PER-MR 56-00.13 (Buckeye Street)
PER County · est $0.6M
Bid dateThursday, January 29—
Awarded toJ & J BRIDGE COMPANY INC$559,633.8
PER County · est $0.6M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE Section 7 - STRUCTURE OVER 20 FOOT SPAN (SFN 6461213 - Totals Awd $342,711.10 2 $357,047.50 3 $349,185.00 4 $394,664.00 5 $419,678.50 6 $420,094.00 7 $488,910.40 | 34 FT | $5,000 | $170k | 30% |
| 507E92201 PREBORED HOLES, AS PER PLAN | 352 FT | $150 | $53k | 9% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $35,000 | $35k | 6% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $74,500.00 2 $59,350.00 3 $48,298.00 4 $52,000.00 5 $65,000.00 6 $66,000.00 7 $73,000.00 | 1 LS | $30,000 | $30k | 5% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 35 CY | $750 | $26k | 5% |
| 507E00101 STEEL PILES HP10X42, FURNISHED, AS PER PLAN | 480 FT | $50 | $24k | 4% |
| 613E41201 LOW STRENGTH MORTAR BACKFILL, AS PER PLAN | 135 CY | $175 | $24k | 4% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 7 CY | $2,000 | $14k | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 4,743 LB | $2.7 | $13k | 2% |
| 839E30100 TRENCH DRAIN, TYPE B WITH PEDESTRIAN GRATE Section 3 - DRAINAGE - Totals Awd $48,387.00 2 $46,470.00 3 $63,125.00 4 $60,370.00 5 $52,310.00 6 $63,475.00 7 $72,250.00 | 16 FT | $800 | $13k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 42 more items below.
| Item | Quantity | R1J & J Bridge Company INC | R2Buds INC | R3Shelly & Sands INC | R4Double Z Construction Company | R5Axis Civil Construction LLC | R6R C Construction Company And Son INC | R7Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE Section 7 - STRUCTURE OVER 20 FOOT SPAN (SFN 6461213 - Totals Awd $342,711.10 2 $357,047.50 3 $349,185.00 4 $394,664.00 5 $419,678.50 6 $420,094.00 7 $488,910.40 | 34 FT | $5,000 | $4,590 | $4,000 | $4,800 | $4,100 | $4,000 | $4,000 | 34% |
| 507E92201 PREBORED HOLES, AS PER PLAN | 352 FT | $150 | $85.00 | $90.00 | $125 | $245 | $350 | $175 | 11% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $35,000 | $9,350 | $3,098 | $5,000 | $6,500 | $18,500 | $6,000 | 7% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $74,500.00 2 $59,350.00 3 $48,298.00 4 $52,000.00 5 $65,000.00 6 $66,000.00 7 $73,000.00 | 1 LS | $30,000 | $26,000 | $28,650 | $25,000 | $40,000 | $15,000 | $37,000 | 6% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 35 CY | $750 | $400 | $1,400 | $1,400 | $990 | $950 | $250 | 5% |
| 507E00101 STEEL PILES HP10X42, FURNISHED, AS PER PLAN | 480 FT | $50.00 | $50.00 | $33.00 | $40.00 | $40.00 | $75.00 | $35.00 | 5% |
| 613E41201 LOW STRENGTH MORTAR BACKFILL, AS PER PLAN | 135 CY | $175 | $135 | $250 | $200 | $185 | $250 | $250 | 5% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 7 CY | $2,000 | $3,299 | $4,000 | $1,400 | $2,900 | $1,800 | $10,000 | 3% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 4,743 LB | $2.70 | $2.50 | $3.00 | $3.00 | $4.50 | $3.00 | $2.80 | 3% |
| 839E30100 TRENCH DRAIN, TYPE B WITH PEDESTRIAN GRATE Section 3 - DRAINAGE - Totals Awd $48,387.00 2 $46,470.00 3 $63,125.00 4 $60,370.00 5 $52,310.00 6 $63,475.00 7 $72,250.00 | 16 FT | $800 | $1,150 | $1,100 | $1,100 | $900 | $1,000 | $925 | 3% |
| 503E21100 UNCLASSIFIED EXCAVATION | 125 CY | $100 | $100 | $74.00 | $55.00 | $140 | $25.00 | $115 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 32 CY | $336 | $335 | $450 | $400 | $390 | $650 | $400 | 2% |
| 609E26000 CURB, TYPE 6 Section 4 - PAVEMENT - Totals Awd $45,255.20 2 $55,403.00 3 $58,125.60 4 $51,443.60 5 $42,814.00 6 $63,135.00 7 $48,320.60 | 117 FT | $90.00 | $75.00 | $66.00 | $70.00 | $40.00 | $65.00 | $50.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $2,500 | $6,000 | $3,000 | $5,000 | $3,500 | $6,000 | 2% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $10,000 | $26,100 | $15,500 | $24,000 | $25,000 | $20,000 | $52,000 | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 24 CY | $355 | $365 | $585 | $450 | $450 | $650 | $450 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,000 | $16,000 | $3,950 | $13,000 | $10,000 | $20,000 | $15,000 | 2% |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 3 CY | $2,500 | $3,299 | $2,250 | $1,625 | $4,000 | $1,800 | $6,000 | 2% |
| 304E20000 AGGREGATE BASE, T=6" | 48 CY | $150 | $125 | $179 | $150 | $140 | $200 | $150 | 1% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 35 CY | $200 | $180 | $350 | $215 | $135 | $200 | $120 | 1% |
| Item | Quantity | R1J & J Bridge Company INC | R2Buds INC | R3Shelly & Sands INC | R4Double Z Construction Company | R5Axis Civil Construction LLC | R6R C Construction Company And Son INC | R7Complete General Construction Company |
|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 199 SY | $25.00 | $18.00 | $20.00 | $17.00 | $10.00 | $30.00 | $30.00 |
| 202E23500 WEARING COURSE REMOVED | 92 SY | $10.00 | $10.00 | $3.00 | $25.00 | $12.00 | $30.00 | $50.00 |
| 202E30000 WALK REMOVED | 276 SF | $4.00 | $5.00 | $3.00 | $4.00 | $3.00 | $10.00 | $5.00 |
| 202E32000 CURB REMOVED | 17 FT | $25.00 | $10.00 | $25.00 | $15.00 | $15.00 | $20.00 | $80.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 69 FT | $10.00 | $20.00 | $15.00 | $15.00 | $25.00 | $50.00 | $50.00 |
| 202E38000 GUARDRAIL REMOVED | 66 FT | $2.00 | $5.00 | $6.00 | $8.00 | $10.00 | $5.00 | $3.00 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $250 | $300 | $225 | $500 | $3,000 | $1,500 | $1,000 |
| 203E10000 EXCAVATION | 100 CY | $25.00 | $50.00 | $40.00 | $25.00 | $50.00 | $25.00 | $30.00 |
| 203E20000 EMBANKMENT | 100 CY | $25.00 | $50.00 | $40.00 | $25.00 | $50.00 | $25.00 | $35.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 63 FT | $40.00 | $35.00 | $40.00 | $40.00 | $40.00 | $100 | $62.00 |
| 606E15350 GUARDRAIL, TYPE MGS WITH SOCKETED POSTS | 41 FT | $145 | $135 | $145 | $145 | $145 | $300 | $236 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 2 EACH | $1,300 | $1,300 | $1,300 | $1,300 | $1,300 | $2,000 | $1,100 |
| 607E35000 FENCE REMOVED AND REBUILT Section 1 - ROADWAY - Totals Awd $35,161.00 2 $31,652.00 3 $32,805.00 4 $30,820.00 5 $38,977.00 6 $50,710.00 7 $49,360.00 | 10 FT | $35.00 | $45.00 | $35.00 | $215 | $35.00 | $100 | $212 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 10 CY | $250 | $200 | $175 | $175 | $135 | $200 | $165 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $50.00 | $50.00 | $150 | $150 | $150 | $20.00 | $125 |
| 659E00300 TOPSOIL | 29 CY | $10.00 | $20.00 | $80.00 | $75.00 | $65.00 | $100 | $35.00 |
| 659E10000 SEEDING AND MULCHING | 254 SY | $4.00 | $8.00 | $10.00 | $14.50 | $4.30 | $20.00 | $28.05 |
| 659E14000 REPAIR SEEDING AND MULCHING | 13 SY | $4.00 | $0.50 | $10.00 | $10.00 | $4.30 | $0.20 | $15.00 |
| 659E15000 INTER-SEEDING | 13 SY | $4.00 | $0.50 | $10.00 | $10.00 | $4.30 | $0.20 | $15.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $5,000 | $800 | $1,250 | $1,250 | $950 | $3,000 | $875 |
| 659E31000 LIME | 0.06 ACRE | $5,000 | $250 | $150 | $150 | $610 | $3,000 | $167 |
| 659E35000 WATER | 2 MGAL | $10.00 | $0.50 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $12,607.00 2 $12,150.00 3 $20,458.00 4 $16,731.00 5 $10,517.60 6 $18,434.20 7 $15,678.72 | 1,127 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.21 CY | $2,200 | $4,500 | $4,500 | $13,000 | $5,500 | $2,500 | $10,000 |
| 611E04600 12" CONDUIT, TYPE C | 44 FT | $125 | $100 | $120 | $160 | $120 | $175 | $275 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $6,000 | $4,500 | $5,550 | $6,000 | $6,500 | $5,500 | $9,500 |
| 407E20000 NON-TRACKING TACK COAT | 52 GAL | $4.10 | $4.00 | $3.30 | $4.80 | $7.00 | $20.00 | $4.80 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 18 SY | $200 | $300 | $240 | $160 | $185 | $225 | $320 |
| 608E10000 4" CONCRETE WALK | 444 SF | $10.00 | $35.00 | $20.00 | $21.00 | $10.00 | $10.00 | $12.75 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 21 FT | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $95.00 | $30.00 |
| 630E80100 SIGN, FLAT SHEET | 17.5 SF | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $250 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $10.00 | $25.00 | $15.00 | $130 | $50.00 | $100 | $15.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA Section 5 - TRAFFIC CONTROL - Totals Awd $1,002.50 2 $1,062.50 3 $1,022.50 4 $1,482.50 5 $1,162.50 6 $6,770.00 7 $1,225.00 | 2 EACH | $10.00 | $25.00 | $15.00 | $130 | $50.00 | $100 | $20.00 |
| 616E10000 WATER Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $10.00 2 $0.50 3 $115.00 4 $35.00 5 $1.00 6 $1.00 7 $300.00 | 1 MGAL | $10.00 | $0.50 | $115 | $35.00 | $1.00 | $1.00 | $300 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $100 | $15,000 | $15,500 | $30,000 | $25,000 | $15,000 | $55,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 22 SY | $50.00 | $45.00 | $75.00 | $60.00 | $75.00 | $50.00 | $75.00 |
| 512E33000 TYPE 2 WATERPROOFING | 40 SY | $35.00 | $24.00 | $40.00 | $38.00 | $29.00 | $30.00 | $40.00 |
| 512E33010 TYPE 3 WATERPROOFING | 139 SY | $25.00 | $45.00 | $45.00 | $50.00 | $65.00 | $60.00 | $45.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 27 SF | $15.00 | $10.00 | $9.00 | $15.00 | $10.00 | $50.00 | $40.00 |
| 517E75121 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 33 FT | $175 | $765 | $436 | $560 | $175 | $250 | $940 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 3 CY | $200 | $300 | $1,100 | $270 | $385 | $350 | $500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,500 | $8,000 | $12,600 | $9,000 | $8,500 | $12,500 | $15,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →