BID #260006 · ODOTRESULT · awarded Jan 15

ATH-SR 13-13.71

ATH County · est $1.0M

Bid dateThursday, January 15
Awarded toD G M INC$886,436.25
read → connected → answeredcassandri

Project scope

Bid form · ODOT

41ITEMS
  • Maintaining Traffic20%
  • Earthwork17%
  • Erosion & Landscaping10%
  • Signs10%
  • Pavement Marking7%
  • Guardrail & Barrier5%
  • Other32%

Top items by winning bid

ItemQtyUnit priceExtended%
203E10000 EXCAVATION25,147 CY$20$503k57%
201E11000 CLEARING AND GRUBBING1 LS$80,000$80k9%
614E11000 MAINTAINING TRAFFIC1 LS$57,500$58k6%
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$45,000$45k5%
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG Section 4 - PAVEMENT - Totals Awd $28,394.70 2 $33,098.25 3 $32,880.69 4 $42,870.00 5 $27,878.16 6 $25,788.00 7 $27,015.0072 CY$450$32k4%
624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $104,855.22 2 $140,500.00 3 $112,000.00 4 $145,000.00 5 $135,000.00 6 $137,500.00 7 $104,157.501 LS$25,000$25k3%
208E15000 PRESPLITTING581 SY$40$23k3%
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $45,403.91 2 $52,045.00 3 $43,078.50 4 $102,564.00 5 $102,810.67 6 $59,839.50 7 $51,847.7315,000 EACH$1$15k2%
659E10001 SEEDING AND MULCHING, AS PER PLAN7,423 SY$2$15k2%
622E41100 PORTABLE BARRIER, UNANCHORED Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $36,307.76 2 $29,410.00 3 $36,208.00 4 $41,470.00 5 $32,420.84 6 $63,244.00 7 $35,337.80480 FT$30$14k2%

Per-bidder unit pricing

ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.

Rank 1D G M INC$886kRank 2Allard Excavation LLC$985kRank 3Shelly & Sands INC$1.05MRank 4R C Construction Company And Son INC$1.22MRank 5Alan Stone CO INC$1.29MRank 6Mc Kee Paving & Sealing LLC$1.32MRank 7Sunesis Construction CO$2.05M
ItemQuantityR1D G M INCR2Allard Excavation LLCR3Shelly & Sands INCR4R C Construction Company And Son INCR5Alan Stone CO INCR6Mc Kee Paving & Sealing LLCR7Sunesis Construction CO
203E10000 EXCAVATION25,147 CY$20.00$26.00$24.50$23.00$30.00$35.00$63.62
201E11000 CLEARING AND GRUBBING1 LS$80,000$65,000$121,300$125,000$140,000$90,000$103,400
614E11000 MAINTAINING TRAFFIC1 LS$57,500$38,874$29,000$30,000$70,000$40,000$38,695
103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM1 LS$45,000$7,456$5,000$30,000$18,000$20,000$11,423
441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG Section 4 - PAVEMENT - Totals Awd $28,394.70 2 $33,098.25 3 $32,880.69 4 $42,870.00 5 $27,878.16 6 $25,788.00 7 $27,015.0072 CY$450$386$450$575$378$350$365
624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $104,855.22 2 $140,500.00 3 $112,000.00 4 $145,000.00 5 $135,000.00 6 $137,500.00 7 $104,157.501 LS$25,000$50,000$57,000$45,000$25,000$65,000$43,939
208E15000 PRESPLITTING581 SY$40.00$37.00$19.00$175$75.00$45.00$92.60
832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $45,403.91 2 $52,045.00 3 $43,078.50 4 $102,564.00 5 $102,810.67 6 $59,839.50 7 $51,847.7315,000 EACH$1.00$1.00$1.00$1.00$1.00$1.00$1.00
659E10001 SEEDING AND MULCHING, AS PER PLAN7,423 SY$2.00$2.00$1.00$5.00$8.87$2.00$2.22
622E41100 PORTABLE BARRIER, UNANCHORED Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $36,307.76 2 $29,410.00 3 $36,208.00 4 $41,470.00 5 $32,420.84 6 $63,244.00 7 $35,337.80480 FT$30.00$43.00$32.00$30.00$21.00$81.00$43.49
623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING1 LS$13,000$8,525$21,000$40,000$22,000$12,500$10,100
208E16000 HYDROLOGIST Section 1 - ROADWAY - Totals Awd $760,311.00 2 $623,180.00 3 $813,120.50 4 $855,056.00 5 $984,385.00 6 $1,025,640.00 7 $1,819,752.741 LS$12,000$4,547$38,000$10,000$21,000$18,000$30,400
832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA1 LS$10,000$3,524$9,932$10,000$8,231$10,500$9,934
832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS1 LS$7,000$6,820$6,000$20,000$6,673$13,000$4,284
614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN6 SNMT$1,000$1,705$1,500$2,000$2,000$1,800$865
614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS$2,500$697$2,350$3,000$3,400$4,500$2,381
208E12000 BLASTING CONSULTANT1 LS$3,000$7,388$7,000$10,000$8,500$6,800$18,500
621E00100 RPM18 EACH$160$171$150$200$233$175$160
832E15000 STORM WATER POLLUTION PREVENTION PLAN1 LS$2,500$2,273$2,000$10,000$3,000$3,500$3,100
630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST48 FT$45.00$36.00$32.00$35.00$19.90$45.00$32.00
Show all 41 line items
ItemQuantityR1D G M INCR2Allard Excavation LLCR3Shelly & Sands INCR4R C Construction Company And Son INCR5Alan Stone CO INCR6Mc Kee Paving & Sealing LLCR7Sunesis Construction CO
208E10000 PRE-BLAST CONDITION SURVEY1 LS$1,000$4,647$4,280$10,000$6,500$1,250$4,800
208E13000 AIR BLAST AND NOISE CONTROL1 LS$500$1,705$7,700$10,000$5,200$1,650$3,500
208E14000 VIBRATION CONTROL AND MONITORING1 LS$500$1,705$7,700$10,000$5,200$1,650$5,500
659E10000 SEEDING AND MULCHING538 SY$1.00$2.00$2.00$5.00$4.27$2.25$3.38
659E20000 COMMERCIAL FERTILIZER1.07 TON$1,500$1,421$1,250$2,900$979$1,300$845
659E31000 LIME1.64 ACRE$300$171$150$2,800$400$200$161
659E35000 WATER64 MGAL$1.00$1.00$1.00$1.00$1.00$1.00$1.00
611E97300 CONDUIT, MISC.: REVIEW OF DRAINAGE FACILITIES Section 3 - DRAINAGE - Totals Awd $1,564.00 2 $500.00 3 $500.00 4 $15,000.00 5 $2,300.00 6 $1,500.00 7 $5,508.561 LS$500$1,564$500$15,000$2,300$1,500$5,509
407E10000 TACK COAT147 GAL$4.75$4.10$3.27$10.00$4.72$4.00$5.00
621E54000 RAISED PAVEMENT MARKER REMOVED18 EACH$1.00$10.00$31.00$50.00$24.15$5.00$30.16
630E08600 SIGN POST REFLECTOR2 EACH$140$114$100$250$60.00$115$100
630E80100 SIGN, FLAT SHEET (W1-6) (24"x48")16 SF$50.00$91.00$80.00$250$34.43$100$80.00
630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL2 EACH$40.00$28.00$250$50.00$31.14$300$250
630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA4 EACH$30.00$28.00$125$50.00$37.13$150$125
642E00104 EDGE LINE, 6", TYPE 10.26 MILE$3,500$2,273$2,000$9,500$6,519$4,000$3,000
642E00300 CENTER LINE, TYPE 1 Section 5 - TRAFFIC CONTROL - Totals Awd $8,020.09 2 $7,703.00 3 $8,314.00 4 $14,685.00 5 $9,634.99 6 $10,380.00 7 $8,608.880.13 MILE$3,500$4,547$4,000$9,500$11,359$7,000$3,000
614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST16 HOUR$60.00$97.00$105$20.00$80.00$125$75.00
614E11630 INCREASED BARRIER DELINEATION480 FT$2.00$2.00$1.40$10.00$3.30$2.25$1.81
614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT0.12 MILE$14,000$9,548$8,400$12,500$5,024$9,500$12,500
614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT24 FT$15.00$14.00$12.00$100$1.00$12.25$10.00
616E10000 WATER50 MGAL$1.00$1.00$70.00$1.00$1.00$1.00$14.04

Project details

Description
ATH-SR 13-13.71
Type of work
Earthwork

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →