Skip to content
Figure 0.1 · BRIEFING
BID #7380-269 · MnDOTPRE‑BID · 242 DAYS

TH 94: Br #73877 and Br 73878 in St Joe Twp-Bridge overlay

est $3.0M

Bid dateWednesday, January 27
read → connected → answeredcassandri

Project scope

Typical scope · median of 10 comparable bids (MnDOT bridge, last 24 mo)

101ITEMS
  • 0001 SP 2789-18910%
  • 0001 SP 8716-01 & 8716-0310%
  • 0001 SP 2905-3910%
  • 0001 SP 1108-1110%
  • 0001 SP 6933-1018%
  • 0001 SP 1211-918%
  • Other45%

Cost concentration table renders only when the active letting’s own line items are present. The donut above is aggregated from 10 historical comparable bids.

Project details

Description
Br #73877 and Br 73878 in St Joe Twp-Bridge overlay ELLE From 12/2/26
Type of work
Br #73877 and br 73878 in st joe twp Bridge overlay

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →