LAW-SR 775-08.77
LAW County · est $0.9M
Bid dateThursday, January 29—
Awarded toAXIS CIVIL CONSTRUCTION LLC$1.19M
LAW County · est $0.9M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10001 EXCAVATION, AS PER PLAN | 25,588 CY | $33.9 | $867k | 73% |
| 862E00500 SCALING Section 1 - ROADWAY - Totals Awd $964,966.20 2 $982,644.00 | 60 HOUR | $990 | $59k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $35,000 | $35k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $35k | 3% |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN Section 5 - MAINTENANCE OF TRAFFIC - Totals Awd $58,160.00 2 $93,569.00 | 732 FT | $40 | $29k | 2% |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $2,500 | $15k | 1% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 3 EACH | $4,800 | $14k | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $12,000 | $12k | 1% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,800 | $11k | 1% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Allard Excavation LLC | % of bid |
|---|---|---|---|---|
| 203E10001 EXCAVATION, AS PER PLAN | 25,588 CY | $33.90 | $35.00 | 74% |
| 862E00500 SCALING Section 1 - ROADWAY - Totals Awd $964,966.20 2 $982,644.00 | 60 HOUR | $990 | $1,200 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $83,000 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $35,000 | $13,293 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $105,399 | 3% |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN Section 5 - MAINTENANCE OF TRAFFIC - Totals Awd $58,160.00 2 $93,569.00 | 732 FT | $40.00 | $66.00 | 3% |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $2,500 | $1,800 | 1% |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 3 EACH | $4,800 | $10,462 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $12,000 | $15,479 | 1% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,800 | $2,400 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $9,960 | 1% |
| 611E05900 15" CONDUIT, TYPE B Section 3 - DRAINAGE - Totals Awd $30,620.00 2 $33,126.00 | 77 FT | $120 | $183 | 1% |
| 202E32500 CURB AND GUTTER REMOVED | 505 FT | $18.00 | $12.00 | 1% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $8,182.10 2 $8,182.10 | 5,000 EACH | $1.00 | $1.00 | 0% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 15" | 40 FT | $120 | $170 | 0% |
| 614E12420 DETOUR SIGNING Section 6 - INCIDENTALS - Totals Awd $119,000.00 2 $234,438.00 | 1 LS | $3,800 | $3,800 | 0% |
| 659E10000 SEEDING AND MULCHING | 1,118 SY | $2.70 | $2.70 | 0% |
| 203E20000 EMBANKMENT | 66 CY | $38.00 | $21.00 | 0% |
| 202E98100 REMOVAL MISC.:CATCH BASIN CLEAN OUT | 2 EACH | $1,000 | $365 | 0% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG Section 4 - PAVEMENT - Totals Awd $4,564.00 2 $1,994.00 | 2 CY | $850 | $400 | 0% |
| Item | Quantity | R1Axis Civil Construction LLC | R2Allard Excavation LLC |
|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 17 SY | $20.00 | $7.00 |
| 204E10000 SUBGRADE COMPACTION | 19 SY | $15.00 | $14.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $1,250 | $1,250 |
| 659E31000 LIME | 0.23 ACRE | $150 | $150 |
| 659E35000 WATER | 4 MGAL | $1.00 | $1.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 77 FT | $20.00 | $6.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $1,200 | $123 |
| 209E10001 DITCH CLEANOUT, AS PER PLAN (TYPE 5, CURB AND GUTT | 250 FT | $5.00 | $10.00 |
| 601E39500 PAVED GUTTER, TYPE 5 | 10 FT | $150 | $236 |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 2 CY | $750 | $300 |
| 304E20000 AGGREGATE BASE | 3 CY | $450 | $194 |
| 407E10000 TACK COAT | 2 GAL | $7.00 | $6.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 42 EACH | $15.00 | $25.00 |
| 614E13314 BARRIER REFLECTOR, TYPE 3 (FOR GUARDRAIL) | 23 EACH | $15.00 | $32.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 36 EACH | $20.00 | $25.00 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.1 MILE | $6,250 | $6,250 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.03 MILE | $18,000 | $18,000 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 25 FT | $14.00 | $14.00 |
| 616E10000 WATER | 70 MGAL | $1.00 | $1.00 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,600 | $3,000 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,600 | $3,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →