JEF-US 22-06.99
JEF County · est $0.6M
Bid dateThursday, January 29—
Awarded toTUCSON INC$507,908.63
JEF County · est $0.6M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E34400 ROCK CHANNEL PROTECTION, WITH GROUT, TYPE B | 538 CY | $194 | $104k | 21% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $222,590.53 2 $247,148.75 3 $220,914.33 4 $274,843.55 5 $316,859.50 6 $253,064.50 7 $250,765.56 8 $359,678.50 | 80,000 EACH | $1 | $80k | 16% |
| 203E10000 EXCAVATION | 1,149 CY | $55.75 | $64k | 13% |
| 304E20000 AGGREGATE BASE Section 4 - PAVEMENT - Totals Awd $37,485.00 2 $40,278.00 3 $24,878.28 4 $39,984.00 5 $32,340.00 6 $33,810.00 7 $39,469.50 8 $52,920.00 | 294 CY | $127.5 | $37k | 7% |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 604 SY | $51.65 | $31k | 6% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN Section 6 - STRUCTURE REPAIR (JEF-22-06.980, L&R SFN - Totals Awd $26,650.00 2 $52,780.00 3 $103,118.05 4 $80,000.00 5 $43,000.00 6 $64,100.00 7 $135,186.00 8 $100,000.00 | 1 LS | $26,650 | $27k | 5% |
| 602E20000 CONCRETE MASONRY | 13 CY | $1,790 | $23k | 5% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $62,100.00 2 $42,734.85 3 $92,472.00 4 $95,750.00 5 $81,500.00 6 $88,959.00 7 $115,144.50 8 $117,100.00 | 1 LS | $19,000 | $19k | 4% |
| 619E16010 FIELD OFFICE, TYPE B | 7 MNTH | $2,100 | $15k | 3% |
| 611E13200 30" CONDUIT, TYPE A , 706.02, 707.33, OR 707.34 Section 3 - DRAINAGE - Totals Awd $38,060.00 2 $40,697.00 3 $33,806.91 4 $5,410.00 5 $20,520.00 6 $34,713.00 7 $28,794.75 8 $36,350.00 | 39 FT | $366 | $14k | 3% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 17 more items below.
| Item | Quantity | R1Tucson INC | R2Rudzik Excavating INC | R3S.t.a.r.t., LLC | R4Mason Dixon Energy Services LLC | R5Xtreme Elements LLC | R6Shelly & Sands INC | R7Eclipse CO LLC | R8Dennison Bridge INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 601E34400 ROCK CHANNEL PROTECTION, WITH GROUT, TYPE B | 538 CY | $194 | $242 | $197 | $250 | $375 | $242 | $225 | $425 | 21% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $222,590.53 2 $247,148.75 3 $220,914.33 4 $274,843.55 5 $316,859.50 6 $253,064.50 7 $250,765.56 8 $359,678.50 | 80,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 16% |
| 203E10000 EXCAVATION | 1,149 CY | $55.75 | $49.00 | $29.15 | $32.00 | $40.00 | $27.00 | $56.25 | $65.00 | 13% |
| 304E20000 AGGREGATE BASE Section 4 - PAVEMENT - Totals Awd $37,485.00 2 $40,278.00 3 $24,878.28 4 $39,984.00 5 $32,340.00 6 $33,810.00 7 $39,469.50 8 $52,920.00 | 294 CY | $128 | $137 | $84.62 | $136 | $110 | $115 | $134 | $180 | 8% |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 604 SY | $51.65 | $49.00 | $38.91 | $80.00 | $43.00 | $48.00 | $59.25 | $65.00 | 6% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN Section 6 - STRUCTURE REPAIR (JEF-22-06.980, L&R SFN - Totals Awd $26,650.00 2 $52,780.00 3 $103,118.05 4 $80,000.00 5 $43,000.00 6 $64,100.00 7 $135,186.00 8 $100,000.00 | 1 LS | $26,650 | $52,780 | $103,118 | $80,000 | $43,000 | $64,100 | $135,186 | $100,000 | 5% |
| 602E20000 CONCRETE MASONRY | 13 CY | $1,790 | $1,800 | $1,414 | $250 | $745 | $1,221 | $1,397 | $1,250 | 5% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $62,100.00 2 $42,734.85 3 $92,472.00 4 $95,750.00 5 $81,500.00 6 $88,959.00 7 $115,144.50 8 $117,100.00 | 1 LS | $19,000 | $18,000 | $29,522 | $27,000 | $38,500 | $31,000 | $79,100 | $25,000 | 4% |
| 619E16010 FIELD OFFICE, TYPE B | 7 MNTH | $2,100 | $800 | $3,200 | $250 | $1,200 | $5,274 | $1,733 | $2,000 | 3% |
| 611E13200 30" CONDUIT, TYPE A , 706.02, 707.33, OR 707.34 Section 3 - DRAINAGE - Totals Awd $38,060.00 2 $40,697.00 3 $33,806.91 4 $5,410.00 5 $20,520.00 6 $34,713.00 7 $28,794.75 8 $36,350.00 | 39 FT | $366 | $423 | $350 | $40.00 | $265 | $450 | $253 | $500 | 3% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC Section 5 - MAINTENANCE OF TRAFFIC - Totals Awd $18,050.00 2 $12,015.00 3 $13,975.00 4 $23,500.00 5 $18,000.00 6 $22,125.00 7 $33,515.00 8 $11,900.00 | 50 CY | $277 | $150 | $205 | $300 | $200 | $368 | $590 | $160 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,000 | $5,245 | $1,250 | $50,000 | $3,500 | $4,045 | $3,245 | $3,100 | 2% |
| 607E23000 FENCE, TYPE CLT | 216 FT | $48.35 | $58.90 | $33.75 | $60.00 | $72.00 | $34.00 | $37.25 | $52.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,700 | $5,690 | $8,500 | $10,000 | $12,000 | $3,679 | $9,047 | $10,000 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,605 | $15,400 | $10,022 | $2,000 | $25,500 | $106,000 | $16,622 | $10,000 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 200 FT | $32.80 | $30.80 | $29.20 | $60.00 | $37.00 | $29.00 | $32.00 | $29.50 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,800 | $5,000 | $15,800 | $3,000 | $15,500 | $10,792 | $9,000 | $15,000 | 1% |
| 614E12420 DETOUR SIGNING | 1 LS | $4,200 | $4,515 | $3,725 | $8,500 | $8,000 | $3,725 | $4,015 | $3,900 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $3,162 | $3,465 | $2,960 | $500 | $2,650 | $850 | $3,256 | $3,300 | 1% |
| 659E00300 TOPSOIL | 49 CY | $60.00 | $20.00 | $106 | $80.00 | $95.00 | $109 | $92.50 | $45.00 | 1% |
| Item | Quantity | R1Tucson INC | R2Rudzik Excavating INC | R3S.t.a.r.t., LLC | R4Mason Dixon Energy Services LLC | R5Xtreme Elements LLC | R6Shelly & Sands INC | R7Eclipse CO LLC | R8Dennison Bridge INC |
|---|---|---|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 2 EACH | $581 | $1,000 | $489 | $350 | $2,000 | $278 | $506 | $500 |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER , 30" | 31 FT | $37.50 | $30.00 | $85.29 | $30.00 | $25.00 | $18.00 | $37.00 | $30.00 |
| 203E20000 EMBANKMENT | 83 CY | $32.00 | $60.00 | $40.10 | $22.00 | $20.00 | $56.00 | $20.75 | $45.00 |
| 204E10000 SUBGRADE COMPACTION | 585 SY | $2.65 | $3.00 | $4.39 | $12.00 | $4.00 | $3.00 | $1.50 | $5.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $150 | $250 | $450 | $300 | $500 | $358 | $294 | $100 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $2,585 | $2,365 | $1,970 | $500 | $2,350 | $1,970 | $2,167 | $2,300 |
| 607E61200 GATE, TYPE CLT Section 1 - ROADWAY - Totals Awd $102,973.10 2 $109,166.40 3 $74,523.29 4 $76,354.00 5 $111,687.00 6 $163,842.00 7 $109,453.25 8 $118,807.00 | 1 EACH | $2,880 | $2,838 | $2,980 | $850 | $3,000 | $2,980 | $3,278 | $2,700 |
| 601E11000 RIPRAP, TYPE D | 9 SY | $141 | $550 | $417 | $65.00 | $235 | $473 | $324 | $600 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $75.00 | $25.00 | $84.14 | $350 | $175 | $150 | $149 | $100 |
| 659E10000 SEEDING AND MULCHING | 442 SY | $5.65 | $3.00 | $2.94 | $15.00 | $4.00 | $8.00 | $13.25 | $8.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 22 SY | $1.50 | $0.05 | $11.19 | $6.00 | $2.00 | $8.00 | $11.75 | $8.00 |
| 659E15000 INTER-SEEDING | 22 SY | $1.00 | $0.05 | $12.33 | $0.25 | $2.00 | $8.00 | $11.75 | $8.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.06 TON | $1,050 | $800 | $2,999 | $750 | $800 | $1,250 | $973 | $1,000 |
| 659E31000 LIME | 0.09 ACRE | $307 | $5.00 | $1,852 | $45.00 | $150 | $150 | $177 | $150 |
| 659E35000 WATER | 2 MGAL | $10.00 | $0.05 | $5.00 | $1.00 | $50.00 | $1.00 | $1.00 | $1.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 2 CY | $258 | $400 | $894 | $300 | $250 | $645 | $395 | $300 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $2,900 | $3,200 | $15,000 | $4,000 | $3,600 | $2,525 | $2,625 | $50,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →