Minor Reconstruction
Mercer County
Bid dateThursday, June 11—
Mercer County
Bid form · ODOT
Cost concentration table renders only when the active letting’s own line items are present. The donut above is aggregated from this bid.
As advertised by ODOT — 24 pay items with quantities and units. Contractor unit prices appear here once bids open.
| # | Item | Description | Quantity |
|---|---|---|---|
| 1 | 202E23000 | PAVEMENT REMOVED | 1,103 SY |
| 2 | 203E10000 | EXCAVATION | 292 CY |
| 3 | 204E60000 | SPECIAL - GEOCELL, SUBGRADE, 6" THICKNESS | 1,357 SY |
| 4 | 659E10000 | SEEDING AND MULCHING | 360 SY |
| 5 | 659E20000 | COMMERCIAL FERTILIZER | 0.04 TON |
| 6 | 659E35000 | WATER | 3 MGAL |
| 7 | 832E30000 | EROSION CONTROL | 6,000 EACH |
| 8 | 605E31100 | AGGREGATE DRAINS | 102 FT |
| 9 | 301E56000 | ASPHALT CONCRETE BASE, PG64-22, (449) | 215 CY |
| 10 | 304E20000 | AGGREGATE BASE | 298 CY |
| 11 | 407E20000 | NON-TRACKING TACK COAT | 180 GAL |
| 12 | 411E10000 | STABILIZED CRUSHED AGGREGATE | 303 CY |
| 13 | 441E70100 | ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG70-22M | 49 CY |
| 14 | 441E70300 | ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (449) | 52 CY |
| 15 | 617E10100 | COMPACTED AGGREGATE | 18 CY |
| 16 | 621E00100 | RPM | 6 EACH |
| 17 | 621E54000 | RAISED PAVEMENT MARKER REMOVED | 6 EACH |
| 18 | 642E00104 | EDGE LINE, 6", TYPE 1 | 0.14 MILE |
| 19 | 642E00300 | CENTER LINE, TYPE 1 | 0.07 MILE |
| 20 | 103E05000 | PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND | Lump sum |
| 21 | 614E11000 | MAINTAINING TRAFFIC | Lump sum |
| 22 | 614E12420 | DETOUR SIGNING | Lump sum |
| 23 | 623E10000 | CONSTRUCTION LAYOUT STAKES AND SURVEYING | Lump sum |
| 24 | 624E10000 | MOBILIZATION PID #: 125150 Contract ID: MER125150 EDGE Goal: 5.0% MERCER MER/LOG-SR 49/SR 559-23.45/03.53 NON-FEDERAL MINOR RECONSTRUCTION THE 2023 CONSTRUCTION AND MATERIAL SPECIFICATION BOOK IS PART OF THE BIDDING DOCUMENTS ON THIS PROJECT PROPOSAL STATE OF OHIO DEPARTMENT OF TRANSPORTATION Pamela Boratyn, Director June 11, 2026 Submitted by Bidder Id | Lump sum |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →