.75 | 7% |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 81 FT | $1,400 | $1,700 | $1,100 | 7% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $143,190.00 2 $147,497.05 3 $228,500.00 | 1 LS | $100,000 | $100,000 | $130,000 | 6% |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 208 SY | $425 | $500 | $450 | 5% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $55,000 | $48,000 | $60,000 | 3% |
| 530E00200 SPECIAL - STRUCTURES BYPASS PUMPING | 1 LS | $55,000 | $95,000 | $145,000 | 3% |
| 517E75121 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 195 FT | $280 | $250 | $400 | 3% |
| 514E00200 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 1 LS | $47,000 | $77,000 | $47,000 | 3% |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 29 CY | $1,550 | $1,350 | $1,400 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 198 CY | $190 | $200 | $190 | 2% |
| 514E00300 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 1 LS | $32,000 | $42,000 | $32,000 | 2% |
| 511E44111 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 28 CY | $1,100 | $1,350 | $1,725 | 2% |
| 514E00400 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 1 LS | $28,000 | $27,000 | $28,000 | 2% |
| 304E20000 AGGREGATE BASE | 191 CY | $130 | $110 | $135 | 1% |
| 513E90000 STRUCTURAL STEEL, MISC.: END CROSS FRAME RETROFIT | 820 LB | $28.00 | $30.00 | $25.00 | 1% |
| Item | Quantity | R1Black Horse Bridge Construction INC | R2Matt Winters Excavation LLC | R3Great Lakes Construction CO |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,500 | $35,000 | $4,400 |
| 202E23000 PAVEMENT REMOVED | 862 SY | $13.00 | $20.00 | $15.50 |
| 202E30000 WALK REMOVED | 1,030 SF | $2.00 | $10.00 | $4.00 |
| 202E32000 CURB REMOVED | 117 FT | $6.00 | $20.00 | $7.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 318 FT | $25.00 | $40.00 | $55.00 |
| 202E38000 GUARDRAIL REMOVED | 540 FT | $2.00 | $5.00 | $2.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $500 | $900 | $600 |
| 202E75000 FENCE REMOVED | 60 FT | $12.50 | $6.00 | $5.00 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 1 EACH | $250 | $190 | $1,250 |
| 202E98200 REMOVAL MISC.: CONDUIT | 30 FT | $9.00 | $7.00 | $60.00 |
| 203E10000 EXCAVATION | 356 CY | $38.00 | $35.00 | $65.00 |
| 203E20000 EMBANKMENT | 72 CY | $48.00 | $80.00 | $20.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 50 CY | $18.00 | $110 | $60.00 |
| 204E10000 SUBGRADE COMPACTION | 1,162 SY | $5.00 | $5.00 | $2.25 |
| 204E13000 EXCAVATION OF SUBGRADE | 11 CY | $35.00 | $62.00 | $130 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 11 CY | $115 | $140 | $125 |
| 204E45000 PROOF ROLLING | 1 HOUR | $250 | $350 | $382 |
| 204E50000 GEOTEXTILE FABRIC | 34 SY | $18.00 | $16.00 | $13.00 |
| 209E60200 LINEAR GRADING | 1 STA | $650 | $320 | $1,000 |
| 606E15050 GUARDRAIL, TYPE MGS | 262.5 FT | $21.20 | $22.00 | $21.20 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 2 EACH | $2,480 | $2,500 | $2,480 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,320 | $1,350 | $1,320 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,545 | $2,600 | $2,545 |
| 607E98000 FENCE, MISC.: WOOD FENCE | 60 FT | $83.50 | $85.00 | $83.50 |
| 608E10000 4" CONCRETE WALK | 1,000 SF | $14.00 | $11.00 | $19.50 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 1 EACH | $1,200 | $1,600 | $900 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 1 EACH | $950 | $1,600 | $210 |
| 690E21000 SPECIAL - AS-BUILT CONSTRUCTION RECORD DRAWINGS | 1 LS | $10,000 | $5,000 | $1,250 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATIONS Section 1 - ROADWAY - Totals Awd $121,629.00 2 $166,201.00 3 $132,758.70 | 1 LS | $10,000 | $3,100 | $2,500 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 4 SY | $190 | $142 | $330 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 1 CY | $600 | $325 | $600 |
| 659E00300 TOPSOIL | 88 CY | $80.00 | $65.00 | $60.00 |
| 659E10000 SEEDING AND MULCHING | 796 SY | $5.00 | $5.00 | $4.95 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $900 | $710 | $700 |
| 659E31000 LIME | 0.16 ACRE | $100 | $60.00 | $55.00 |
| 659E35000 WATER | 4 MGAL | $0.50 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $19,997.00 2 $18,184.70 3 $18,730.00 | 7,500 EACH | $1.00 | $1.00 | $1.00 |
| 605E05210 4" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 15 FT | $35.00 | $100 | $35.00 |
| 605E06020 4" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 543 FT | $35.00 | $30.00 | $27.00 |
| 611E00406 4" CONDUIT, TYPE F | 52 FT | $47.00 | $60.00 | $47.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 83 FT | $47.00 | $55.00 | $45.00 |
| 611E03300 10" CONDUIT, TYPE C | 57 FT | $145 | $76.00 | $175 |
| 611E04600 12" CONDUIT, TYPE C | 153 FT | $75.00 | $55.00 | $98.00 |
| 611E06100 15" CONDUIT, TYPE C | 124 FT | $95.00 | $71.00 | $135 |
| 611E97400 CONDUIT, MISC.: TYPE B FOR DRAINAGE DISCHARGE CONT | 10 FT | $24.00 | $120 | $70.00 |
| 611E97400 CONDUIT, MISC.: TYPE C FOR DRAINAGE DISCHARGE CONT | 10 FT | $18.00 | $140 | $80.00 |
| 611E97400 CONDUIT, MISC.: TYPE F FOR DRAINAGE DISCHARGE CONT | 10 FT | $18.00 | $155 | $55.00 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $4,750 | $5,000 | $4,900 |
| 611E99574 MANHOLE, NO. 3 | 3 EACH | $4,750 | $3,600 | $4,500 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $725 | $525 | $425 |
| 611E99720 INSPECTION WELL Section 3 - DRAINAGE - Totals Awd $80,245.00 2 $69,041.00 3 $87,874.00 | 1 EACH | $1,800 | $1,015 | $3,500 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 436 SY | $5.00 | $5.25 | $5.00 |
| 407E20000 NON-TRACKING TACK COAT | 194 GAL | $2.00 | $2.00 | $2.00 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 54 CY | $300 | $310 | $300 |
| 441E70200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (36 CY | $265 | $275 | $265 |
| 441E70801 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (1 CY | $500 | $550 | $500 |
| 609E24510 CURB, TYPE 4-C | 72 FT | $62.00 | $40.00 | $70.00 |
| 609E26000 CURB, TYPE 6 Section 4 - PAVEMENT - Totals Awd $106,282.00 2 $101,037.00 3 $108,965.00 | 192 FT | $55.00 | $40.00 | $61.00 |
| 620E00501 DELINEATOR, POST GROUND MOUNTED, AS PER PLAN | 1 EACH | $195 | $200 | $85.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 8 EACH | $12.00 | $13.00 | $12.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 10 EACH | $13.40 | $14.00 | $13.40 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 40 FT | $25.00 | $36.00 | $33.85 |
| 630E80100 SIGN, FLAT SHEET | 4 SF | $22.00 | $41.00 | $38.99 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $22.00 | $41.00 | $38.99 |
| 630E81100 SIGN ERECTED, FLAT SHEET | 7.5 SF | $40.00 | $25.00 | $56.02 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $30.00 | $21.00 | $16.68 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $95.00 | $66.00 | $127 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $40.00 | $26.00 | $22.24 |
| 646E10010 EDGE LINE, 6" | 0.21 MILE | $13,000 | $6,600 | $9,710 |
| 646E10200 CENTER LINE Section 5 - TRAFFIC CONTROL - Totals Awd $8,622.00 2 $6,318.50 3 $6,181.04 | 0.1 MILE | $35,000 | $22,500 | $12,975 |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 300 SY | $40.00 | $45.00 | $40.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $85.00 | $85.00 | $100 |
| 614E12420 DETOUR SIGNING | 1 LS | $12,300 | $9,600 | $9,168 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 9 SNMT | $1,000 | $1,000 | $1,002 |
| 616E10000 WATER Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $36,710.00 2 $35,510.00 3 $34,244.25 | 1 MGAL | $10.00 | $10.00 | $60.00 |
| 202E22900 APPROACH SLAB REMOVED | 133 SY | $52.00 | $125 | $55.00 |
| 202E23500 WEARING COURSE REMOVED | 627 SY | $11.00 | $18.00 | $7.50 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $100 | $8,000 | $400 |
| 503E21100 UNCLASSIFIED EXCAVATION | 117 CY | $110 | $47.00 | $220 |
| 509E25000 UNCOATED STEEL REINFORCEMENT | 1,459 LB | $2.50 | $5.00 | $2.30 |
| 509E30020 NO. 4 DEFORMED GFRP REINFORCEMENT | 10,399 FT | $2.00 | $2.00 | $1.20 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 260 EACH | $36.00 | $45.00 | $25.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 123 SY | $18.00 | $15.00 | $15.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 479 SY | $40.00 | $40.00 | $50.00 |
| 512E33000 TYPE 2 WATERPROOFING | 34 SY | $48.00 | $50.00 | $35.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 2,235 EACH | $5.00 | $4.10 | $4.00 |
| 513E21000 TRIMMING OF BEAM END | 5 EACH | $240 | $250 | $240 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 9 MNHR | $15.00 | $210 | $15.00 |
| 514E10000 FINAL INSPECTION REPAIR | 5 EACH | $150 | $155 | $150 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 13 SF | $14.00 | $18.00 | $40.00 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $1,850 | $1,700 | $1,950 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 5 EACH | $1,400 | $1,250 | $1,400 |
| 516E44301 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 5 EACH | $1,400 | $1,400 | $1,550 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 44 CY | $180 | $150 | $135 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 102 FT | $14.00 | $18.00 | $13.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 34 FT | $90.00 | $15.00 | $23.00 |
| 625E33000 STRUCTURE GROUNDING SYSTEM Section 7 - STRUCTURE OVER 20 FOOT SPAN (SUM-00091-0 - Totals Awd $1,671,813.00 2 $1,928,014.75 3 $2,026,238.25 | 1 EACH | $12,500 | $12,800 | $6,600 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $17,190 | $25,000 | $24,500 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $15,000 | $25,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,000 | $250 | $4,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,000 | $5,997 | $25,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →