BID #260008 · ODOTRESULT · awarded Jan 15

BEL-SR 149-15.10

BEL County · est $0.5M

Bid dateThursday, January 15
Awarded toSHELLY & SANDS INC$558,224.5
read → connected → answeredcassandri

Project scope

Bid form · ODOT

42ITEMS
  • Earthwork19%
  • Structures / Bridge14%
  • Erosion & Landscaping12%
  • Maintaining Traffic12%
  • Guardrail & Barrier7%
  • Aggregate & Base7%
  • Other29%

Top items by winning bid

ItemQtyUnit priceExtended%
530E50010 SPECIAL - RETAINING WALL, STACKED CELLULAR WALL Section 6 - RETAINING WALLS (RFWN: 1014807) - Totals Awd $256,569.00 2 $235,445.00 3 $227,547.68 4 $310,509.581,581 SF$87$138k25%
601E34000 ROCK CHANNEL PROTECTION, TYPE A WITHOUT FILTER469 CY$115$54k10%
511E53010 CLASS QC1 CONCRETE, MISC.: SCOUR PROTECTION53 CY$740$39k7%
201E11000 CLEARING AND GRUBBING1 LS$33,925$34k6%
519E11100 PATCHING CONCRETE STRUCTURE150 SF$210$32k6%
203E10000 EXCAVATION539 CY$48$26k5%
624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $46,470.00 2 $66,835.50 3 $96,491.60 4 $44,530.001 LS$25,000$25k4%
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)61 CY$388$24k4%
614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC50 CY$400$20k4%
503E11100 COFFERDAMS AND EXCAVATION BRACING1 LS$19,000$19k3%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 22 more items below.

Rank 1Shelly & Sands INC$558kRank 2Rudzik Excavating INC$570kRank 3Eclipse CO LLC$600kRank 4Ohio-west Virginia Excavating CO$626k
ItemQuantityR1Shelly & Sands INCR2Rudzik Excavating INCR3Eclipse CO LLCR4Ohio-west Virginia Excavating CO
530E50010 SPECIAL - RETAINING WALL, STACKED CELLULAR WALL Section 6 - RETAINING WALLS (RFWN: 1014807) - Totals Awd $256,569.00 2 $235,445.00 3 $227,547.68 4 $310,509.581,581 SF$87.00$70.00$46.92$81.50
601E34000 ROCK CHANNEL PROTECTION, TYPE A WITHOUT FILTER469 CY$115$135$138$115
511E53010 CLASS QC1 CONCRETE, MISC.: SCOUR PROTECTION53 CY$740$610$807$708
201E11000 CLEARING AND GRUBBING1 LS$33,925$26,000$23,545$10,000
519E11100 PATCHING CONCRETE STRUCTURE150 SF$210$188$30.87$91.00
203E10000 EXCAVATION539 CY$48.00$65.00$70.04$50.00
624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $46,470.00 2 $66,835.50 3 $96,491.60 4 $44,530.001 LS$25,000$43,716$76,974$22,100
301E56000 ASPHALT CONCRETE BASE, PG64-22, (449)61 CY$388$546$388$338
614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC50 CY$400$100$568$586
503E11100 COFFERDAMS AND EXCAVATION BRACING1 LS$19,000$16,000$82,241$91,180
512E10600 CONCRETE REPAIR BY EPOXY INJECTION150 FT$95.00$188$43.93$89.50
441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 Section 3 - PAVEMENT - Totals Awd $67,775.50 2 $84,134.55 3 $68,923.60 4 $76,200.03449 (35 CY$388$549$388$434
606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN Section 1 - ROADWAY - Totals Awd $88,900.50 2 $89,810.00 3 $88,174.66 4 $75,084.52275 FT$41.40$49.00$41.40$51.38
441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG25 CY$450$543$450$655
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$11,000$5,000$7,322$6,500
304E20000 AGGREGATE BASE86 CY$120$140$133$149
254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3"345 SY$25.00$16.50$25.00$27.21
503E21320 UNCLASSIFIED EXCAVATION, INCLUDING ROCK1 LS$8,000$6,625$4,500$10,500
614E11000 MAINTAINING TRAFFIC1 LS$7,220$12,420$4,126$7,730
202E23000 PAVEMENT REMOVED327 SY$20.00$19.00$24.76$29.17
Show all 42 line items
ItemQuantityR1Shelly & Sands INCR2Rudzik Excavating INCR3Eclipse CO LLCR4Ohio-west Virginia Excavating CO
202E38000 GUARDRAIL REMOVED263 FT$7.50$6.00$2.00$8.46
203E20000 EMBANKMENT8 CY$60.00$100$33.39$103
204E10000 SUBGRADE COMPACTION395 SY$6.00$3.00$1.21$2.91
204E21001 GRANULAR EMBANKMENT, AS PER PLAN32 CY$154$128$139$205
204E50000 GEOTEXTILE FABRIC , 712.09 TYPE D476 SY$3.00$3.00$3.53$7.76
601E34200 ROCK CHANNEL PROTECTION, TYPE C WITHOUT FILTER62 CY$105$135$113$216
659E10000 SEEDING AND MULCHING696 SY$4.50$3.00$4.45$5.58
659E20000 COMMERCIAL FERTILIZER0.09 TON$1,250$400$900$1,550
659E31000 LIME0.14 ACRE$150$5.00$10.00$200
659E35000 WATER5 MGAL$1.00$0.05$0.50$1.00
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $68,715.50 2 $78,809.95 3 $79,978.40 4 $76,464.965,000 EACH$1.00$1.00$1.00$1.00
407E20000 NON-TRACKING TACK COAT95 GAL$3.50$3.41$3.50$19.39
621E00100 RPM4 EACH$500$550$500$620
621E54000 RAISED PAVEMENT MARKER REMOVED4 EACH$70.00$50.00$68.34$40.60
626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL6 EACH$11.50$13.00$11.50$14.27
646E10010 EDGE LINE, 6"0.1 MILE$22,300$25,735$22,300$44,275
646E10200 CENTER LINE Section 4 - TRAFFIC CONTROL - Totals Awd $6,344.00 2 $6,770.00 3 $6,337.36 4 $10,662.440.05 MILE$35,300$34,370$35,300$70,100
614E12420 DETOUR SIGNING1 LS$3,200$3,190$2,900$3,600
616E10000 WATER Section 5 - MAINTENANCE OF TRAFFIC - Totals Awd $23,450.00 2 $8,195.00 3 $32,646.70 4 $32,950.005 MGAL$50.00$1.00$272$10.00
202E11200 PORTIONS OF STRUCTURE REMOVED1 LS$3,500$7,500$2,837$7,960
510E09950 DOWEL HOLES WITH CEMENT GROUT148 EACH$24.00$40.00$66.21$50.00
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$3,250$5,700$8,071$8,200

Project details

Description
BEL-SR 149-15.10
Type of work
Earthwork

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →