Skip to content
Figure 0.1 · BRIEFING
BID #CN264017 · TDOTRESULT · awarded Mar 20

HARDEMAN 35S100-S8-004 — The resurfacing (using either mill, BM2 and D mix or CIR and microsurface) on S.

HARDEMAN County

Bid dateFriday, March 20
read → connected → answeredcassandri

Project details

Description
The resurfacing (using either mill, BM2 and D mix or CIR and microsurface) on S.R. 100 from near S.R. 18 (L.M. 15.31) to near Firetower Road (L.M. 19.22).

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →