Figure 0.1 · BRIEFING
BID #260077 · ODOTRESULT · awarded Feb 19

BRO-CR 62-00.42

BRO County · est $2.0M

Bid dateThursday, February 19
Awarded toCOMPLETE GENERAL CONSTRUCTION COMPANY$1.71M
read → connected → answeredcassandri

Project scope

Bid form · ODOT

81ITEMS
  • Structures / Bridge31%
  • Earthwork12%
  • Erosion & Landscaping7%
  • Drainage7%
  • Guardrail & Barrier6%
  • Aggregate & Base6%
  • Other30%

Top items by winning bid

ItemQtyUnit priceExtended%
511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK140 CY$1,200$168k10%
511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING151 CY$925$140k8%
515E15010 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M4 EACH$30,000$120k7%
515E15010 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M4 EACH$30,000$120k7%
524E94804 DRILLED SHAFTS, 42" DIAMETER, INTO BEDROCK130 FT$750$98k6%
509E10000 EPOXY COATED STEEL REINFORCEMENT61,921 LB$1.5$93k5%
624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $121,000.00 2 $113,700.00 3 $144,897.72 4 $160,700.001 LS$84,000$84k5%
202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN1 LS$80,000$80k5%
517E70000 RAILING (TWIN STEEL TUBE)270 FT$270$73k4%
526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1178 SY$350$62k4%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 61 more items below.

Rank 1Complete General Construction Company$1.71MRank 2Double Z Construction Company$1.92MRank 3Sunesis Construction CO$2.00MRank 4Prus Construction Company$2.25M
ItemQuantityR1Complete General Construction CompanyR2Double Z Construction CompanyR3Sunesis Construction COR4Prus Construction Company
511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK140 CY$1,200$1,765$2,152$1,600
511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING151 CY$925$940$1,137$1,365
515E15010 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M4 EACH$30,000$32,000$37,932$38,500
515E15010 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M4 EACH$30,000$32,000$37,932$38,500
524E94804 DRILLED SHAFTS, 42" DIAMETER, INTO BEDROCK130 FT$750$840$452$715
509E10000 EPOXY COATED STEEL REINFORCEMENT61,921 LB$1.50$1.75$1.90$1.70
624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $121,000.00 2 $113,700.00 3 $144,897.72 4 $160,700.001 LS$84,000$65,000$71,656$100,000
202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN1 LS$80,000$65,000$53,610$230,000
517E70000 RAILING (TWIN STEEL TUBE)270 FT$270$270$268$372
526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1178 SY$350$400$438$415
503E11100 COFFERDAMS AND EXCAVATION BRACING1 LS$55,000$80,000$8,852$65,500
511E41012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS22 CY$2,250$2,200$3,289$2,550
524E94902 DRILLED SHAFTS, 48" DIAMETER, ABOVE BEDROCK83 FT$595$740$529$735
511E33418 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE55 CY$875$1,000$1,780$1,592
894E10000 THERMAL INTEGRITY PROFILING (TIP) TEST Section 7 - STRUCTURE OVER 20 FOOT SPAN (BRO-C0062-0 - Totals Awd $1,426,221.50 2 $1,634,014.75 3 $1,710,038.98 4 $1,909,233.403 EACH$9,500$3,300$2,617$7,850
515E20000 INTERMEDIATE DIAPHRAGMS6 EACH$4,500$2,600$5,023$3,525
526E90030 TYPE C INSTALLATION66 FT$400$350$286$325
601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER290 CY$90.00$90.00$232$110
503E21300 UNCLASSIFIED EXCAVATION1 LS$25,000$75,000$48,827$35,325
840E23000 SELECT GRANULAR BACKFILL353 CY$70.00$120$113$120
Show all 81 line items
ItemQuantityR1Complete General Construction CompanyR2Double Z Construction CompanyR3Sunesis Construction COR4Prus Construction Company
201E11000 CLEARING AND GRUBBING1 LS$5,000$6,500$2,805$5,100
202E23000 PAVEMENT REMOVED190 SY$50.00$38.00$36.40$39.00
202E38000 GUARDRAIL REMOVED154 FT$2.00$2.00$25.45$11.40
202E53100 MAILBOX REMOVED7 EACH$35.00$35.00$104$125
203E10000 EXCAVATION250 CY$55.00$60.00$25.81$25.50
203E20000 EMBANKMENT121 CY$35.00$27.00$27.46$40.00
204E10000 SUBGRADE COMPACTION1,082 SY$9.00$8.00$3.71$2.15
606E15050 GUARDRAIL, TYPE MGS50 FT$29.20$30.00$48.94$35.25
606E26500 ANCHOR ASSEMBLY, TYPE T4 EACH$1,320$1,320$1,100$1,482
606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 12 EACH$2,450$2,450$2,100$2,622
606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN2 EACH$2,620$2,620$2,400$3,420
690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE Section 1 - ROADWAY - Totals Awd $61,196.00 2 $59,691.00 3 $44,878.09 4 $53,006.407 EACH$220$225$125$650
659E00300 TOPSOIL70 CY$25.00$65.00$89.28$100
659E10000 SEEDING AND MULCHING623 SY$5.70$10.00$8.35$8.81
659E14000 REPAIR SEEDING AND MULCHING31 SY$5.70$19.75$5.70$22.00
659E20000 COMMERCIAL FERTILIZER0.08 TON$1,250$500$1,250$570
659E31000 LIME0.13 ACRE$150$75.00$150$825
659E35000 WATER3 MGAL$1.00$1.00$1.00$1.00
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $10,600.30 2 $16,445.00 3 $16,750.85 4 $18,326.485,000 EACH$1.00$1.00$1.00$1.00
605E13402 6" UNCLASSIFIED PIPE UNDERDRAINS FOR SPRINGS50 FT$6.00$17.00$15.62$28.00
605E31100 AGGREGATE DRAINS137 FT$50.00$22.00$9.00$16.50
605E32200 AGGREGATE DRAINS FOR SPRINGS50 FT$5.00$15.00$20.11$16.75
611E99710 PRECAST REINFORCED CONCRETE OUTLET Section 3 - DRAINAGE - Totals Awd $8,100.00 2 $5,364.00 3 $3,992.74 4 $5,968.002 EACH$350$375$487$735
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3")590 SY$14.25$10.00$14.25$19.00
302E56000 ASPHALT CONCRETE BASE, PG64-22, (449)22 CY$325$550$325$656
304E20000 AGGREGATE BASE121 CY$175$125$141$89.50
407E10000 TACK COAT103 GAL$4.10$5.00$4.10$5.50
411E10000 STABILIZED CRUSHED AGGREGATE86 CY$95.00$165$137$159
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG65 CY$345$395$345$584
441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) Section 4 - PAVEMENT - Totals Awd $69,819.80 2 $76,955.00 3 $69,294.17 4 $93,868.00$345$575$345$875
630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST13.5 FT$40.00$15.50$15.50$20.00
630E80100 SIGN, FLAT SHEET14 SF$20.00$16.00$16.00$25.00
630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL3 EACH$45.00$20.00$20.00$17.10
630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION1 EACH$15.00$45.00$45.00$114
630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA4 EACH$65.00$25.00$25.00$28.50
644E00100 EDGE LINE, 4"0.2 MILE$11,340$11,340$11,340$11,400
644E00300 CENTER LINE Section 5 - TRAFFIC CONTROL - Totals Awd $5,766.00 2 $5,174.25 3 $5,174.25 4 $4,319.300.1 MILE$22,680$22,680$22,680$11,400
614E12420 DETOUR SIGNING1 LS$5,000$6,000$3,100$3,500
616E10000 WATER Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $5,150.00 2 $6,120.00 3 $3,807.40 4 $4,070.002 MGAL$75.00$60.00$354$285
202E23500 WEARING COURSE REMOVED348 SY$20.00$15.00$8.88$35.00
204E30010 GRANULAR MATERIAL, TYPE B41 CY$150$95.00$148$165
204E50000 GEOTEXTILE FABRIC1,048 SY$4.50$2.50$3.44$2.00
510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT12 EACH$175$45.00$52.55$60.00
511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE2 EACH$5,500$4,600$3,917$5,500
512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY)414 SY$12.50$12.50$12.50$18.75
512E33000 TYPE 2 WATERPROOFING30 SY$30.00$40.00$30.00$46.00
516E10010 ARMORLESS PREFORMED JOINT SEAL66 FT$65.00$80.00$35.22$75.50
516E13900 2" PREFORMED EXPANSION JOINT FILLER54 SF$10.00$25.00$16.90$12.25
516E25000 NYLON REINFORCED NEOPRENE SHEETING327 SF$26.50$15.00$16.65$5.00
516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO8 EACH$1,300$1,800$1,507$2,200
516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO8 EACH$1,300$1,800$2,391$2,200
518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC67 CY$125$155$151$130
518E22300 SPECIAL - STEEL DRIP STRIP313 FT$15.50$22.00$32.93$15.00
518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE129 FT$20.00$15.00$3.88$6.00
518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI106 FT$25.00$20.00$6.31$19.00
524E94903 DRILLED SHAFTS, 48" DIAMETER ABOVE BEDROCK, AS PER29 FT$595$870$418$500
863E00100 GEOGRID, TYPE P11,782 SY$3.50$6.00$9.30$4.35
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$11,000$11,500$11,154$8,000
614E11000 MAINTAINING TRAFFIC1 LS$5,000$6,000$4,098$35,500
619E16010 FIELD OFFICE, TYPE B4 MNTH$1,500$2,800$2,323$1,800
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$15,000$20,000$48,700$10,000

Project details

Description
BRO-CR 62-00.42
Type of work
Bridge

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →