WOO-Roche De Boeuf Interurban
WOO County · est $3.5M
Bid dateThursday, April 9—
Awarded toKOKOSING CONSTRUCTION COMPANY INC$3.06M
WOO County · est $3.5M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $2,591,407 | $2.59M | 85% |
| 624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $191,501.00 2 $238,900.00 3 $333,000.00 | 1 LS | $154,400 | $154k | 5% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $125,804.15 2 $151,432.00 3 $138,193.50 | 75,000 EACH | $1 | $75k | 2% |
| 203E20000 EMBANKMENT | 1,200 CY | $54 | $65k | 2% |
| 661E99900 PLANTING, MISC.: 1-GALLON CONTAINER SHRUB | 500 EACH | $62 | $31k | 1% |
| 661E99900 PLANTING, MISC.: 1" CALIPER, 3-GALLON CONTAINER TR | 168 EACH | $175 | $29k | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $25k | 1% |
| 659E00300 TOPSOIL | 306 CY | $70 | $21k | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $12k | 0% |
| 607E98000 FENCE, MISC.: TEMPORARY CONSTRUCTION FENCE Section 1 - ROADWAY - Totals Awd $85,319.00 2 $66,450.00 3 $133,490.00 | 2,500 FT | $3.75 | $9k | 0% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 6 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2Geddis Paving & Excavating INC | R3L M Sessler Excavating & Wrecking INC | % of bid |
|---|---|---|---|---|---|
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $2,591,407 | $1,350,000 | $4,950,000 | 85% |
| 624E10000 MOBILIZATION Section 5 - INCIDENTALS - Totals Awd $191,501.00 2 $238,900.00 3 $333,000.00 | 1 LS | $154,400 | $152,000 | $150,000 | 5% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $125,804.15 2 $151,432.00 3 $138,193.50 | 75,000 EACH | $1.00 | $1.00 | $1.00 | 2% |
| 203E20000 EMBANKMENT | 1,200 CY | $54.00 | $25.00 | $40.00 | 2% |
| 661E99900 PLANTING, MISC.: 1-GALLON CONTAINER SHRUB | 500 EACH | $62.00 | $64.00 | $85.00 | 1% |
| 661E99900 PLANTING, MISC.: 1" CALIPER, 3-GALLON CONTAINER TR | 168 EACH | $175 | $300 | $350 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $30,000 | $120,000 | 1% |
| 659E00300 TOPSOIL | 306 CY | $70.00 | $90.00 | $75.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $37,000 | $35,000 | 0% |
| 607E98000 FENCE, MISC.: TEMPORARY CONSTRUCTION FENCE Section 1 - ROADWAY - Totals Awd $85,319.00 2 $66,450.00 3 $133,490.00 | 2,500 FT | $3.75 | $8.00 | $15.00 | 0% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $9,000 | $18,500 | $10,000 | 0% |
| 662E31000 LANDSCAPE WATERING Section 3 - LANDSCAPING - Totals Awd $68,269.00 2 $90,269.00 3 $113,103.50 | 7,869 GAL | $1.00 | $1.00 | $1.50 | 0% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,800 | $6,000 | $25,000 | 0% |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $7,000 | $15,000 | $10,000 | 0% |
| 659E14000 REPAIR SEEDING AND MULCHING | 2,229 SY | $3.00 | $3.00 | $4.00 | 0% |
| 659E10000 SEEDING AND MULCHING | 1,127 SY | $3.00 | $3.00 | $4.00 | 0% |
| 203E10000 EXCAVATION | 418 CY | $8.00 | $25.00 | $55.00 | 0% |
| 670E00500 SLOPE EROSION PROTECTION | 1,127 SY | $1.80 | $2.00 | $2.50 | 0% |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,025 | $2,800 | $3,500 | 0% |
| 659E20000 COMMERCIAL FERTILIZER | 0.15 TON | $850 | $800 | $1,200 | 0% |
| Item | Quantity | R1Kokosing Construction Company INC | R2Geddis Paving & Excavating INC | R3L M Sessler Excavating & Wrecking INC |
|---|---|---|---|---|
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $60.00 | $60.00 | $100 |
| 659E31000 LIME | 0.23 ACRE | $35.00 | $100 | $500 |
| 659E35000 WATER | 7 MGAL | $1.00 | $1.00 | $1.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING Section 4 - STRUCTURE OVER 20 FOOT SPAN (ROCHE DE BO - Totals Awd $2,591,408.35 2 $2,650,000.00 3 $4,950,001.00 | 1 LS | $1.00 | $1,300,000 | $1.00 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $100 | $3,500 | $8,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1.00 | $16,400 | $20,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →