IREDELL, MECKLENBURG — PAVEMENT RECONSTRUCTION AND RESURFACING ON I-77 RAMPS AT US 21 (SUNSET BOULEVARD) SR 2143 (HARRIS BOULEVARD.), NC 73 (SAM FURR ROAD), SR 2158 (GRIFFITH STREET) AND SR 1109 (WILLIAMSON ROAD).
IREDELL, MECKLENBURG County · est $11M · plans pulled by 14 GCs
Plan pull14 GCs, of which 9 repeatMay 11
PatternPlan-pulls accelerating · 6 in last 10 daysconf. 0.59
Sub mixAsphalt unit pricing held flat3-yr basis
Bid dateTuesday, May 19—
Project scope
Typical scope · median of 21 comparable bids (NCDOT pavement, last 24 mo)
120512%
SP9%
6073%
6103%
8623%
9043%
Other68%
Cost concentration table renders only when the active letting’s own line items are present. The donut above is aggregated from 21 historical comparable bids.
Project details
Description
PAVEMENT RECONSTRUCTION AND RESURFACING ON I-77 RAMPS AT US 21 (SUNSET BOULEVARD) SR 2143 (HARRIS BOULEVARD.), NC 73 (SAM FURR ROAD), SR 2158 (GRIFFITH STREET) AND SR 1109 (WILLIAMSON ROAD).
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →