CUY-IR 480-16.56 Slide
CUY County · est $0.7M
Bid dateThursday, April 23—
Awarded toECLIPSE CO LLC$803,461.13
CUY County · est $0.7M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 8,916 CY | $30.82 | $275k | 34% |
| 203E10000 EXCAVATION | 8,065 CY | $16.71 | $135k | 17% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $42,280 | $42k | 5% |
| 622E41110 PORTABLE BARRIER, ANCHORED | 800 FT | $39.67 | $32k | 4% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $90,201.07 2 $113,250.00 3 $91,941.00 4 $98,039.42 | 1 LS | $27,418 | $27k | 3% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 25 CY | $1,055 | $26k | 3% |
| 659E00300 TOPSOIL | 505 CY | $44.04 | $22k | 3% |
| 442E22101 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 17 CY | $1,055 | $18k | 2% |
| 607E23000 FENCE, TYPE CLT | 335 FT | $40.82 | $14k | 2% |
| 442E22300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 12 CY | $1,055 | $13k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 54 more items below.
| Item | Quantity | R1Eclipse CO LLC | R2Great Lakes Construction CO | R3Daniel R Schmoldt Enterprises INC | R4Madex Construction CO | % of bid |
|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 8,916 CY | $30.82 | $24.00 | $26.00 | $27.29 | 40% |
| 203E10000 EXCAVATION | 8,065 CY | $16.71 | $26.75 | $26.00 | $24.48 | 19% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $42,280 | $39,000 | $31,000 | $21,692 | 6% |
| 622E41110 PORTABLE BARRIER, ANCHORED | 800 FT | $39.67 | $40.00 | $44.00 | $46.32 | 5% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $90,201.07 2 $113,250.00 3 $91,941.00 4 $98,039.42 | 1 LS | $27,418 | $42,500 | $25,000 | $33,791 | 4% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 25 CY | $1,055 | $930 | $950 | $1,013 | 4% |
| 659E00300 TOPSOIL | 505 CY | $44.04 | $40.00 | $40.00 | $57.89 | 3% |
| 442E22101 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 17 CY | $1,055 | $735 | $950 | $1,013 | 3% |
| 607E23000 FENCE, TYPE CLT | 335 FT | $40.82 | $39.20 | $68.00 | $46.32 | 2% |
| 442E22300 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 12 CY | $1,055 | $820 | $950 | $1,013 | 2% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 15 CY | $741 | $490 | $665 | $701 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $18,750 | $5,000 | $6,265 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,840 | $8,000 | $17,441 | $16,820 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 325 FT | $28.88 | $27.60 | $52.00 | $31.96 | 1% |
| 614E22326 WORK ZONE EDGE LINE, CLASS I, 6", 873 | 0.75 MILE | $12,169 | $12,169 | $15,000 | $14,358 | 1% |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 325 FT | $28.05 | $23.00 | $45.00 | $30.11 | 1% |
| 659E10000 SEEDING AND MULCHING | 4,549 SY | $1.95 | $1.95 | $3.00 | $4.34 | 1% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 242 FT | $34.64 | $40.00 | $38.10 | $40.53 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 592 SY | $13.57 | $22.00 | $11.00 | $11.58 | 1% |
| 202E35101 PIPE REMOVED, 24" DIAMETER AND UNDER, AS PER PLAN | 262 FT | $28.88 | $38.00 | $38.00 | $17.49 | 1% |
| Item | Quantity | R1Eclipse CO LLC | R2Great Lakes Construction CO | R3Daniel R Schmoldt Enterprises INC | R4Madex Construction CO |
|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 41 SY | $65.00 | $40.00 | $52.00 | $91.18 |
| 202E38000 GUARDRAIL REMOVED | 325 FT | $2.09 | $2.00 | $3.00 | $5.79 |
| 202E75000 FENCE REMOVED | 347 FT | $4.17 | $4.00 | $12.00 | $6.95 |
| 203E35000 GRANULAR EMBANKMENT | 60 CY | $115 | $115 | $131 | $95.79 |
| 607E98200 FENCE, MISC.: TEMPORARY ORANGE PLASTIC CONSTRUCTIO Section 1 - ROADWAY - Totals Awd $463,686.15 2 $496,608.75 3 $512,773.00 4 $492,437.39 | 1 LS | $1,810 | $5,500 | $1,500 | $1,158 |
| 601E10000 RIPRAP | 3 SY | $339 | $1,200 | $250 | $1,042 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 12 CY | $206 | $225 | $250 | $347 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 22 CY | $181 | $225 | $250 | $243 |
| 601E35000 ROCK CHANNEL PROTECTION, MISC.: 40% TYPE B/60% TYP | 11 CY | $199 | $225 | $250 | $359 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $25.00 | $25.00 | $500 | $89.47 |
| 659E14000 REPAIR SEEDING AND MULCHING | 228 SY | $1.95 | $1.95 | $5.00 | $2.32 |
| 659E15000 INTER-SEEDING | 228 SY | $0.20 | $0.20 | $5.00 | $2.32 |
| 659E20000 COMMERCIAL FERTILIZER | 0.64 TON | $250 | $250 | $1,200 | $2,316 |
| 659E31000 LIME | 0.94 ACRE | $25.00 | $25.00 | $700 | $579 |
| 659E35000 WATER | 26 MGAL | $1.00 | $1.00 | $10.00 | $17.37 |
| 670E00520 SLOPE EROSION PROTECTION MAT, TYPE B | 3,898 SY | $1.25 | $1.25 | $2.00 | $4.63 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,800 | $4,000 | $3,600 | $2,895 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $2,000 | $6,500 | $6,500 | $2,779 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $1,598 | $2,000 | $1,500 | $2,316 |
| 832E30001 EROSION CONTROL, AS PER PLAN | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING Section 2 - EROSION CONTROL - Totals Awd $57,740.59 2 $64,861.25 3 $74,319.00 4 $100,892.64 | 222 SY | $4.25 | $4.25 | $5.00 | $11.58 |
| 602E20000 CONCRETE MASONRY | 1 CY | $2,893 | $3,000 | $2,200 | $2,895 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 300 FT | $15.49 | $25.00 | $41.00 | $13.16 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 50 FT | $19.87 | $30.00 | $54.00 | $13.16 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET Section 3 - DRAINAGE - Totals Awd $19,122.45 2 $20,825.00 3 $32,485.00 4 $17,823.34 | 3 EACH | $491 | $450 | $220 | $179 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 328 FT | $8.06 | $10.00 | $4.00 | $5.79 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.5") | 73 SY | $64.86 | $35.00 | $55.00 | $63.68 |
| 304E20000 AGGREGATE BASE | 15 CY | $117 | $150 | $250 | $139 |
| 407E10000 TACK COAT | 37 GAL | $2.45 | $4.00 | $2.55 | $2.00 |
| 407E20000 NON-TRACKING TACK COAT | 35 GAL | $2.45 | $4.00 | $2.55 | $2.00 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 2,112 FT | $3.43 | $3.43 | $4.00 | $4.63 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE Section 4 - PAVEMENT - Totals Awd $93,865.50 2 $82,560.16 3 $86,725.60 4 $91,612.52 | 246 LB | $4.91 | $4.00 | $5.00 | $4.00 |
| 621E00100 RPM | 68 EACH | $58.00 | $58.00 | $64.00 | $69.47 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE WAY | 6 EACH | $26.68 | $12.50 | $15.00 | $17.37 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.57 MILE | $1,600 | $1,600 | $2,800 | $1,968 |
| 642E00204 LANE LINE, 6", TYPE 1 | 0.41 MILE | $1,600 | $1,600 | $1,400 | $1,968 |
| 642E00404 CHANNELIZING LINE, 12", TYPE 1 | 282 FT | $2.00 | $2.00 | $2.50 | $2.89 |
| 642E01510 DOTTED LINE, 6", TYPE 1 Section 5 - TRAFFIC CONTROL - Totals Awd $6,575.08 2 $6,490.00 3 $7,995.00 4 $8,162.07 | 339 FT | $1.00 | $1.00 | $2.00 | $1.74 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 32 HOUR | $75.00 | $110 | $155 | $116 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,042 FT | $1.86 | $1.86 | $2.05 | $2.32 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $3,390 | $2,235 | $3,100 | $2,663 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 75 EACH | $8.70 | $8.70 | $9.60 | $10.42 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 22 EACH | $10.67 | $10.67 | $11.74 | $17.37 |
| 614E13350 OBJECT MARKER, ONE WAY | 22 EACH | $21.90 | $21.90 | $24.10 | $28.95 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 4 SNMT | $1,072 | $1,072 | $1,100 | $1,274 |
| 614E20356 WORK ZONE LANE LINE, CLASS I, 6", 873 | 0.25 MILE | $6,315 | $6,315 | $11,000 | $7,526 |
| 614E23130 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 873 | 1,080 FT | $4.27 | $4.27 | $6.00 | $5.21 |
| 614E24122 WORK ZONE DOTTED LINE, CLASS I, 6", 873 | 360 FT | $1.11 | $1.11 | $2.50 | $1.45 |
| 616E10000 WATER | 51 MGAL | $1.00 | $50.00 | $5.00 | $7.37 |
| 644E30030 REMOVAL OF PAVEMENT MARKING Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $72,270.29 2 $76,294.69 3 $83,259.78 4 $85,425.33 | 2 MILE | $1,500 | $1,500 | $550 | $1,853 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $1,170 | $1,250 | $1,500 | $5,211 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $6,492 | $17,500 | $10,000 | $11,579 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,500 | $2,500 | $3,500 | $5,474 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,500 | $2,500 | $3,500 | $3,474 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →